Gypsum building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Gypsum, Colorado.
Last verified 2026-08-17 · Source · Embed this page’s badge · Version history
Building department
- Address
- 50 Lundgren Blvd, Gypsum, CO 81637 (mailing: PO Box 130, Gypsum, CO 81637)
- Phone
- 970-524-1731
- Office hours
- Building Department Staff available Monday-Friday, 8 a.m.-5 p.m., per the Building Permit Application page. Primary staff contact listed: Stephanie Roybal, Building Department Administrative Assistant. General Town phone line also published as 970-524-7514 on several Building Department sub-pages (DRB/HOA Review, Hours & Site Conditions).
- Website
- Official site
- Permit portal
- Apply online at Gypsum's portal
Inspection guide
See how inspections work in Gypsum — sequence, scheduling & re-inspection fees.
Codes adopted
Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.
- 2021 International Building Code (IBC) — Town of Gypsum Building Codes & Guidelines page
- 2021 International Residential Code (IRC)
- 2021 International Fire Code (IFC)
- 2021 International Plumbing Code (IPC)
- 2021 International Mechanical Code (IMC)
- 2021 International Fuel Gas Code (IFGC)
- 2018 International Energy Conservation Code (IECC) — note this is one code cycle behind the 2021 IBC/IRC/IFC/IPC/IMC/IFGC family adopted alongside it; confirmed as published, not a transcription error
- 2023 National Electrical Code (NEC)
- ICC/ANSI A117.1 Accessibility Standards, 2009 Edition
- Local amendments to all adopted codes are codified in Title 15 (Buildings and Construction) of the Gypsum Municipal Code; Title 15's full text is hosted on Municode (library.municode.com/co/gypsum). Specific amendment section numbers and text beyond what the Town's own townofgypsum.com pages state are not reproduced here.
Permit types & fees
Residential Building Permit (New Construction)
Required for new construction of single-family homes, duplexes, and townhomes in the Town of Gypsum. Reviewed under the 2021 IRC/IBC as locally adopted plus the Town's published design criteria (40 psf ground snow load, 90 mph wind design exposure, 42-inch frost depth, Seismic Design Category C). Issued by the Community Development Department, Building Department, after Design Review Board/HOA approval where applicable.
From$1.00valuation-basedResidential Addition / Remodel Permit
Required for additions and interior remodels/finishes to existing single-family, duplex, and townhome structures in Gypsum, including basement finishes, garages, patio covers, and uncovered decks, each covered by a dedicated 2021 Town building guide. Reviewed under the 2021 IRC as locally adopted.
From$1.00valuation-basedElectrical Permit
Required for installation, alteration, or repair of electrical systems in Gypsum, issued as a separate permit from the general Building Permit per the Town's own application form. Governed by the 2023 NEC as adopted.
See fee schedulePlumbing Permit
Required for installation, alteration, or repair of plumbing systems in Gypsum, issued as a separate permit from the general Building Permit. Governed by the 2021 International Plumbing Code (IPC) as adopted.
From$60.00valuation-basedMechanical / HVAC Permit
Required for heating, cooling, and ventilation equipment installation or replacement in Gypsum, issued as a separate permit from the general Building Permit. Governed by the 2021 International Mechanical Code (IMC) and 2021 International Fuel Gas Code (IFGC) as adopted.
From$60.00valuation-basedRoofing Permit (Re-Roof)
Required for re-roofing work in the Town of Gypsum. Smaller re-roof projects that do not require plans are eligible for the Town's one-time permit application process rather than the full plan-submittal portal. Governed by the 2021 IRC/IBC as adopted.
$60.00Accessory Dwelling Unit (ADU) Permit
Required for construction of a new Accessory Dwelling Unit, or to bring an existing non-approved ADU into compliance, on a single-family lot in Gypsum. Processed alongside a standard Building Permit for the structure itself, plus a dedicated ADU application, deed restriction, and utility documentation.
From$250Solar Photovoltaic (PV) Permit
Required for installation of rooftop or ground-mount solar photovoltaic systems within Gypsum town limits. The Town's own Build in Gypsum guidance states directly: "Solar panel projects do require plan submittal, review, and a permit," processed through the same Building Plan Submittal portal (gopost-gypsum.eplansoftreview.com) used for all other building permits — no dedicated solar/photovoltaic application, checklist, or fee line is published separately.
From$1.00valuation-basedEV Charger / Electric Vehicle Charging Station Permit
Installing an EV charger circuit in Gypsum requires a separate Electrical Permit from the Town's Building Department, governed by the 2023 NEC as locally adopted -- the same standalone Electrical Permit process (distinct from the general Building Permit) described in the electrical-permit entry. The Town does not publish a dedicated EV-charger/EVSE fee line, application, or checklist. The trade-specific electrical fee table does not appear on the Town's website or in its 2025 Annual Fee Schedule PDF (explicitly labeled partial and containing no permit valuation tables); it is codified in Title 15 of the Municipal Code (hosted on Municode).
See fee scheduleCommercial Building Permit
Required for new commercial and industrial construction, and for commercial additions, alterations (including tenant improvements/finishes), and repairs within Gypsum town limits. Issued by the Town of Gypsum Community Development Department, Building Department — the Town's own single Building Permit Application form covers commercial work via its use-classification checkboxes ('Residential, Commercial, Industrial, Other') and class-of-work options ('New, Addition, Alteration, Repair, Move, Remove'); there is no separate commercial application form. Reviewed under the 2021 IBC as locally adopted (2021 IFC, 2021 IPC/IMC/IFGC, 2023 NEC, 2018 IECC, ICC/ANSI A117.1-2009 accessibility). Commercial projects carry occupancy-stage requirements that residential projects do not: a completed and approved Planning and Engineering Department inspection, Fire Department review and approval where required, and a $3,000 TCO deposit.
From$1.00valuation-basedSign Permit
Gypsum's zoning regulations, including sign standards, are codified under Municipal Code Title 18 (Zoning), hosted on Municode Library. A specific sign-code chapter number is not separately identified; the Town's own website directs applicants to Planning & Zoning for zoning-related permits, including signs. Sign permits are administered by the Community Development Department alongside general building permits.
From$30.00Fire Sprinkler / Fire Alarm System Permit
Fire protection for the Town of Gypsum is provided by the Gypsum Fire Protection District (GFPD), a combination department (11 full-time, 5 part-time, and 11 volunteer firefighters) covering approximately 455 square miles across Eagle County, including the Town of Gypsum itself, per the District's own website. GFPD's public site publishes burn permit and child car seat services but did not include specific published fire sprinkler or fire alarm system permit fee/process details as of the last verification.
See fee scheduleChange of Use / Change of Occupancy
Gypsum does not publish a standalone 'Change of Use' or 'Change of Occupancy' permit application separate from its general building permit process — the Town's Build in Gypsum page covers general construction permitting steps, contractor licensing, and inspections but does not separately address a change-of-use process. A use/occupancy change is presumed to be processed through the Town's general Building Permit Application; contact the Building Department to confirm requirements and applicable code edition for a specific project.
See fee schedule
Gypsum's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Gypsum yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Gypsum lands. Privacy.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-07)
- 18units
18 buildings · $4.4M valuation
- Trailing 12 months
- 154units
12 of 12 months reported · #26 in Colorado coverage by units
- Year to date (2026 YTD through 2026-07)
- 126units
68 buildings · $31.5M valuation
7 month(s) reported to Census
- Full year 2025
- 59units
59 buildings · $13.1M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity
Tips & gotchas
- Gypsum is an incorporated statutory town with its OWN Community Development Department, Building Department (50 Lundgren Blvd) — Eagle County's Building Division explicitly excludes all incorporated towns within the county, including Gypsum, from its unincorporated permitting program. This is a fully independent authority model, the same pattern found in neighboring Vail (also independent), though authority models vary among Eagle County mountain towns.
- Gypsum's published design criteria (40 psf ground snow load, 90 mph wind design, 42-inch frost depth, Seismic Design Category C) are notably lighter than Vail's (145 psf, 115 mph, 48-inch frost, Category B) — Gypsum sits at lower valley elevation along I-70. Do not reuse a peer Eagle County mountain jurisdiction's structural design assumptions for a Gypsum project.
- Electrical, Plumbing, and Mechanical each require their OWN standalone permit in Gypsum, separate from the general Building Permit — the Town's Building Permit Application form states it directly: 'separate permits are required for Electrical, Plumbing, Mechanical'.
- The Town's own 2025 Annual Fee Schedule PDF is explicitly labeled 'partial' by the Town itself and does NOT contain a valuation-based building/trade permit fee table — that table lives in Title 15 of the Municipal Code, hosted on Municode. Call the Building Department (970-524-1731) directly for a project-specific fee quote.
- The Town publishes NO numeric plan-review turnaround (days or weeks) for any standard building-permit category anywhere on its site — not on the Build in Gypsum page, the Building Permit Application, the Plan Requirements page, the Inspections page, the Forms/Permits/Applications page, or the 2025 Annual Fee Schedule. Colorado is home-rule with no statewide clock.
- All contractors need a Town of Gypsum Contractor's License ($90/year in 2026, $80/year in 2025) in addition to any Colorado state trade license — renewal is due by April 1st annually or a late fee applies (except contractors not engaged in Town work until mid-year).
- Smaller projects that don't require a full plan set — a new roof, electrical panel upgrades, or plumbing fixture replacement are the Town's own named examples — can use a simpler one-time permit application rather than the full Building Permit & Plan Submittal portal process.
- DRB or HOA approval is required before Town submittal for any parcel outside the Eagle River Estate or Bertroch developments; the Town's four core districts (The Front Door, The River, The Yard, The Market) carry additional Master Plan DRB requirements. Contact Town staff (stephanie@townofgypsum.com) to confirm which DRB/HOA governs a specific parcel — no master list is published on the site.
- ADUs are capped at 800 sq ft or 50% of the primary dwelling (whichever is smaller), limited to one per lot, require owner-occupancy of the primary residence, and carry their own fee schedule ($250 new construction, $500 for an existing non-approved unit, $50 transfer re-inspection, $43 deed restriction recording) distinct from the general building-permit fee gap.
- Base permit fee includes only four inspections; every inspection beyond that (including re-inspections) costs $60 and requires 24-hour advance notice — plan your inspection sequence accordingly.
- Gypsum's website runs on a CivicPlus-family platform; the Build in Gypsum page is at townofgypsum.com/build-in-gypsum.