Building department

Address
200 Broadway, PO Box 609, Eagle, CO 81631
Phone
970-328-9565
Office hours
General Building Division line (970) 328-9565; Inspection Hotline (970) 328-9626 (must call by 4:00 PM for next available inspection date). Due to limited staff capacity, the Town's own Building Department page states initial response times for phone calls and emails are approximately 3-5 business days. In-person appointments are recommended and should be scheduled by phone or email rather than walk-in. Chief Building Official: Dan Brown.

Inspection guide

See how inspections work in Eagle — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2021 International Building Code (IBC), with local amendments (Town of Eagle 2021 IBC Amendments)
  • 2021 International Residential Code (IRC), with local amendments (Town of Eagle 2021 IRC Amendments)
  • 2021 International Mechanical Code (IMC)
  • 2021 International Plumbing Code (IPC)
  • 2021 International Fuel Gas Code (IFGC)
  • 2021 International Existing Building Code (IEBC)
  • 2021 International Swimming Pool and Spa Code (ISPSC)
  • 2021 International Energy Conservation Code (IECC)
  • 2021 International Fire Code (IFC)
  • 2020 National Electrical Code (NEC)
  • Colorado State Wildfire Resiliency Code — adopted by the Town, effective for building-code review starting July 1, 2026
  • Snow load design data: per the Town's 2021 IRC Amendments (Table R301.2(1)), minimum roof ground snow load is set at 65 lb/ft2, cross-referencing the Structural Engineers Association of Colorado's 'Snow Load Design Data for Colorado' as the underlying methodology

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
46units

8 of 12 months reported · #38 in Colorado coverage by units

Year to date (2026 YTD through 2026-05)
7units

5 buildings · $6.6M valuation

1 month(s) reported to Census

Full year 2025
52units

20 buildings · $23.9M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • The Town of Eagle is a STATUTORY (non-home-rule) town with its own Community Development Department, Building Division (200 Broadway) — Eagle County's Building Division explicitly excludes all incorporated towns within the county, including Eagle, from its unincorporated permitting program. Confirm any near-boundary parcel's jurisdiction before assuming county rules apply.
  • CRITICAL AND UNUSUAL: electrical permits and inspections in the Town of Eagle are handled ENTIRELY by the State of Colorado (DPO/State Electrical Board), not the Town — verified independently via the DPO's own Electrical Local Inspection Areas list ('Eagle (Except Minturn and Town of Avon)'). Plumbing, by contrast, is handled locally by the Town. This split authority model is genuinely different from Vail (built earlier this session), where the Town itself administers electrical permits under a state-fee-schedule pass-through with a local surcharge. Do not assume all Eagle County mountain towns share one electrical-authority pattern.
  • The Town's own Building Department page candidly discloses initial response times for phone/email of approximately 3-5 business days due to limited staff capacity — budget lead time accordingly, distinct from the (unpublished) plan-review turnaround itself.
  • Eagle's Table R301.2(1) Climatic and Geographic Design Criteria (65 lb/ft2 ground snow load, 115 mph wind design speed, 48-inch frost depth, -22 F winter design temp, ice barrier underlayment required) is a genuinely different figure set from Vail's chart (145 psf snow load) — even neighboring Eagle County mountain towns should not be assumed to share identical design criteria.
  • Fence-height permit exemption in Eagle is 6 feet for residential side/rear-yard fences (amended DOWN from the model IRC's 7 feet), while the IBC amendments retain a 7-foot threshold for commercial-context fences — check which code amendment governs your specific fence before assuming a single number applies.
  • The Town publishes NO numeric plan-review turnaround (days or weeks) for any standard building-permit category anywhere on its site — not on the Building Department page, the Forms/Permits/Fees page, the 'Do I Need a Building Permit' page, or the 2026 Master Fee Schedule. Colorado has no statewide clock binding a statutory town's own review process, and every permitType in this file is honestly null/unverified with a documented chase trail rather than an invented figure.
  • Roof replacement (single-family) and demolition/move-a-structure share an identical flat $75 + Use Tax + Permit Issuance fee structure in the 2026 Fee Schedule — both are billed very differently from the general valuation-based Building Permit Fee table used for new construction and additions.
  • All contractors need a Town of Eagle contractor registration under Chapter 13.24 of the Eagle Municipal Code ($100/year General Contractor, $50/year Plumbing and/or Mechanical) — this is separate from any Colorado state trade license and separate again from the DPO's own electrical-contractor registration (which is federal/state, not town-issued, since the Town has no role in electrical permitting).
  • The Exterior Energy Offset Program (EEOP) applies to snowmelt systems and larger pools/spas/hot tubs (>64 sq ft) and is NOT modeled as its own permitType in this file since it's a compliance requirement attached to other permit types (an EEOP Calculation Worksheet submitted alongside the relevant building permit), not a standalone permit category — consistent with how this corpus handles similar riders (e.g. Vail's Recreation Fee, Transportation Impact Fee).
  • The Colorado State Wildfire Resiliency Code has been adopted by the Town but does not take effect for building-code review until July 1, 2026 — confirm with the Building Division whether your specific submittal date falls before or after this effective date, since this file's 'lastVerified' date is very close to that transition.
  • Solar/photovoltaic and formal accessory-dwelling-unit (ADU) permit types were investigated for the Town of Eagle specifically but NOT modeled as standalone permitTypes in this file — the town-specific requirements found in searches (solar-ready zone requirements, 30% solar-oriented lots) trace to Land Use & Development Code planning provisions rather than a distinct Building Division permit type with its own fee line, and no Town-specific ADU permit page or fee line (distinct from the general Building Permit Fee schedule) could be independently verified as of this review. Omitted rather than forced; a future extraction pass could revisit if the Town publishes ADU- or solar-specific building-permit documentation.

Comparable nearby cities

Basalt
Both in Eagle County9 shared permit typesBoth on the 2021 International Mechanical Code (IMC)~23 mi away
Compare fees →
Gypsum
Both in Eagle County8 shared permit typesBoth on the 2021 International Fire Code (IFC)~7 mi away
Compare fees →
Avon
Both in Eagle County8 shared permit typesBoth on the 2021 International Energy Conservation Code (IECC)~16 mi away
Compare fees →