Residential Building Permit (New Construction) in Eagle, Colorado

Required for new construction of single-family homes, duplexes, and townhomes in the Town of Eagle. Reviewed under the 2021 IRC/IBC as locally amended, including the Town's Table R301.2(1) Climatic and Geographic Design Criteria (65 lb/ft2 ground snow load, 115 mph wind design speed, 48-inch frost depth, ice barrier underlayment required). Issued by the Town of Eagle Building Division; electrical work on the same project is permitted separately and directly through the Colorado DPO, not the Town.

Verified 2026-07-06 · Source

When you need this permit

  • Plans must comply with the 2021 IRC/IBC as locally amended, and must meet the Town's Table R301.2(1) Climatic and Geographic Design Criteria: 65 lb/ft2 ground snow load, 115 mph wind design speed (Seismic Design Category B), 48-inch minimum frost depth, ice barrier underlayment required
  • Foundation frost walls for all conditioned spaces must extend a minimum of 48 inches from the bottom of the footing to backfill grade, unless otherwise designed by a structural engineer (2021 IRC Amendments Section R403.1.4.1)
  • Project Information Form (PIF) — In Town Single Family variant — required as part of application intake
  • Residential Energy Code Worksheet required to demonstrate 2021 IECC compliance
  • All contractors (general, plumbing, mechanical) must hold a current Town of Eagle contractor registration under Chapter 13.24 of the Eagle Municipal Code Contractor
  • Electrical work is NOT permitted by the Town — a separate Colorado State Electrical Permit must be obtained directly through the DPO Online Permitting System
  • Applications and plan sets submitted via the Town's Community Core online portal; paper plans are not accepted

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation $1.00 to $500.002026 Fee Schedule (adopted 11/12/2025), NO CHANGE from 2025
$39.40
Building Permit Fee — valuation $500.01 to $2,000.00
$39.40 for the first $500 plus $3.60 for each additional $100 or fraction thereof, to and including $2,000
Building Permit Fee — valuation $2,000.01 to $25,000.00
$93.40 for the first $2,000 plus $16.30 for each additional $1,000 or fraction thereof, to and including $25,000
Building Permit Fee — valuation $25,000.01 to $50,000.00
$468.30 for the first $25,000 plus $11.75 for each additional $1,000 or fraction thereof, to and including $50,000
Building Permit Fee — valuation $50,000.01 to $100,000.00
$762.05 for the first $50,000 plus $8.15 for each additional $1,000 or fraction thereof, to and including $100,000
Building Permit Fee — valuation $100,000.01 to $500,000.00
$1,169.55 for the first $100,000 plus $6.55 for each additional $1,000 or fraction thereof, to and including $500,000
Building Permit Fee — valuation $500,000.01 to $1,000,000.00
$3,789.55 for the first $500,000 plus $5.55 for each additional $1,000 or fraction thereof, to and including $1,000,000
Building Permit Fee — valuation $1,000,000.01 and up
$6,564.55 for the first $1,000,000 plus $4.30 for each additional $1,000 or fraction thereof
Plan Check Fee
65% of the Building Permit Fee
Construction Use Tax
2% of 200% of Total Valuation (functionally a 4% use tax on the assumed 50%-materials portion of valuation)
Permit Issuance/Transfer FeeDoes not apply to Electrical Permits (those are issued by the State)
$25.00
Certificate of Occupancy Fee
$100.00

Review timeline

Plan review
Not published — contact the department

How long did your Residential Building Permit (New Construction) permit actually take in Eagle?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Before concrete pour, per 48-inch minimum frost depth

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Plumbing / Mechanical

    Trade rough-ins before concealment (rough electrical is scheduled separately with the Colorado DPO, not the Town)

  4. 4

    Final Inspection

    All work complete per approved plans and applicable codes; Certificate of Occupancy issued on passing

See the full Eagle inspection guide — scheduling & re-inspection fees →

Tips

  • Electrical work on your project is NOT permitted by the Town of Eagle — you must obtain a separate Colorado State Electrical Permit directly through the DPO Online Permitting System (dpo.colorado.gov/EandP/Permits) and schedule electrical inspections with the state, not the Town. Plan for two entirely separate permit tracks.
  • The Town's own Building Department page warns that initial response times for phone calls and emails run approximately 3-5 business days due to limited staff capacity — budget lead time accordingly before your first submittal.
  • Foundation frost walls must reach a full 48 inches per the Town's amended Section R403.1.4.1 — confirm your structural engineer is designing to this locally amended depth requirement, not just the base 2021 IRC.
  • All plan submittals and inspection requests for registered contractors go through the Community Core online portal; paper plans are not accepted. Contractor

Frequently asked questions

Eagle requires a residential building permit (new construction) for: Plans must comply with the 2021 IRC/IBC as locally amended, and must meet the Town's Table R301.2(1) Climatic and Geographic Design Criteria: 65 lb/ft2 ground snow load, 115 mph wind design speed (Seismic Design Category B), 48-inch minimum frost depth, ice barrier underlayment required; Foundation frost walls for all conditioned spaces must extend a minimum of 48 inches from the bottom of the footing to backfill grade, unless otherwise designed by a structural engineer (2021 IRC Amendments Section R403.1.4.1); Project Information Form (PIF) — In Town Single Family variant — required as part of application intake; Residential Energy Code Worksheet required to demonstrate 2021 IECC compliance; All contractors (general, plumbing, mechanical) must hold a current Town of Eagle contractor registration under Chapter 13.24 of the Eagle Municipal Code; Electrical work is NOT permitted by the Town — a separate Colorado State Electrical Permit must be obtained directly through the DPO Online Permitting System; Applications and plan sets submitted via the Town's Community Core online portal; paper plans are not accepted. If your project isn't listed, confirm with Town of Eagle Building Division (Community Development) at 970-328-9565 before starting work.

In Eagle, the published Building Permit Fee — valuation $1.00 to $500.00 is: $39.40. Additional published fees: Building Permit Fee — valuation $500.01 to $2,000.00 — $39.40 for the first $500 plus $3.60 for each additional $100 or fraction thereof, to and including $2,000; Building Permit Fee — valuation $2,000.01 to $25,000.00 — $93.40 for the first $2,000 plus $16.30 for each additional $1,000 or fraction thereof, to and including $25,000; Building Permit Fee — valuation $25,000.01 to $50,000.00 — $468.30 for the first $25,000 plus $11.75 for each additional $1,000 or fraction thereof, to and including $50,000; Building Permit Fee — valuation $50,000.01 to $100,000.00 — $762.05 for the first $50,000 plus $8.15 for each additional $1,000 or fraction thereof, to and including $100,000; Building Permit Fee — valuation $100,000.01 to $500,000.00 — $1,169.55 for the first $100,000 plus $6.55 for each additional $1,000 or fraction thereof, to and including $500,000; Building Permit Fee — valuation $500,000.01 to $1,000,000.00 — $3,789.55 for the first $500,000 plus $5.55 for each additional $1,000 or fraction thereof, to and including $1,000,000; Building Permit Fee — valuation $1,000,000.01 and up — $6,564.55 for the first $1,000,000 plus $4.30 for each additional $1,000 or fraction thereof; Plan Check Fee — 65% of the Building Permit Fee; Construction Use Tax — 2% of 200% of Total Valuation (functionally a 4% use tax on the assumed 50%-materials portion of valuation); Permit Issuance/Transfer Fee — $25.00; Certificate of Occupancy Fee — $100.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

The Town of Eagle does not publish a specific numeric turnaround time for residential building permit review; its Building Department page states only that processing time depends on project complexity and directs applicants to contact the department directly.

You'll need: Building Permit Application (Community Core); Project Information Form (PIF) — In Town Single Family; Residential Energy Code Worksheet. Depending on your project, Eagle may also ask for: EEOP Calculation Worksheet. See the required-documents checklist on this page for details on each.

Eagle requires 4 inspection(s) for a residential building permit (new construction), in order: Foundation, Framing, Rough Plumbing / Mechanical, Final Inspection. Schedule each through Town of Eagle Building Division (Community Development) (970-328-9565).

Apply through Town of Eagle Building Division (Community Development) at 200 Broadway, PO Box 609, Eagle, CO 81631. Phone: 970-328-9565, email: permits@townofeagle.org. Office hours: General Building Division line (970) 328-9565; Inspection Hotline (970) 328-9626 (must call by 4:00 PM for next available inspection date). Due to limited staff capacity, the Town's own Building Department page states initial response times for phone calls and emails are approximately 3-5 business days. In-person appointments are recommended and should be scheduled by phone or email rather than walk-in. Chief Building Official: Dan Brown.. Official information: https://www.townofeagle.org/138/Building.

The Town of Eagle's own Community Development Department, Building Division issues building, mechanical, and plumbing permits for all work within Eagle town limits. Eagle is a statutory (non-home-rule) town with its own Building Division; Eagle County's Building Division explicitly excludes incorporated towns like Eagle from its unincorporated permitting program.

No. Electrical permitting and inspections within the Town of Eagle are handled entirely by the Colorado Division of Professions and Occupations (DPO) State Electrical Board, not the Town. This is confirmed both by the Town's own Building Department page and by the DPO's own Electrical Local Inspection Areas list, which names 'Eagle (Except Minturn and Town of Avon)' as state-administered electrical jurisdiction.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.