Roofing Permit (Re-Roof) — Gypsum, Colorado · Requirements sheet
Verified 2026-08-17 · Source: https://www.townofgypsum.com/building-permit-application
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Roofing Permit (Re-Roof) in Gypsum, Colorado
Required for re-roofing work in the Town of Gypsum. Smaller re-roof projects that do not require plans are eligible for the Town's one-time permit application process rather than the full plan-submittal portal. Governed by the 2021 IRC/IBC as adopted.
Verified 2026-08-17 · Source
When you need this permit
- A new roof is explicitly listed by the Town as an example of a smaller project eligible for a one-time permit application (i.e., not requiring a full plan set), per the Building Permit Application page
- DRB/HOA approval may still be required for parcels outside Eagle River Estate/Bertroch since re-roofing can be considered exterior work — confirm with the applicable DRB/HOA
- All contractors must hold a current Town of Gypsum Contractor's License Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Sec. 15.02.010, Table 1 ("Town of Gypsum permit requirements") states verbatim: "Building permit fees for the replacement of the roof for one- and two-family structures is $60.00". Show full citationHide
Sec. 15.02.010, Table 1 ("Town of Gypsum permit requirements") states verbatim: "Building permit fees for the replacement of the roof for one- and two-family structures is $60.00". The same sentence continues into a siding figure for one- and two-family structures which is not recorded here. No roofing figure for structures other than one- and two-family is recorded. Town of Gypsum Code of Ordinances, Title 15 (BUILDINGS AND CONSTRUCTION), Chapter 15.02 (TABLES). Title 15 was repealed and re-enacted in full by Ord. No. 2023-08, § 1(Exh. A), 2023-06-27; code current through Ord. No. 2025-18, enacted 2026-01-13 (Supp. No. 22). Code text as published on library.municode.com (accessed 2026-08-17).Review timeline
Inspection process
- 1
TCO/COO (Final)
Completed roof inspection verified against approved scope
See the full Gypsum inspection guide — scheduling & re-inspection fees →
Tips
- A new roof is one of the Town's named examples of a project eligible for the simpler one-time permit application, alongside electrical panel upgrades and plumbing fixture replacement — you likely do not need the full plan-submittal portal process for a straightforward re-roof.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-17.
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gypsum building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Gypsum's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Gypsum yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Gypsum lands. Privacy.
Other permits in Gypsum
Roofing Permit (Re-Roof) in other cities
Compare roofing permit (re-roof) fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Gypsum project checklist
Describe your project once and get every permit, document, and fee it triggers in Gypsum — in one checklist. Free, for any city and any number of projects.
Get started →