Solar Photovoltaic (PV) Permit in Gypsum, Colorado
Required for installation of rooftop or ground-mount solar photovoltaic systems within Gypsum town limits. The Town's own Build in Gypsum guidance states directly: "Solar panel projects do require plan submittal, review, and a permit," processed through the same Building Plan Submittal portal (gopost-gypsum.eplansoftreview.com) used for all other building permits — no dedicated solar/photovoltaic application, checklist, or fee line is published separately.
Reviewed 2026-08-17 · Source
When you need this permit
- Solar panel projects require plan submittal, review, and a permit, per the Town's Build in Gypsum page — submitted through the Building Plan Submittal portal (gopost-gypsum.eplansoftreview.com/#/login?portal=gypsum), the same portal used for all building permit types
- Colorado's statewide solar-permit fee cap (C.R.S. 24-48.5-113, enacted via HB21-1284) limits the aggregate local-government building-permit fees chargeable for a residential solar installation to $500 (and $1,000 for commercial)
- Colorado HB25-1096 (Automated Permits for Clean Energy Technology) required municipalities with population over 5,000 to adopt an automated residential solar permitting platform (e.g., SolarAPP+) by July 1, 2026; Gypsum's population is approximately 7,000-7,500 (over the threshold), but no Town-published confirmation of SolarAPP+ or equivalent adoption was found on the Build in Gypsum, Building Permit Application, or Forms pages as of the last verification
- Electrical wiring/interconnection scope requires a separate Electrical Permit; no trade-specific electrical fee table is published on the Town's website (see the electrical-permit entry)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Town of Gypsum Code of Ordinances Sec. 15.01.040(g) (Chapter 15.01, INTERNATIONAL CODES), amending IBC Section 109.2 "Schedule of permit fees". Show full citationHide
Town of Gypsum Code of Ordinances Sec. 15.01.040(g) (Chapter 15.01, INTERNATIONAL CODES), amending IBC Section 109.2 "Schedule of permit fees". Title 15 was repealed and re-enacted in full by Ord. No. 2023-08, § 1(Exh. A), adopted 2023-06-27; code current through Ord. No. 2025-18, enacted 2026-01-13 (Supp. No. 22). Code text as published on library.municode.com (accessed 2026-08-17). Commercial valuation is set by the most current ICC Building Valuation Data Chart per the same subsection. Per-trade fee tables are codified at Sec. 15.02.020 Table 2 (mechanical), Sec. 15.02.030 Table 3 (plumbing), Sec. 15.02.050 Table 4 (electrical) — mechanical and plumbing both compute as a $60.00 base plus $16.00 per additional increment. Sec. 15.01.040(h) sets permit transfer at 65% of the original building permit fee.Town of Gypsum Code of Ordinances Chapter 15.02 (TABLES), Sec. Show full citationHide
Town of Gypsum Code of Ordinances Chapter 15.02 (TABLES), Sec. 15.02.050 Table 4. Title 15 was repealed and re-enacted in full by Ord. No. 2023-08, § 1(Exh. A), adopted 2023-06-27; code current through Ord. No. 2025-18, enacted 2026-01-13 (Supp. No. 22). Code text as published on library.municode.com (accessed 2026-08-17). Table 4 is codified in Chapter 15.02; individual line items are not reproduced here, so the amount records the governing table rather than asserting a figure.Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement verified before energizing
- 2
Final Inspection
Racking/roof-penetration attachment, electrical connections, and interconnection point verified
See the full Gypsum inspection guide — scheduling & re-inspection fees →
Tips
- Gypsum's own guidance explicitly confirms solar panel projects need a permit — don't assume small rooftop systems are exempt — but there is no dedicated solar application or fee line, so the general Building Permit process (via the online eplansoftreview portal) applies.
- Colorado's statewide solar-fee cap (C.R.S. 24-48.5-113) limits total local government fees for a residential system to $500, regardless of what the Town's (currently unpublished-online) valuation-based fee table would otherwise calculate.
- As a town over 5,000 population, Gypsum is covered by Colorado HB25-1096's July 1, 2026 automated-permitting mandate — ask the Building Department directly whether an instant/automated review pathway (e.g., SolarAPP+) is now available, since the Town has not published this online as of the last verification.
- The Town's building-permit valuation fee table is codified in Municipal Code Title 15 rather than published as a standalone schedule; get a written fee quote directly from Building Department staff (Stephanie Roybal, stephanie@townofgypsum.com, 970-524-1731) before budgeting.
- townofgypsum.com/build-in-gypsum publishes only utility connection fees (Water Tap Fee $8,000 rising to $10,000; Sewer Tap Fee $12,000 rising to $14,000) -- these are utility hookup fees, not building/electrical permit fees, and are not cited as a proxy. The Town's Code of Ordinances Title 15 (Buildings and Construction) is hosted at library.municode.com/co/gypsum/codes/code_of_ordinances?nodeId=TIT15BUCO; no separate Town of Gypsum fee resolution PDF is published. Colorado's statewide solar-fee cap (C.R.S. 24-48.5-113, $500 residential) applies as a ceiling on whatever the Town charges, but that statute alone does not establish Gypsum's base valuation-based fee. No governing base dollar figure is published; confirm directly with the Town's Building Department.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-17.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gypsum building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Gypsum's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Gypsum yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Gypsum lands. Privacy.
Other permits in Gypsum
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Gypsum project checklist
Describe your project once and get every permit, document, and fee it triggers in Gypsum — in one checklist. Free, for any city and any number of projects.
Get started →