Required for installation of rooftop or ground-mounted solar photovoltaic systems on residential and commercial structures in Arvada. Reviewed against the currently adopted 2023 NEC, plus Arvada's wind (136/150 Vult), snow (30 psf), and Exposure C design criteria.

Verified 2026-07-17 · Source

When you need this permit

  • Engineer's report required on the existing roof structure's dead-load capacity to support the added PV system weight, including site-specific wind speed and roof snow load
  • Engineer-stamped wiring diagram required, following the adopted National Electrical Code, showing conductor sizing, overcurrent device ratings, panel busbar ratings, and module series/parallel configuration
  • Equipment cut sheets required for modules, inverters, disconnects, and any batteries, including UL listings and rapid-shutdown compliance
  • Subcontractor approval form required if the electrical contractor is not associated with the general contractor
  • Roof-mounted systems must use permanent standoffs mounted to structural members and properly flashed to accommodate future re-roofing

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Solar Permit Fee — ResidentialCity of Arvada Solar permit page (arvadaco.gov/522), current published flat fee, reconfirmed live 2026-07-17 ('$50 Residential'). NOTE a discrepancy with the Building Fee Schedule: Table 18-5 of arvadaco.gov/1263 lists 'Solar Photovoltaic Panels' at $55.00 flat rate, not $50 — the same two-sources-disagree pattern already documented for Hot Tubs & Above-Ground Pools elsewhere in this file. The dedicated Solar page's $50 figure is used here as the more permit-type-specific citation; confirm via the Fee Calculator before budgeting
$50.00
Solar Permit Fee — CommercialCity of Arvada Solar permit page
Table 18-1 valuation-based fee, not to exceed $1,000.00
Plan Review FeeCity of Arvada Solar permit page
$36.00
Use TaxCity of Arvada Solar permit page; Arvada Municipal Code § 98-84
Assessed on the full system valuation prior to any rebates

Review timeline

Plan reviewArvada’s published plan-review target
0–7 business days

How long did your Solar PV Permit permit actually take in Arvada?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    New construction projects only

  2. 2

    Rough Framing

    New construction projects only

  3. 3

    Final Building

    Racking attachment and roof penetration sealing verified

  4. 4

    Final Electrical

    All electrical connections and interconnection verified

See the full Arvada inspection guide — scheduling & re-inspection fees →

Tips

  • Arvada's flat $50 residential solar permit fee (plus a $36 plan review fee and use tax) is inexpensive relative to the valuation-based schedule used for most other permit types — reconfirmed live 2026-07-17, though note the Building Fee Schedule's Table 18-5 separately lists 'Solar Photovoltaic Panels' at $55.00, a $5 discrepancy with the dedicated Solar page; use the Fee Calculator to confirm before budgeting.
  • A technical plan review is completed within 7 days of a complete application submission, per the City's published solar permit page (confirmed live 2026-07-17: 'A technical plan review is completed within seven days from when a completed application has been submitted').
  • Engineer's structural reports for solar must explicitly state the wind speed (136 Vult east of Hwy 93 / 150 Vult west of Hwy 93) and roof snow load (30 psf) used in the dead-load analysis — these are Arvada's adopted design criteria, not generic defaults.
  • Use tax is calculated on the full system valuation BEFORE any utility or tax rebates are applied.

Frequently asked questions

Arvada requires a solar pv permit for: Engineer's report required on the existing roof structure's dead-load capacity to support the added PV system weight, including site-specific wind speed and roof snow load; Engineer-stamped wiring diagram required, following the adopted National Electrical Code, showing conductor sizing, overcurrent device ratings, panel busbar ratings, and module series/parallel configuration; Equipment cut sheets required for modules, inverters, disconnects, and any batteries, including UL listings and rapid-shutdown compliance; Subcontractor approval form required if the electrical contractor is not associated with the general contractor; Roof-mounted systems must use permanent standoffs mounted to structural members and properly flashed to accommodate future re-roofing. If your project isn't listed, confirm with City of Arvada — Building Safety Division at 720-898-7620 before starting work.

A residential solar PV permit in Arvada costs a flat $50.00, plus a $36.00 plan review fee and applicable use tax. Commercial solar permits use the Table 18-1 valuation-based fee schedule, capped at a maximum of $1,000.00.

Arvada's published plan-review target for a solar pv permit is 0–7 business days.

You'll need: Solar Permit Application (eTRAKiT); Plan Set / Plot Plan with 3-Line Wiring Diagram; Engineer's Structural Report. See the required-documents checklist on this page for details on each.

Arvada requires 4 inspection(s) for a solar pv permit, in order: Rough Electrical, Rough Framing, Final Building, Final Electrical. Schedule each through City of Arvada — Building Safety Division (720-898-7620).

Apply through City of Arvada — Building Safety Division at 8101 Ralston Road, Arvada, CO 80002. Phone: 720-898-7620, email: buildingpermits@arvada.org. Office hours: Mon–Fri, 8 a.m.–5 p.m.; permits are applied for and paid online via eTRAKiT at arvadapermits.org — permits are no longer processed over the counter. Official information: https://www.arvadaco.gov/332/Building-Permits.

Arvada, Colorado has adopted: 2024 International Building Code (IBC) — CONFIRMED LIVE 2026-07-17: the City's 'Adopted building codes and design criteria' page (arvadaco.gov/165) now lists the 2024 IBC under 'Current adopted building codes (adopted March 24, 2026)', with the 2018 IBC moved to 'Previous adopted building codes (in effect October 2020-March 2026)'; the City's '2026 Building Code updates' page (arvadaco.gov/1388) confirms in past tense that 'The changes went into effect on July 1, 2026.' Permits submitted before July 1, 2026 could still use the 2018 IBC. CAVEAT: as of 2026-07-17 some Arvada operational permit-type pages had NOT been updated to reflect this switch — see per-permitType notes for mechanical/plumbing and re-roofing, which still cite 2018-cycle codes as current; 2024 International Residential Code (IRC) — same confirmed-live status as the IBC line above (arvadaco.gov/165, arvadaco.gov/1388, both verified 2026-07-17); includes the reorganized Chapter 3 and new ADU/tiny-house/3D-printed-home appendices per arvadaco.gov/1461 (Significant Changes list); 2024 International Fuel Gas Code (IFGC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; 2024 International Mechanical Code (IMC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; HOWEVER the live Residential Mechanical & Plumbing operational page (arvadaco.gov/434, verified 2026-07-17) still states 'Requirements follow the 2018 IRC and 2018 IECC, adopted by the City of Arvada... we have an upcoming code adoption' — a direct, unresolved contradiction between two of Arvada's own live pages; confirm current status directly with Building Safety Division for mechanical/plumbing submittals; 2024 International Plumbing Code (IPC) — same contradiction as the IMC line above: arvadaco.gov/165 lists 2024 IPC as current, but the live arvadaco.gov/434 operational page (verified 2026-07-17) still frames the 2024 IPC as an 'upcoming' change and cites 2018 IPC as governing; 2024 International Property Maintenance Code (IPMC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17, replacing the 2009 IPMC (deleting 45 prior municipal amendments per arvadaco.gov/1461); Colorado Model Low Energy Carbon Code, based on the 2024 International Energy Conservation Code (IECC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17, replacing the 2018 IECC; includes EV-ready/electric-ready/solar-ready mandates per arvadaco.gov/1388 and arvadaco.gov/1446; 2024 International Fire Code (IFC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; 2024 International Existing Building Code (IEBC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; 2023 National Electrical Code (NEC) / NFPA 70 — CONFIRMED still the governing electrical code as of 2026-07-17 per the City's own explicit statement on arvadaco.gov/1446 ('For Builders: Detailed changes coming in 2026'): 'Please note that the 2023 National Electrical Code will remain the electrical code for the City of Arvada, however the City does expect to begin implementing the 2026 NEC later on in 2026, when the State of Colorado begins implementation.' NOTE: arvadaco.gov/165's 'Current adopted building codes' list also includes an entry for '2026 National Electrical Code' — this appears to be an inconsistency/premature listing on that summary page, since the more specific, explicit 1446 page confirms 2023 NEC remains in effect pending State of Colorado action; treating 2023 NEC as the operative code per the more explicit source; 2024 International Swimming Pool and Spa Code (ISPSC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; Arvada Wildfire Resiliency Code (based on the Colorado Wildfire Resiliency Code) — CONFIRMED LIVE 2026-07-17: listed under 'Current adopted building codes' on arvadaco.gov/165, and arvadaco.gov/1388 states in past tense 'The City has adopted the Arvada Wildfire Resiliency Code, our first wildfire codes.' First Arvada-specific wildfire code; requires structural hardening and defensible space for new buildings, additions, accessory structures over 120 sq ft, and re-roofing/re-siding projects that replace more than 25% of the roof covering or exterior siding, within identified wildfire risk zones (map based on Jefferson County's wildfire map per arvadaco.gov/1461). CAVEAT: the live Re-Roofing operational page (arvadaco.gov/417, verified 2026-07-17) does not reference this code and still states 'Ice Barrier (Ice and Water Shield) not required' — directly contradicting arvadaco.gov/165's design-criteria section, which states 'Ice and Water Shield is required in Arvada... this is a change per our new adopted building codes.' This specific point is an unresolved live contradiction on Arvada's own website as of 2026-07-17. Local amendments apply — see the Arvada overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-17.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Arvada building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.