Residential Building Permit (New Construction) in Gypsum, Colorado
Required for new construction of single-family homes, duplexes, and townhomes in the Town of Gypsum. Reviewed under the 2021 IRC/IBC as locally adopted plus the Town's published design criteria (40 psf ground snow load, 90 mph wind design exposure, 42-inch frost depth, Seismic Design Category C). Issued by the Community Development Department, Building Department, after Design Review Board/HOA approval where applicable.
Verified 2026-07-06 · Source
When you need this permit
- Design Review Board (DRB) or Homeowners Association (HOA) approval required before building permit submittal, unless the project is within Eagle River Estate or Bertroch (which do not require this step) — a letter or stamped approved plan set must be provided at submittal
- Plans must comply with the 2021 IRC/IBC as adopted, and must meet the Town's design criteria: 40 psf ground snow load, 90 mph wind design exposure, 42-inch minimum frost depth, Seismic Design Category C
- Soils testing required; if bearing values test below 1,500 PSF, an engineered, stamped foundation plan is required
- Full plan set required: title block with legal description/subdivision/lot-block/address/preparer/owner, site plan (preferred 1"=10' scale) showing easements/utilities/landscaping/drainage/existing structures, footing and foundation plans, framing plans with sections and opening locations, floor plans (room usage, windows/doors, drywall type, electrical outlets, smoke detectors, fire-rated walls, exit corridors), elevations, building/wall sections foundation-to-roof, and stair details with rise/run/headroom
- All contractors must hold a current Town of Gypsum Contractor's License ($152/year per the 2025 fee schedule) in addition to any required Colorado state trade license Contractor
- Improvement Location Survey (ILS) required before Certificate of Occupancy is issued
- Applications submitted via the Town's online Building Permit & Plan Submittal portal (Streamline); separate permits required for Electrical, Plumbing, and Mechanical work
- Permit becomes null and void if work is not commenced within 180 days of issuance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing
Before concrete placement
- 2
Foundation Wall
Before concrete placement
- 3
Groundwork
Before base course installation
- 4
Backfill
Before foundation backfilling
- 5
Rough-in/Framing
Before insulation and wall covering
- 6
Electric & Gas Service
After utilities are installed
- 7
Lath/Insulation/Drywall
During finishing stages
- 8
TCO/COO (Temporary/Final Certificate of Occupancy)
Improvement Location Survey required before Certificate of Occupancy is issued
See the full Gypsum inspection guide — scheduling & re-inspection fees →
Tips
- Gypsum's design criteria (40 psf snow load, 90 mph wind, 42-inch frost depth, Seismic Category C) are meaningfully lighter than neighboring mountain towns like Vail (145 psf, 115 mph, 48-inch frost) — Gypsum sits at lower valley elevation. Do not reuse a peer Eagle County jurisdiction's structural design assumptions.
- DRB/HOA approval is required before Town submittal for any parcel outside Eagle River Estate or Bertroch — contact Town staff early to confirm which DRB/HOA governs your specific subdivision, since Gypsum's website does not publish a master list.
- A 24-hour advance notice is required to schedule any inspection, and the base permit fee only covers four inspections — plan your inspection sequence to avoid the $60 additional-inspection fee stacking up.
- The Town's own posted fee schedule is explicitly 'partial' and does not contain the actual building-permit valuation fee table — call the Building Department directly (970-524-1731) for a specific project's fee estimate rather than relying on a published number.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gypsum building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Gypsum
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Gypsum project checklist
Describe your project once and get every permit, document, and fee it triggers in Gypsum — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →