Installation of an electric vehicle charging station in the Town of Eagle is electrical work and, exactly like this file's general electrical-permit entry, is permitted and inspected directly by the State of Colorado (Colorado DPO/State Electrical Board), NOT the Town of Eagle Building Division. Under Colorado Revised Statutes § 12-23-117, electrical inspection is a matter of statewide concern: the state sets a uniform fee schedule and no local government may impose any separate fee or charge related to electrical permits/inspections. The state's own electrical fee schedule (valuation-based/square-footage-based) has NO distinct 'EV charger,' 'electric vehicle,' or 'EVSE' line item; a dedicated Level 2 charger circuit is billed under the state's 'All other electrical fees' valuation-based tier — the same mechanism already documented on this file's electrical-permit entry.

Verified 2026-07-20 · Source

When you need this permit

  • Permit must be purchased through the Colorado DPO Online Permitting System (dpo.colorado.gov/EandP/Permits), not the Town of Eagle — same requirement already documented on this file's electrical-permit entry
  • Governed by the 2020 NEC as adopted statewide by the Colorado State Electrical Board
  • Confirmed directly against the State of Colorado's own Electrical Permit Fees schedule (mechanism fixed by C.R.S. § 12-23-117): no distinct EV-charger/EVSE fee line exists; a dedicated charger circuit is billed on the 'All other electrical fees' valuation-based tier
  • Contractor must hold a current Colorado Electrical Board (DORA) license; a homeowner may self-permit under the State's homeowner provisions
  • The Town of Eagle collects no portion of this fee and has no role in EV-charger electrical permitting, same as its general electrical-permit entry

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

All other electrical fees — valuation not more than $2,000 (typical dedicated EV charger circuit)State of Colorado Electrical Permit Fees schedule (mechanism fixed by C.R.S. § 12-23-117) — no distinct EV-charger/EVSE line item exists; same statewide fee mechanism already documented on this file's electrical-permit entry, which notes the Town collects no portion of this fee
$115.00 (per the statewide schedule effective April 1, 2016; confirm current-year figure directly with DPO since the state revises this periodically)
All other electrical fees — valuation $2,001 and aboveState of Colorado Electrical Permit Fees schedule
$115 plus $5.75 per $1,000 or fraction thereof of total valuation, plus $115.00

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit (State of Colorado Electrical Board) permit actually take in Eagle?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring and conduit installed before walls closed (if applicable); scheduled directly with the State-assigned electrical inspector, not the Town

  2. 2

    Final

    Charger circuit/unit installed, breaker sized correctly, energized; State inspector verifies devices and energization

See the full Eagle inspection guide — scheduling & re-inspection fees →

Tips

  • Do not apply for an EV charger permit through the Town of Eagle — like all electrical work in Eagle, it is a State of Colorado DPO permit, not a Town permit.
  • There is no distinct 'EV charger permit' anywhere in Colorado's statewide electrical fee schedule — a dedicated charger circuit is billed on the state's valuation-based 'All other electrical fees' tier.
  • Under C.R.S. § 12-23-117, no local government may charge any separate additional electrical permit fee — the Town of Eagle's own Master Fee Schedule already confirms its Permit Issuance/Transfer fee explicitly excludes electrical permits.

Frequently asked questions

Eagle requires an ev charger / evse permit (state of colorado electrical board) for: Permit must be purchased through the Colorado DPO Online Permitting System (dpo.colorado.gov/EandP/Permits), not the Town of Eagle — same requirement already documented on this file's electrical-permit entry; Governed by the 2020 NEC as adopted statewide by the Colorado State Electrical Board; Confirmed directly against the State of Colorado's own Electrical Permit Fees schedule (mechanism fixed by C.R.S. § 12-23-117): no distinct EV-charger/EVSE fee line exists; a dedicated charger circuit is billed on the 'All other electrical fees' valuation-based tier; Contractor must hold a current Colorado Electrical Board (DORA) license; a homeowner may self-permit under the State's homeowner provisions; The Town of Eagle collects no portion of this fee and has no role in EV-charger electrical permitting, same as its general electrical-permit entry. If your project isn't listed, confirm with Town of Eagle Building Division (Community Development) at 970-328-9565 before starting work.

No. The State Electrical Board's fee schedule has no distinct EV-charger or EVSE line item. A dedicated charger circuit is billed on the state's valuation-based 'All other electrical fees' tier, the same mechanism used for any other electrical work statewide.

Eagle does not publish a plan-review timeline for this permit. Contact Town of Eagle Building Division (Community Development) at 970-328-9565 for current turnaround.

You'll need: Colorado DPO Electrical Permit Application. See the required-documents checklist on this page for details on each.

Eagle requires 2 inspection(s) for an ev charger / evse permit (state of colorado electrical board), in order: Rough-In, Final. Schedule each through Town of Eagle Building Division (Community Development) (970-328-9565).

Apply through Town of Eagle Building Division (Community Development) at 200 Broadway, PO Box 609, Eagle, CO 81631. Phone: 970-328-9565, email: permits@townofeagle.org. Office hours: General Building Division line (970) 328-9565; Inspection Hotline (970) 328-9626 (must call by 4:00 PM for next available inspection date). Due to limited staff capacity, the Town's own Building Department page states initial response times for phone calls and emails are approximately 3-5 business days. In-person appointments are recommended and should be scheduled by phone or email rather than walk-in. Chief Building Official: Dan Brown.. Official information: https://www.townofeagle.org/138/Building.

Eagle, Colorado has adopted: 2021 International Building Code (IBC), with local amendments (Town of Eagle 2021 IBC Amendments); 2021 International Residential Code (IRC), with local amendments (Town of Eagle 2021 IRC Amendments); 2021 International Mechanical Code (IMC); 2021 International Plumbing Code (IPC); 2021 International Fuel Gas Code (IFGC); 2021 International Existing Building Code (IEBC); 2021 International Swimming Pool and Spa Code (ISPSC); 2021 International Energy Conservation Code (IECC); 2021 International Fire Code (IFC); 2020 National Electrical Code (NEC); Colorado State Wildfire Resiliency Code — adopted by the Town, effective for building-code review starting July 1, 2026; Snow load design data: per the Town's 2021 IRC Amendments (Table R301.2(1)), minimum roof ground snow load is set at 65 lb/ft2, cross-referencing the Structural Engineers Association of Colorado's 'Snow Load Design Data for Colorado' as the underlying methodology. Local amendments apply — see the Eagle overview page for the full list.

Directly from the Colorado Division of Professions and Occupations (DPO) via its Online Permitting System at dpo.colorado.gov/EandP/Permits — the same authority that issues all electrical permits in Eagle. The Town of Eagle does not issue EV-charger or any other electrical permits.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.