RESEARCHED 2026-08-05: the City of Arvada requires a sign permit for any sign visible from a street or adjacent property, or larger than 32 square feet, per the live Signs page (arvadaco.gov/437, fetched raw 2026-08-05). Each sign requires a separate permit (wall signs more than three feet apart count as separate signs). Applications go through eTRAKiT (arvadapermits.org) the same as other Arvada permits, and are handled by the City's Planning & Zoning division rather than Building Safety directly. Fee amounts confirmed via the live Building Fee Schedule page (arvadaco.gov/1263, Table 18-3, raw HTML re-fetched and grepped 2026-08-05 to independently verify the figures returned by an earlier AI summarization pass).

Verified 2026-08-05 · Source

When you need this permit

  • A sign permit is required for any sign visible from a street or adjacent property, or any sign larger than 32 square feet in area -- some signs are exempt from the permit requirement but must still comply with sign regulations (arvadaco.gov/437)
  • Each sign needs a separate sign permit; wall signs separated by a distance of more than three feet are considered separate signs
  • Signs are regulated under one of four Sign Districts corresponding to zoning: Olde Town (OT), Mixed-Use/Commercial/Industrial (MX/CI), Multi-family Residential (RM), and Single-Family Residential (RS) -- regulations govern structure, materials, lighting, number, height, area/dimensions, duration, location, and maintenance, and are stated to be content-neutral (do not restrict message content)
  • Signs proposed in Olde Town or Reno Park additionally require a Certificate of Compliance with Design Guidelines, applied for through the Planning Department, before/with the sign permit application
  • If the sign involves only an electrical disconnect/reconnect, no electrical permit is required; if it involves new wiring or a service change, a separate electrical permit is required and a Sub-Contractor Application must be completed
  • Applications are submitted online via the Arvada Permits Site (arvadapermits.org / eTRAKiT) -- consistent with the rest of Arvada's permitting, which is no longer processed over the counter

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign - AttachedCity of Arvada Building Fee Schedule, Table 18-3 -- confirmed via raw HTML fetch of arvadaco.gov/1263 on 2026-08-05 ('Sign – Attached... $30.00')
$30.00
Sign - DetachedTable 18-3, confirmed via raw HTML fetch 2026-08-05 ('Sign – Detached... $55.00')
$55.00
Sign - with electrical (excludes disconnect/reconnect)Table 18-3, confirmed via raw HTML fetch 2026-08-05; a simple disconnect/reconnect does not require this fee/an electrical permit per the Signs page
$55.00
Electrical Permit (if new wiring/service change)Not published as a sign-specific line item; would follow the general electrical permit fee schedule documented in this file's electrical-permit entry. Disclosed as a gap rather than an assumed figure.
Not published — contact the department

Review timeline

Plan reviewArvada’s published plan-review target
7–7 business days

How long did your Sign Permit permit actually take in Arvada?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Arvada inspection guide — scheduling & re-inspection fees →

    Tips

    • No sign-specific inspection is described on the live Signs page as of 2026-08-05 -- disclosed as a gap rather than assumed; if the sign is wired, it would presumably be covered by the standard electrical permit inspection process, but this is not explicitly stated for signage.
    • Confirm which of Arvada's four Sign Districts (Olde Town, Mixed-Use/Commercial/Industrial, Multi-family Residential, Single-Family Residential) applies to your property before designing a sign, since permitted size/height/illumination varies by district and is not detailed on the summary page.
    • A $5 discrepancy pattern (seen elsewhere in this file, e.g. the hot tub fee on the deck-covered-patio-permit entry) was NOT found for sign fees -- the $30/$55/$55 figures matched exactly between the live Signs page context and the Table 18-3 fee schedule on independent re-fetch 2026-08-05.

    Frequently asked questions

    Arvada requires a sign permit for: A sign permit is required for any sign visible from a street or adjacent property, or any sign larger than 32 square feet in area -- some signs are exempt from the permit requirement but must still comply with sign regulations (arvadaco.gov/437); Each sign needs a separate sign permit; wall signs separated by a distance of more than three feet are considered separate signs; Signs are regulated under one of four Sign Districts corresponding to zoning: Olde Town (OT), Mixed-Use/Commercial/Industrial (MX/CI), Multi-family Residential (RM), and Single-Family Residential (RS) -- regulations govern structure, materials, lighting, number, height, area/dimensions, duration, location, and maintenance, and are stated to be content-neutral (do not restrict message content); Signs proposed in Olde Town or Reno Park additionally require a Certificate of Compliance with Design Guidelines, applied for through the Planning Department, before/with the sign permit application; If the sign involves only an electrical disconnect/reconnect, no electrical permit is required; if it involves new wiring or a service change, a separate electrical permit is required and a Sub-Contractor Application must be completed; Applications are submitted online via the Arvada Permits Site (arvadapermits.org / eTRAKiT) -- consistent with the rest of Arvada's permitting, which is no longer processed over the counter. If your project isn't listed, confirm with City of Arvada — Building Safety Division at 720-898-7620 before starting work.

    Per the City's Building Fee Schedule (Table 18-3, confirmed via raw fetch 2026-08-05): $30.00 for an attached sign, $55.00 for a detached sign, and $55.00 for a sign with electrical (not counting a simple disconnect/reconnect, which needs no electrical permit).

    Arvada's published plan-review target for a sign permit is 7–7 business days.

    You'll need: Sign Permit Application (eTRAKiT); Sign Elevation and Detail Plan; Plot Plan; Signed Letter of Permission from Property Owner. Depending on your project, Arvada may also ask for: Certificate of Compliance with Design Guidelines; Sub-Contractor Application. See the required-documents checklist on this page for details on each.

    Apply through City of Arvada — Building Safety Division at 8101 Ralston Road, Arvada, CO 80002. Phone: 720-898-7620, email: buildingpermits@arvada.org. Office hours: Mon–Fri, 8 a.m.–5 p.m.; permits are applied for and paid online via eTRAKiT at arvadapermits.org — permits are no longer processed over the counter. Official information: https://www.arvadaco.gov/332/Building-Permits.

    Arvada, Colorado has adopted: 2024 International Building Code (IBC) — CONFIRMED LIVE 2026-07-17: the City's 'Adopted building codes and design criteria' page (arvadaco.gov/165) now lists the 2024 IBC under 'Current adopted building codes (adopted March 24, 2026)', with the 2018 IBC moved to 'Previous adopted building codes (in effect October 2020-March 2026)'; the City's '2026 Building Code updates' page (arvadaco.gov/1388) confirms in past tense that 'The changes went into effect on July 1, 2026.' Permits submitted before July 1, 2026 could still use the 2018 IBC. CAVEAT: as of 2026-07-17 some Arvada operational permit-type pages had NOT been updated to reflect this switch — see per-permitType notes for mechanical/plumbing and re-roofing, which still cite 2018-cycle codes as current; 2024 International Residential Code (IRC) — same confirmed-live status as the IBC line above (arvadaco.gov/165, arvadaco.gov/1388, both verified 2026-07-17); includes the reorganized Chapter 3 and new ADU/tiny-house/3D-printed-home appendices per arvadaco.gov/1461 (Significant Changes list); 2024 International Fuel Gas Code (IFGC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; 2024 International Mechanical Code (IMC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; HOWEVER the live Residential Mechanical & Plumbing operational page (arvadaco.gov/434, verified 2026-07-17) still states 'Requirements follow the 2018 IRC and 2018 IECC, adopted by the City of Arvada... we have an upcoming code adoption' — a direct, unresolved contradiction between two of Arvada's own live pages; confirm current status directly with Building Safety Division for mechanical/plumbing submittals; 2024 International Plumbing Code (IPC) — same contradiction as the IMC line above: arvadaco.gov/165 lists 2024 IPC as current, but the live arvadaco.gov/434 operational page (verified 2026-07-17) still frames the 2024 IPC as an 'upcoming' change and cites 2018 IPC as governing; 2024 International Property Maintenance Code (IPMC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17, replacing the 2009 IPMC (deleting 45 prior municipal amendments per arvadaco.gov/1461); Colorado Model Low Energy Carbon Code, based on the 2024 International Energy Conservation Code (IECC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17, replacing the 2018 IECC; includes EV-ready/electric-ready/solar-ready mandates per arvadaco.gov/1388 and arvadaco.gov/1446; 2024 International Fire Code (IFC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; 2024 International Existing Building Code (IEBC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; 2023 National Electrical Code (NEC) / NFPA 70 — CONFIRMED still the governing electrical code as of 2026-07-17 per the City's own explicit statement on arvadaco.gov/1446 ('For Builders: Detailed changes coming in 2026'): 'Please note that the 2023 National Electrical Code will remain the electrical code for the City of Arvada, however the City does expect to begin implementing the 2026 NEC later on in 2026, when the State of Colorado begins implementation.' NOTE: arvadaco.gov/165's 'Current adopted building codes' list also includes an entry for '2026 National Electrical Code' — this appears to be an inconsistency/premature listing on that summary page, since the more specific, explicit 1446 page confirms 2023 NEC remains in effect pending State of Colorado action; treating 2023 NEC as the operative code per the more explicit source; 2024 International Swimming Pool and Spa Code (ISPSC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; Arvada Wildfire Resiliency Code (based on the Colorado Wildfire Resiliency Code) — CONFIRMED LIVE 2026-07-17: listed under 'Current adopted building codes' on arvadaco.gov/165, and arvadaco.gov/1388 states in past tense 'The City has adopted the Arvada Wildfire Resiliency Code, our first wildfire codes.' First Arvada-specific wildfire code; requires structural hardening and defensible space for new buildings, additions, accessory structures over 120 sq ft, and re-roofing/re-siding projects that replace more than 25% of the roof covering or exterior siding, within identified wildfire risk zones (map based on Jefferson County's wildfire map per arvadaco.gov/1461). CAVEAT: the live Re-Roofing operational page (arvadaco.gov/417, verified 2026-07-17) does not reference this code and still states 'Ice Barrier (Ice and Water Shield) not required' — directly contradicting arvadaco.gov/165's design-criteria section, which states 'Ice and Water Shield is required in Arvada... this is a change per our new adopted building codes.' This specific point is an unresolved live contradiction on Arvada's own website as of 2026-07-17. Local amendments apply — see the Arvada overview page for the full list.

    No. A sign permit is required only if the sign is visible from a street or adjacent property, or if it is larger than 32 square feet. Some smaller/non-visible signs are exempt from the permit requirement but must still comply with the City's sign regulations (arvadaco.gov/437, confirmed live 2026-08-05).

    Sources & verification

    Verified against official sources. Last reviewed 2026-08-05.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Arvada building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.