Skip to main content
PermitBase

Sign Permit in Eagle, Colorado

Required for installation of permanent signage in the Town of Eagle. Unlike most other permit types in this file, a Sign Permit is a Planning Division application (not a Building Division permit) reviewed under Chapter 4.16 (Sign Code) of the Town's Land Use and Development Code, Ordinance No. 10, Series 2022, per the Town's own live Forms, Permits, Fees & Applications page (fetched and read directly 2026-08-13), which directs applicants to review the Town's sign regulations before completing the fillable Sign Permit Application. The 2026 Fee Schedule bills this under its own Land Use Application Fees table (Planning Fees section) rather than the Building Division's valuation-based Building Permit Fee schedule used elsewhere in this file.

Verified 2026-08-13 · Source

When you need this permit

  • Sign Permit Application (fillable form, hosted via Adobe Acrobat Sign) must be completed and submitted to Planning@townofeagle.org, per the Town's Forms, Permits, Fees & Applications page
  • Applicants are directed to review the Town's sign regulations (Land Use and Development Code Chapter 4.16, Ordinance No. 10, Series 2022) before completing the application
  • A distinct, lower-cost 'Sign Permit - Comprehensive sign program' fee tier exists on the 2026 Fee Schedule for multi-sign or development-wide sign programs, versus the standard Sign Permit fee for an individual sign
  • If the sign is illuminated, a separate electrical permit is required directly through the Colorado DPO Online Permitting System — the Town of Eagle issues no electrical permits of any kind (electrical permitting and inspection in Eagle is entirely state-administered, as documented throughout this file's electrical-permit and ev-charger-permit entries)
  • The full operative text of LUDC Chapter 4.16 (permit-exempt sign types, size/height limits, illumination standards) was not independently fetchable this session: library.municode.com/co/eagle is a JavaScript-rendered Angular application that returns only the SPA shell to both direct WebFetch and browser-header curl requests — confirmed by inspecting the returned HTML for Angular/ng-app markers. This is the same documented Municode limitation noted for Avon and other Colorado jurisdictions in this corpus; do not assume specific exemption thresholds without confirming directly with the Planning & Zoning Department (970-328-9655 / Planning@townofeagle.org)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit (individual sign)2026 Fee Schedule (amended 04/28/2026), Planning Fees / Land Use Application Fees section, NO CHANGE from 2025; verified directly against the rendered fee table (page 14 of the PDF) after the initial layout-mode text extraction produced misaligned rows on this table and was discarded in favor of a rendered-image read, per this corpus's PDF-table extraction protocol
$100.00
Sign Permit - Comprehensive sign program2026 Fee Schedule, Planning Fees section, NO CHANGE from 2025; for multi-sign or development-wide sign programs rather than a single individual sign
$150.00
State of Colorado Electrical Permit Fee (only if the sign is illuminated)Set and collected entirely by the Colorado DPO State Electrical Board under the statewide C.R.S. 12-23-117 fee schedule, not the Town of Eagle — same mechanism already documented on this file's electrical-permit entry. No distinct illuminated-sign fee line was independently re-extracted this session; the Town collects no fee at all for this component.
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Eagle?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection

    Installed sign verified against the approved Sign Permit for location, dimensions, and materials; illumination (if any) verified separately by the State's electrical inspector under the DPO electrical permit, not the Town

See the full Eagle inspection guide — scheduling & re-inspection fees →

Tips

  • A Sign Permit in Eagle is processed by the Planning & Zoning Department, not the Building Division and not through the Community Core portal used for building/mechanical/plumbing permits elsewhere in this file — completed applications go to Planning@townofeagle.org instead.
  • An illuminated sign needs a completely separate Colorado DPO electrical permit, exactly like every other electrical scope in the Town of Eagle — budget a second application and a second inspection track alongside the Sign Permit itself.
  • A single business sign is billed at the standard $100 Sign Permit fee; a multi-tenant or development-wide sign program instead falls under the $150 'Comprehensive sign program' fee tier — confirm which applies to your property before submitting.

Frequently asked questions

Eagle requires a sign permit for: Sign Permit Application (fillable form, hosted via Adobe Acrobat Sign) must be completed and submitted to Planning@townofeagle.org, per the Town's Forms, Permits, Fees & Applications page; Applicants are directed to review the Town's sign regulations (Land Use and Development Code Chapter 4.16, Ordinance No. 10, Series 2022) before completing the application; A distinct, lower-cost 'Sign Permit - Comprehensive sign program' fee tier exists on the 2026 Fee Schedule for multi-sign or development-wide sign programs, versus the standard Sign Permit fee for an individual sign; If the sign is illuminated, a separate electrical permit is required directly through the Colorado DPO Online Permitting System — the Town of Eagle issues no electrical permits of any kind (electrical permitting and inspection in Eagle is entirely state-administered, as documented throughout this file's electrical-permit and ev-charger-permit entries); The full operative text of LUDC Chapter 4.16 (permit-exempt sign types, size/height limits, illumination standards) was not independently fetchable this session: library.municode.com/co/eagle is a JavaScript-rendered Angular application that returns only the SPA shell to both direct WebFetch and browser-header curl requests — confirmed by inspecting the returned HTML for Angular/ng-app markers. This is the same documented Municode limitation noted for Avon and other Colorado jurisdictions in this corpus; do not assume specific exemption thresholds without confirming directly with the Planning & Zoning Department (970-328-9655 / Planning@townofeagle.org). If your project isn't listed, confirm with Town of Eagle Building Division (Community Development) at 970-328-9565 before starting work.

$100.00 for a standard individual sign, or $150.00 under the 'Comprehensive sign program' fee tier for multi-sign or development-wide programs, per the 2026 Fee Schedule (unchanged from 2025).

Eagle does not publish a plan-review timeline for this permit. Contact Town of Eagle Building Division (Community Development) at 970-328-9565 for current turnaround.

You'll need: Sign Permit Application. Depending on your project, Eagle may also ask for: Colorado DPO Electrical Permit Application. See the required-documents checklist on this page for details on each.

Eagle requires 1 inspection(s) for a sign permit, in order: Final Inspection. Schedule each through Town of Eagle Building Division (Community Development) (970-328-9565).

Apply through Town of Eagle Building Division (Community Development) at 200 Broadway, PO Box 609, Eagle, CO 81631. Phone: 970-328-9565, email: permits@townofeagle.org. Office hours: General Building Division line (970) 328-9565; Inspection Hotline (970) 328-9626 (must call by 4:00 PM for next available inspection date). Due to limited staff capacity, the Town's own Building Department page states initial response times for phone calls and emails are approximately 3-5 business days. In-person appointments are recommended and should be scheduled by phone or email rather than walk-in. Chief Building Official: Dan Brown.. Official information: https://www.townofeagle.org/138/Building.

The Town's Planning & Zoning Department, under Chapter 4.16 (Sign Code) of the Land Use and Development Code (Ordinance No. 10, Series 2022) — this is a Planning Division application, not a Building Division permit, and completed applications are submitted to Planning@townofeagle.org rather than through the Community Core portal used for building, mechanical, and plumbing permits.

Yes. Because the Town of Eagle issues no electrical permits of any kind (electrical permitting in Eagle is entirely administered by the Colorado DPO State Electrical Board), an illuminated sign's electrical component requires its own separate DPO electrical permit in addition to the Town's Sign Permit.