Skip to main content
PermitBase

Gypsum building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Gypsum, Colorado.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
50 Lundgren Blvd, Gypsum, CO 81637 (mailing: PO Box 130, Gypsum, CO 81637)
Phone
970-524-1731
Office hours
Building Department Staff available Monday-Friday, 8 a.m.-5 p.m., per the Building Permit Application page. Primary staff contact listed: Stephanie Roybal, Building Department Administrative Assistant. General Town phone line also published as 970-524-7514 on several Building Department sub-pages (DRB/HOA Review, Hours & Site Conditions).

Inspection guide

See how inspections work in Gypsum — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2021 International Building Code (IBC) — Town of Gypsum Building Codes & Guidelines page
  • 2021 International Residential Code (IRC)
  • 2021 International Fire Code (IFC)
  • 2021 International Plumbing Code (IPC)
  • 2021 International Mechanical Code (IMC)
  • 2021 International Fuel Gas Code (IFGC)
  • 2018 International Energy Conservation Code (IECC) — note this is one code cycle behind the 2021 IBC/IRC/IFC/IPC/IMC/IFGC family adopted alongside it; confirmed as published, not a transcription error
  • 2023 National Electrical Code (NEC)
  • ICC/ANSI A117.1 Accessibility Standards, 2009 Edition
  • Local amendments to all adopted codes are codified in Title 15 (Buildings and Construction) of the Gypsum Municipal Code; Title 15's full text is hosted on Municode (library.municode.com/co/gypsum), which serves its content through a client-side Angular application behind an access-controlled API — direct fetch and a dated Wayback Machine snapshot (2026-02-13) both returned only the unrendered application shell with no section text recoverable, so specific amendment section numbers/text beyond what the Town's own townofgypsum.com pages state in plain HTML are not independently reproduced here rather than guessed.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
74units

16 buildings · $13.8M valuation

Trailing 12 months
138units

12 of 12 months reported · #24 in Colorado coverage by units

Year to date (2026 YTD through 2026-05)
108units

50 buildings · $27.1M valuation

5 month(s) reported to Census

Full year 2025
59units

59 buildings · $13.1M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Gypsum is an incorporated statutory town with its OWN Community Development Department, Building Department (50 Lundgren Blvd) — Eagle County's Building Division explicitly excludes all incorporated towns within the county, including Gypsum, from its unincorporated permitting program. This is a fully independent authority model, the same pattern found in neighboring Vail (also independent), though this session found real variation among Eagle County mountain towns and each one's authority model was verified individually rather than assumed.
  • Gypsum's published design criteria (40 psf ground snow load, 90 mph wind design, 42-inch frost depth, Seismic Design Category C) are notably lighter than Vail's (145 psf, 115 mph, 48-inch frost, Category B) — Gypsum sits at lower valley elevation along I-70. Do not reuse a peer Eagle County mountain jurisdiction's structural design assumptions for a Gypsum project.
  • Electrical, Plumbing, and Mechanical each require their OWN standalone permit in Gypsum, separate from the general Building Permit — confirmed directly from the Town's own Building Permit Application form language ('separate permits are required for Electrical, Plumbing, Mechanical').
  • The Town's own 2025 Annual Fee Schedule PDF is explicitly labeled 'partial' by the Town itself and does NOT contain a valuation-based building/trade permit fee table — that table is referenced as living in Title 15 of the Municipal Code, which is hosted on Municode as a JavaScript-rendered, access-controlled single-page application. Both a direct fetch attempt and a dated Wayback Machine snapshot (2026-02-13) returned only the unrendered application shell with zero recoverable section text — this is a genuine, honestly-documented data gap in every permitType's fees array, not an omission from insufficient effort. Call the Building Department (970-524-1731) directly for a project-specific fee quote.
  • The Town publishes NO numeric plan-review turnaround (days or weeks) for any standard building-permit category anywhere on its site — not on the Build in Gypsum page, the Building Permit Application, the Plan Requirements page, the Inspections page, the Forms/Permits/Applications page, or the 2025 Annual Fee Schedule. Colorado is home-rule with no statewide clock, and every permitType in this file is honestly null/unverified with a documented chase trail rather than an invented figure.
  • All contractors need a Town of Gypsum Contractor's License ($152/year per the 2025 fee schedule) in addition to any Colorado state trade license — renewal is due by April 1st annually or a late fee applies (except contractors not engaged in Town work until mid-year).
  • Smaller projects that don't require a full plan set — a new roof, electrical panel upgrades, or plumbing fixture replacement are the Town's own named examples — can use a simpler one-time permit application rather than the full Building Permit & Plan Submittal portal process.
  • DRB or HOA approval is required before Town submittal for any parcel outside the Eagle River Estate or Bertroch developments; the Town's four core districts (The Front Door, The River, The Yard, The Market) carry additional Master Plan DRB requirements. Contact Town staff (stephanie@townofgypsum.com) to confirm which DRB/HOA governs a specific parcel — no master list is published on the site.
  • ADUs are capped at 800 sq ft or 50% of the primary dwelling (whichever is smaller), limited to one per lot, require owner-occupancy of the primary residence, and carry their own fee schedule ($250 new construction, $500 for an existing non-approved unit, $50 transfer re-inspection, $43 deed restriction recording) distinct from the general building-permit fee gap.
  • Base permit fee includes only four inspections; every inspection beyond that (including re-inspections) costs $60 and requires 24-hour advance notice — plan your inspection sequence accordingly.
  • Gypsum's site is on the same CivicPlus-family platform pattern seen elsewhere in this corpus; direct URL guesses frequently 404 even when a very similar path is correct (e.g., 'business/build-in-gypsum' 404s while the shorter 'build-in-gypsum' 200s) — verify each exact working URL via search rather than assuming a consistent path structure across sub-pages.

Comparable nearby cities

Eagle
Both in Eagle County8 shared permit typesBoth on the 2021 International Mechanical Code (IMC)~7 mi away
Compare fees →
Basalt
Both in Eagle County8 shared permit typesBoth on the 2021 International Mechanical Code (IMC)~18 mi away
Compare fees →
Avon
Both in Eagle County8 shared permit typesBoth on the 2021 International Residential Code (IRC)~23 mi away
Compare fees →