Fire Sprinkler and Fire Alarm System Permit — Arvada, Colorado · Requirements sheet
Verified 2026-08-05 · Source: https://www.arvadafireco.gov/218/Development-and-Construction
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Fire Sprinkler and Fire Alarm System Permit in Arvada, Colorado
Fire sprinkler and fire alarm system permits within the City of Arvada are issued and plan-reviewed by the Arvada Fire Protection District (AFPD, arvadafireco.gov) -- an independent special fire district, NOT a division of the City of Arvada's own Building Safety Division -- confirmed via AFPD's live site, which states it serves the City of Arvada, the City of Wheat Ridge, and unincorporated Jefferson County, each under the same 2024 International Fire Code with jurisdiction-specific amendments. This is a genuinely separate permitting track from the City's eTRAKiT/arvadapermits.org system: AFPD plans are submitted through the 'Mobile Eyes Contractor Permit Portal,' invoiced and paid separately (check or credit card to AFPD directly), and reviewed by AFPD's own Fire Marshal's Office. A full, itemized AFPD fee schedule PDF ('Fire Protection Systems' fee schedule) was fetched directly and is reproduced below. NOTE: AFPD's own website contains an unresolved internal contradiction on review timeline -- see reviewTimelineNote.
Verified 2026-08-05 · Source
When you need this permit
- Fire sprinkler and fire alarm system permits in Arvada are issued by the Arvada Fire Protection District (AFPD), a special district independent of the City of Arvada's Building Safety Division -- confirmed via AFPD's live Fire Code Resources and Development and Construction pages (arvadafireco.gov), both fetched raw 2026-08-05
- AFPD has adopted the 2024 International Fire Code with local amendments for the City of Arvada specifically (a separate amendment set applies to Wheat Ridge and unincorporated Jefferson County, AFPD's other two service areas) -- confirmed via arvadafireco.gov/216/Fire-Code-Resources, raw-fetched 2026-08-05
- Plans must be submitted online through the Mobile Eyes Contractor Permit Portal, not through the City's eTRAKiT system used for building permits -- per arvadafireco.gov/218/Development-and-Construction
- An invoice is issued once the application is accepted; the plan review does not begin, and comments/approved drawings/permit are not released, until the invoice is paid (by credit card via Tyler Payments, which adds a $6.95-or-3.95%-of-invoice processing fee, whichever is greater, or by check mailed/delivered to AFPD Headquarters at 7903 Allison Way, Arvada, CO 80005)
- For fire alarm work affecting fewer than 10 initiating/notification devices, or sprinkler work affecting fewer than 20 sprinklers (and not in a hydraulically remote design area), a Scope of Work letter (stamped by a registered fire protection engineer or NICET Level III+) can be submitted in place of full plans
- Underground fire-line piping requires a Contractor's Materials and Test Certificate for Underground Piping, installation per approved plans, and a hydrostatic test including the FDC, before it can be covered/inspected
- A representative of the requesting company must be on-site for all AFPD inspections, ready at least 30 minutes before and able to remain 60 minutes after the scheduled time; inspections not cancelled 24+ hours in advance, or where the representative is absent or work is incomplete, incur a re-inspection fee
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Arvada Fire Protection District 'Fire Protection Systems' fee schedule PDF (arvadafireco.gov/DocumentCenter/View/949), fetched and read directly 2026-08-05. Show full citationHide
Arvada Fire Protection District 'Fire Protection Systems' fee schedule PDF (arvadafireco.gov/DocumentCenter/View/949), fetched and read directly 2026-08-05. Full tier table: 0-4,999 sq ft $1,205/$0.00 per sq ft; 5,000-24,999 $1,205/$1.20; 25,000-49,999 $1,445/$1.46; 50,000-99,999 $1,808/$2.06; 100,000-249,999 $2,835/$1.52; 250,000-499,999 $5,100/$1.02; 500,000+ $7,650/$1.53Review timeline
Inspection process
- 1
Scheduled AFPD field inspection
Requested through the Mobile Eyes Contractor Permit Portal; AFPD anticipates fulfilling the requested date/time within 24-48 hours of the request. A representative of the requesting company must be on-site, ready 30 minutes before and able to remain 60 minutes after the scheduled time.
- 2
Underground piping inspection (if applicable)
Requires the Contractor's Materials and Test Certificate for Underground Piping, piping installed per approved plans, and a hydrostatic test including the FDC
See the full Arvada inspection guide — scheduling & re-inspection fees →
Tips
- This is a genuinely separate permitting authority from the rest of the Arvada entries: Arvada Fire Protection District (AFPD) is an independent special district serving the City of Arvada, the City of Wheat Ridge, and unincorporated Jefferson County -- not a City of Arvada department. Do not direct applicants to arvadapermits.org/eTRAKiT for fire sprinkler/alarm permits; AFPD uses its own Mobile Eyes Contractor Permit Portal and its own invoicing (payable to 'Arvada Fire Protection District').
- AFPD's fee schedule is genuinely itemized and tiered by square footage and device count, so you can price fire-system work up front rather than waiting for a quote. Figures here come from the 'Fire Protection Systems' fee schedule PDF itself rather than a secondary summary.
- AFPD's own website has an unresolved 2-week-vs-3-week contradiction on plan review turnaround between two live pages (arvadafireco.gov/1033 PDF vs. arvadafireco.gov/218 HTML page) as of 2026-08-05 -- flagged rather than silently resolved one way.
- No Arvada Fire Protection District page or PDF publishes a permit fee for picking up a paper permit packet at AFPD Headquarters, and no such fee is recorded in the fees above. Confirm any AFPD charge with the district directly before budgeting for it.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-05.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Arvada building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Arvada's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Arvada yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Arvada lands. Privacy.
Other permits in Arvada
Fire Sprinkler and Fire Alarm System Permit in other cities
Compare fire sprinkler and fire alarm system permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Arvada project checklist
Describe your project once and get every permit, document, and fee it triggers in Arvada — in one checklist. Free, for any city and any number of projects.
Get started →