Accessory Dwelling Unit (ADU) Permit — Gypsum, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.townofgypsum.com/accessory-dwelling-units
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) Permit in Gypsum, Colorado
Required for construction of a new Accessory Dwelling Unit, or to bring an existing non-approved ADU into compliance, on a single-family lot in Gypsum. Processed alongside a standard Building Permit for the structure itself, plus a dedicated ADU application, deed restriction, and utility documentation.
Verified 2026-07-06 · Source
When you need this permit
- Maximum size: 800 sq ft or 50% of the primary dwelling's floor area, whichever is smaller
- Only one ADU permitted per lot; not permitted in multi-family or mobile home park settings
- Allowed forms: detached, attached, interior (upper or lower unit), above-garage, or garage conversion; mobile homes, travel trailers, and RVs are prohibited as an ADU
- Property owner must reside on-site; the ADU cannot be subdivided or sold separately from the primary home
- Maximum two parking spaces per ADU, in a garage or driveway (limited on-street exception)
- Separate trash service subscription required for the ADU
- Water/sewer: monthly service fee applies; septic/well documentation required if Town water/sewer service is unavailable
- Upon sale of the property, the new owner must complete a transfer of the ADU's deed restriction and records (typically handled by the realtor)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Town of Gypsum Code of Ordinances Sec. 15.01.040(g) (Chapter 15.01, INTERNATIONAL CODES), amending IBC Section 109.2 "Schedule of permit fees". Show full citationHide
Town of Gypsum Code of Ordinances Sec. 15.01.040(g) (Chapter 15.01, INTERNATIONAL CODES), amending IBC Section 109.2 "Schedule of permit fees". Title 15 was repealed and re-enacted in full by Ord. No. 2023-08, § 1(Exh. A), adopted 2023-06-27; code current through Ord. No. 2025-18, enacted 2026-01-13 (Supp. No. 22). Code text as published on library.municode.com (accessed 2026-08-17). Commercial valuation is set by the most current ICC Building Valuation Data Chart per the same subsection. Per-trade fee tables are codified at Sec. 15.02.020 Table 2 (mechanical), Sec. 15.02.030 Table 3 (plumbing), Sec. 15.02.050 Table 4 (electrical) — mechanical and plumbing both compute as a $60.00 base plus $16.00 per additional increment. Sec. 15.01.040(h) sets permit transfer at 65% of the original building permit fee.Review timeline
Inspection process
- 1
Standard Building Permit Inspection Sequence
Follows the same footing/foundation/rough-in/final sequence as new construction or an addition, depending on ADU type (detached, attached, garage conversion, etc.)
- 2
Re-inspection (ADU transfer)
Required when an existing approved ADU transfers to a new owner
See the full Gypsum inspection guide — scheduling & re-inspection fees →
Tips
- Both the property owner AND a tenant can be fined for leasing an unpermitted ADU in Gypsum — verify any existing ADU on a property you're purchasing has been formally approved, not just built.
- An ADU deed restriction must be transferred at time of sale — this is a real, separate recording step ($43 fee) that a standard title transfer will not automatically catch; flag it for your realtor.
- Only one ADU is allowed per lot regardless of lot size, and mobile homes/RVs/travel trailers can never qualify as the ADU structure itself.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gypsum building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Gypsum's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Gypsum yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Gypsum lands. Privacy.
Other permits in Gypsum
Accessory Dwelling Unit (ADU) Permit in other cities
Compare accessory dwelling unit (adu) permit fees across Colorado →
Look up this fee in a different city →