Skip to main content
PermitBase

EV Charger / Electric Vehicle Charging Station Permit in Gypsum, Colorado

Installing an EV charger circuit in Gypsum requires a separate Electrical Permit from the Town's Building Department, governed by the 2023 NEC as locally adopted -- the same standalone Electrical Permit process (distinct from the general Building Permit) already documented in this corpus's electrical-permit entry for Gypsum. No dedicated EV-charger/EVSE fee line, application, or checklist is published by the Town in any fetchable document; consistent with the Town's existing electrical-permit and solar-pv-permit entries, the trade-specific electrical fee table itself is not recoverable from the Town's website, its 2025 Annual Fee Schedule PDF (explicitly labeled partial and containing no permit valuation tables), or Title 15 of the Municipal Code (hosted on a JavaScript-rendered, access-controlled Municode application).

Verified 2026-07-20 · Source

When you need this permit

  • A separate Electrical Permit Application (distinct from the general Building Permit) is required for an EV charger circuit, submitted through the Town's online process at townofgypsum.com/electrical-permit-application
  • Governed by the 2023 NEC as adopted by the Town, per the Building Codes & Guidelines page, including NEC Article 625 (Electric Vehicle Power Transfer System)
  • Unlike solar, which is subject to Colorado's statewide $500 local-government fee cap for residential installations (C.R.S. 24-48.5-113), no equivalent statutory fee cap was found for EV charger permits
  • A Building Permit is required in addition only if new structural work (e.g., a carport or accessory structure) is built to house the charger, submitted through the same Building Plan Submittal online portal (gopost-gypsum.eplansoftreview.com) used for all other building permit types

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit Fee (EV charger circuit)Same unresolved gap as this corpus's existing electrical-permit entry for Gypsum -- no trade-specific electrical fee table was recoverable via the Town's site, its 2025 fee schedule PDF (labeled 'partial' by the Town, containing no permit valuation tables), or Title 15 of the Municipal Code (Municode SPA, no text recoverable via direct fetch or Wayback). No EV-specific line item was found either. Confirm current fee directly with the Building Department, 970-524-1731.
Not published in any fetchable Town document as of this review
Additional/Re-inspection FeeGeneral Town of Gypsum inspection fee, applies across trade permits per the Inspections page; base permit fee includes a maximum of four inspections
$60.00 per inspection

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / Electric Vehicle Charging Station Permit permit actually take in Gypsum?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Town inspector verifies the new circuit, breaker sizing, and disconnect (if required) before the charger is energized

See the full Gypsum inspection guide — scheduling & re-inspection fees →

Tips

  • Gypsum uses a standalone Electrical Permit Application (separate from the Building Permit Application) for electrical work like an EV charger circuit -- don't submit an EV charger job through the general Building Permit portal unless new structural work is also involved.
  • The Town's fee schedule for building/electrical permits is genuinely hard to find published online -- the 2025 Annual Fee Schedule PDF is explicitly labeled partial, and the governing Title 15 fee table lives behind a JavaScript-rendered Municode application. Call the Building Department directly for a current quote rather than assuming a figure.
  • Unlike solar, which benefits from Colorado's statewide $500 local-fee cap (C.R.S. 24-48.5-113), no equivalent statutory fee cap applies to EV charger permits in Gypsum.

Frequently asked questions

Gypsum requires an ev charger / electric vehicle charging station permit for: A separate Electrical Permit Application (distinct from the general Building Permit) is required for an EV charger circuit, submitted through the Town's online process at townofgypsum.com/electrical-permit-application; Governed by the 2023 NEC as adopted by the Town, per the Building Codes & Guidelines page, including NEC Article 625 (Electric Vehicle Power Transfer System); Unlike solar, which is subject to Colorado's statewide $500 local-government fee cap for residential installations (C.R.S. 24-48.5-113), no equivalent statutory fee cap was found for EV charger permits; A Building Permit is required in addition only if new structural work (e.g., a carport or accessory structure) is built to house the charger, submitted through the same Building Plan Submittal online portal (gopost-gypsum.eplansoftreview.com) used for all other building permit types. If your project isn't listed, confirm with Town of Gypsum Community Development Department, Building Department at 970-524-1731 before starting work.

No. Colorado's statewide fee cap for residential solar installations (C.R.S. 24-48.5-113, $500) is scoped specifically to solar energy systems and does not extend to EV charging equipment.

Gypsum does not publish a plan-review timeline for this permit. Contact Town of Gypsum Community Development Department, Building Department at 970-524-1731 for current turnaround.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Gypsum requires 1 inspection(s) for an ev charger / electric vehicle charging station permit, in order: Electrical Inspection. Schedule each through Town of Gypsum Community Development Department, Building Department (970-524-1731).

Apply through Town of Gypsum Community Development Department, Building Department at 50 Lundgren Blvd, Gypsum, CO 81637 (mailing: PO Box 130, Gypsum, CO 81637). Phone: 970-524-1731, email: stephanie@townofgypsum.com. Office hours: Building Department Staff available Monday-Friday, 8 a.m.-5 p.m., per the Building Permit Application page. Primary staff contact listed: Stephanie Roybal, Building Department Administrative Assistant. General Town phone line also published as 970-524-7514 on several Building Department sub-pages (DRB/HOA Review, Hours & Site Conditions).. Official information: https://www.townofgypsum.com/build-in-gypsum.

Gypsum, Colorado has adopted: 2021 International Building Code (IBC) — Town of Gypsum Building Codes & Guidelines page; 2021 International Residential Code (IRC); 2021 International Fire Code (IFC); 2021 International Plumbing Code (IPC); 2021 International Mechanical Code (IMC); 2021 International Fuel Gas Code (IFGC); 2018 International Energy Conservation Code (IECC) — note this is one code cycle behind the 2021 IBC/IRC/IFC/IPC/IMC/IFGC family adopted alongside it; confirmed as published, not a transcription error; 2023 National Electrical Code (NEC); ICC/ANSI A117.1 Accessibility Standards, 2009 Edition; Local amendments to all adopted codes are codified in Title 15 (Buildings and Construction) of the Gypsum Municipal Code; Title 15's full text is hosted on Municode (library.municode.com/co/gypsum), which serves its content through a client-side Angular application behind an access-controlled API — direct fetch and a dated Wayback Machine snapshot (2026-02-13) both returned only the unrendered application shell with no section text recoverable, so specific amendment section numbers/text beyond what the Town's own townofgypsum.com pages state in plain HTML are not independently reproduced here rather than guessed.. Local amendments apply — see the Gypsum overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gypsum building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.