Skip to main content
PermitBase

Avon building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Avon, Colorado.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
100 Mikaela Way, P.O. Box 975, Avon, CO 81620
Phone
970-748-4030
Office hours
8:00 a.m. - 5:00 p.m., Monday - Friday. Building Official Derek Place: dplace@avon.org, 970-748-4011. Building Inspector Matt Waldrop: mwaldrop@avon.org, 970-748-4098. Community Development Coordinator Emily Block: eblock@avon.org, 970-748-4012. Main Town line: 970-748-4000.

Inspection guide

See how inspections work in Avon — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2021 International Building Code (IBC) — Town of Avon Adopted Building Codes page
  • 2021 International Residential Code (IRC)
  • 2021 International Energy Conservation Code (IECC)
  • 2021 International Plumbing Code (IPC)
  • 2021 International Fuel Gas Code (IFGC)
  • 2021 International Mechanical Code (IMC)
  • 2021 International Fire Code (IFC), with additions and exceptions per the Eagle River Fire Protection District (ERFPD)
  • 2021 International Swimming Pool and Spa Code
  • 2021 International Property Maintenance Code
  • 2021 International Wildland-Urban Interface Code
  • 2023 National Electrical Code (NEC) — administered by the Colorado Department of Regulatory Agencies (DORA), not the Town, per the Town's own 'Common Building Permit Types' document
  • ICC A117.1-2017 Standard for Accessible and Usable Buildings and Facilities
  • Note on code currency: Avon's adopted-codes list (2021 I-Codes cycle) is one cycle behind Vail's currently posted 2024 I-Codes list within the same county — confirmed directly against the Town's own Adopted Building Codes page as of this review; do not assume parity with Vail's code edition.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
0units

0 buildings · $0 valuation

Trailing 12 months
20units

12 of 12 months reported · #46 in Colorado coverage by units

Year to date (2026 YTD through 2026-05)
0units

0 buildings · $0 valuation

5 month(s) reported to Census

Full year 2025
24units

24 buildings · $14.6M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Avon is a home-rule town with its OWN Community Development Department, Building Division (100 Mikaela Way) — Eagle County's Building Division explicitly excludes all incorporated towns within the county, including Avon, from its unincorporated permitting program. Confirm any near-boundary parcel's jurisdiction before assuming county rules apply.
  • UNIQUE TO AVON WITHIN EAGLE COUNTY: the Town does NOT issue electrical permits at all — 'The Town of Avon does not manage electrical permits, these go through the Colorado Department of Regulatory Agencies' (DORA), per the Town's own Common Building Permit Types guide and confirmed independently by the Building Permit Fee Schedule's own footnote. This is a structurally different model from Vail (same county), which issues its own electrical permits with a 15% local surcharge on the state base rate. Do not assume every Eagle County town matches Vail's electrical-permitting model.
  • Avon's adopted code cycle (2021 I-Codes, 2023 NEC) is one edition behind Vail's currently posted 2024 I-Codes cycle in the same county — confirm the current edition directly with the Building Official (970-748-4011) before finalizing a code analysis rather than assuming county-wide code parity.
  • Avon publishes a genuine general review-timeline commitment (rare in this corpus for a home-rule CO jurisdiction): completeness check within 2 business days, then 1-2 weeks for smaller projects or 4-6 weeks for larger remodels/new construction, per the Town's General Department Information page. This is the Town's own stated figure, not an estimate.
  • Solar PV installations require THREE separate authorities' sign-off: the Town (building permit, flat fee), the Eagle River Fire Protection District (fire permit/inspection), and DORA (electrical permit/inspection) — a materially more fragmented process than a typical single-authority permit.
  • A Contractor Business License (via Cloudpermit) is required before the Town will issue a building permit; combined with the Town's sales/use-tax rules (4% use tax on construction materials for $250,000+ valuation projects, effective January 1, 2025), confirm both tax and licensing status before submitting.
  • Exterior work (windows, doors, siding, decks, re-roofs, signs, new structures) may trigger Planning Division Development Plan review (Minor or Major) in addition to Building Division permit review — a genuinely distinct process from Vail's Design Review Board but serving a similar function; not folded into this file's permitType review timelines.
  • Cosmetic-only interior work (cabinets, countertops, flooring, interior paint) and simple like-for-like plumbing fixture swaps are explicitly exempt from a building permit in Avon, per the Town's own General Department Information and Common Building Permit Types pages.
  • Fire Department permits for fire alarm, fire sprinkler, event/tent, and fireworks do NOT require a Town of Avon building permit (ERFPD-only), while EV charge stations, hot-work welding, solar electrical PV, and kitchen hoods DO require a Town building permit in addition to any ERFPD permit — a specific split worth checking per project type.
  • The Colorado DORA Division of Professions and Occupations electrical-permit pages (dpo.colorado.gov/Electrical/PermitsandInspections and dpo.colorado.gov/EandP/Permits) returned a genuine server-rendered 'Access denied' response to direct fetch during this research session — not a WAF false-positive, confirmed by the page's own title tag. DORA fee/timeline figures for the electrical-permit entry in this file are therefore left honestly unpublished rather than reused from a stale 2016 neighboring-town PDF or inferred from Vail's locally-surcharged rate.

Comparable nearby cities

Eagle
Both in Eagle County8 shared permit typesBoth on the 2021 International Mechanical Code (IMC)~16 mi away
Compare fees →
Gypsum
Both in Eagle County8 shared permit typesBoth on the 2021 International Residential Code (IRC)~23 mi away
Compare fees →
Basalt
Both in Eagle County8 shared permit typesBoth on the 2021 International Mechanical Code (IMC)~34 mi away
Compare fees →