Sign Permit in Arvada, Colorado
RESEARCHED 2026-08-05: the City of Arvada requires a sign permit for any sign visible from a street or adjacent property, or larger than 32 square feet, per the live Signs page (arvadaco.gov/437, fetched raw 2026-08-05). Each sign requires a separate permit (wall signs more than three feet apart count as separate signs). Applications go through eTRAKiT (arvadapermits.org) the same as other Arvada permits, and are handled by the City's Planning & Zoning division rather than Building Safety directly. Fee amounts confirmed via the live Building Fee Schedule page (arvadaco.gov/1263, Table 18-3, raw HTML re-fetched and grepped 2026-08-05 to independently verify the figures returned by an earlier AI summarization pass).
Verified 2026-08-05 · Source
When you need this permit
- A sign permit is required for any sign visible from a street or adjacent property, or any sign larger than 32 square feet in area -- some signs are exempt from the permit requirement but must still comply with sign regulations (arvadaco.gov/437)
- Each sign needs a separate sign permit; wall signs separated by a distance of more than three feet are considered separate signs
- Signs are regulated under one of four Sign Districts corresponding to zoning: Olde Town (OT), Mixed-Use/Commercial/Industrial (MX/CI), Multi-family Residential (RM), and Single-Family Residential (RS) -- regulations govern structure, materials, lighting, number, height, area/dimensions, duration, location, and maintenance, and are stated to be content-neutral (do not restrict message content)
- Signs proposed in Olde Town or Reno Park additionally require a Certificate of Compliance with Design Guidelines, applied for through the Planning Department, before/with the sign permit application
- If the sign involves only an electrical disconnect/reconnect, no electrical permit is required; if it involves new wiring or a service change, a separate electrical permit is required and a Sub-Contractor Application must be completed
- Applications are submitted online via the Arvada Permits Site (arvadapermits.org / eTRAKiT) -- consistent with the rest of Arvada's permitting, which is no longer processed over the counter
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Arvada inspection guide — scheduling & re-inspection fees →
Tips
- No sign-specific inspection is described on the live Signs page as of 2026-08-05 -- disclosed as a gap rather than assumed; if the sign is wired, it would presumably be covered by the standard electrical permit inspection process, but this is not explicitly stated for signage.
- Confirm which of Arvada's four Sign Districts (Olde Town, Mixed-Use/Commercial/Industrial, Multi-family Residential, Single-Family Residential) applies to your property before designing a sign, since permitted size/height/illumination varies by district and is not detailed on the summary page.
- A $5 discrepancy pattern (seen elsewhere in this file, e.g. the hot tub fee on the deck-covered-patio-permit entry) was NOT found for sign fees -- the $30/$55/$55 figures matched exactly between the live Signs page context and the Table 18-3 fee schedule on independent re-fetch 2026-08-05.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-05.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Arvada building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Arvada
Sign Permit in other cities
Compare sign permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Arvada project checklist
Describe your project once and get every permit, document, and fee it triggers in Arvada — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →