EV Charger / EVSE Permit (State of Colorado Electrical Board) — Eagle, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://dpo.colorado.gov/EandP/Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit (State of Colorado Electrical Board) in Eagle, Colorado
Installation of an electric vehicle charging station in the Town of Eagle is electrical work and, exactly like this file's general electrical-permit entry, is permitted and inspected directly by the State of Colorado (Colorado DPO/State Electrical Board), NOT the Town of Eagle Building Division. Under Colorado Revised Statutes § 12-23-117, electrical inspection is a matter of statewide concern: the state sets a uniform fee schedule and no local government may impose any separate fee or charge related to electrical permits/inspections. The state's own electrical fee schedule (valuation-based/square-footage-based) has NO distinct 'EV charger,' 'electric vehicle,' or 'EVSE' line item; a dedicated Level 2 charger circuit is billed under the state's 'All other electrical fees' valuation-based tier — the same mechanism already documented on this file's electrical-permit entry.
Verified 2026-07-20 · Source
When you need this permit
- Permit must be purchased through the Colorado DPO Online Permitting System (dpo.colorado.gov/EandP/Permits), not the Town of Eagle — same requirement already documented on this file's electrical-permit entry
- Governed by the 2020 NEC as adopted statewide by the Colorado State Electrical Board
- Confirmed directly against the State of Colorado's own Electrical Permit Fees schedule (mechanism fixed by C.R.S. § 12-23-117): no distinct EV-charger/EVSE fee line exists; a dedicated charger circuit is billed on the 'All other electrical fees' valuation-based tier
- Contractor must hold a current Colorado Electrical Board (DORA) license; a homeowner may self-permit under the State's homeowner provisions
- The Town of Eagle collects no portion of this fee and has no role in EV-charger electrical permitting, same as its general electrical-permit entry
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Wiring and conduit installed before walls closed (if applicable); scheduled directly with the State-assigned electrical inspector, not the Town
- 2
Final
Charger circuit/unit installed, breaker sized correctly, energized; State inspector verifies devices and energization
See the full Eagle inspection guide — scheduling & re-inspection fees →
Tips
- Do not apply for an EV charger permit through the Town of Eagle — like all electrical work in Eagle, it is a State of Colorado DPO permit, not a Town permit.
- There is no distinct 'EV charger permit' anywhere in Colorado's statewide electrical fee schedule — a dedicated charger circuit is billed on the state's valuation-based 'All other electrical fees' tier.
- Under C.R.S. § 12-23-117, no local government may charge any separate additional electrical permit fee — the Town of Eagle's own Master Fee Schedule already confirms its Permit Issuance/Transfer fee explicitly excludes electrical permits.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Eagle
EV Charger / EVSE Permit (State of Colorado Electrical Board) in other cities
Compare ev charger / evse permit (state of colorado electrical board) fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Eagle project checklist
Describe your project once and get every permit, document, and fee it triggers in Eagle — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →