Addition / Remodel Permit in Avon, Colorado

Required anytime a project affects the existing structure or exterior of a property in Avon, including new windows, doors, siding, decks, and similar work, per the Town's own 'Common Building Permit Types' guide. Reviewed under the 2021 IRC as locally adopted; projects with exterior changes may additionally require Planning Division review.

Verified 2026-07-06 · Source

When you need this permit

  • Required anytime a project affects the existing structure or exterior of a property (new windows, doors, siding, decks, etc.)
  • Depending on scope, the project may need to go through Planning Division review initially (Minor or Major Development Plan)
  • Cosmetic-only interior work (cabinets, countertops, flooring, interior paint) does NOT require a building permit
  • Electrical work included in an addition/remodel scope must still be separately permitted through DORA, not the Town
  • Contractor Business License required through Cloudpermit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (same valuation-based schedule as new construction)
$50.00 minimum, scaling per the valuation tiers in the Community Development Fee Schedule (Exhibit A to Resolution 24-11)
Building Plan Review FeeNon-refundable regardless of outcome
65% of Building Permit Fee
Plumbing/Mechanical Permit Fee (if applicable, included with Building Permit)
15% of Building Permit Fee each

Review timeline

Plan reviewAvon’s published plan-review target
2–14 business days

How long did your Addition / Remodel Permit permit actually take in Avon?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Frame

    Framing complete, connection to existing structure verified

  2. 2

    Rough Plumbing / Mechanical

    Trade rough-ins before concealment where applicable

  3. 3

    Final Inspection

    All work complete per approved plans

See the full Avon inspection guide — scheduling & re-inspection fees →

Tips

  • Not every addition/remodel needs Planning Division review — the Town's guide says it depends on scope ('this permit may need to go through planning review initially') — confirm with the Community Development Coordinator (970-748-4012) before assuming either way.
  • Cosmetic interior work like cabinets, countertops, flooring, and interior paint is exempt from a building permit entirely in Avon — don't over-apply for a purely cosmetic scope.

Frequently asked questions

Avon requires an addition / remodel permit for: Required anytime a project affects the existing structure or exterior of a property (new windows, doors, siding, decks, etc.); Depending on scope, the project may need to go through Planning Division review initially (Minor or Major Development Plan); Cosmetic-only interior work (cabinets, countertops, flooring, interior paint) does NOT require a building permit; Electrical work included in an addition/remodel scope must still be separately permitted through DORA, not the Town; Contractor Business License required through Cloudpermit. If your project isn't listed, confirm with Town of Avon Community Development Department, Building Division at 970-748-4030 before starting work.

In Avon, the published Building Permit Fee (same valuation-based schedule as new construction) is: $50.00 minimum, scaling per the valuation tiers in the Community Development Fee Schedule (Exhibit A to Resolution 24-11). Additional published fees: Building Plan Review Fee — 65% of Building Permit Fee; Plumbing/Mechanical Permit Fee (if applicable, included with Building Permit) — 15% of Building Permit Fee each. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Avon's published plan-review target for an addition / remodel permit is 2–14 business days.

You'll need: Building Permit Application (Cloudpermit); Full-Size Paper Plan Set. See the required-documents checklist on this page for details on each.

Avon requires 3 inspection(s) for an addition / remodel permit, in order: Rough Frame, Rough Plumbing / Mechanical, Final Inspection. Schedule each through Town of Avon Community Development Department, Building Division (970-748-4030).

Apply through Town of Avon Community Development Department, Building Division at 100 Mikaela Way, P.O. Box 975, Avon, CO 81620. Phone: 970-748-4030, email: eblock@avon.org. Office hours: 8:00 a.m. - 5:00 p.m., Monday - Friday. Building Official Derek Place: dplace@avon.org, 970-748-4011. Building Inspector Matt Waldrop: mwaldrop@avon.org, 970-748-4098. Community Development Coordinator Emily Block: eblock@avon.org, 970-748-4012. Main Town line: 970-748-4000.. Official information: https://www.avon.org/151/Building.

Avon, Colorado has adopted: 2021 International Building Code (IBC) — Town of Avon Adopted Building Codes page; 2021 International Residential Code (IRC); 2021 International Energy Conservation Code (IECC); 2021 International Plumbing Code (IPC); 2021 International Fuel Gas Code (IFGC); 2021 International Mechanical Code (IMC); 2021 International Fire Code (IFC), with additions and exceptions per the Eagle River Fire Protection District (ERFPD); 2021 International Swimming Pool and Spa Code; 2021 International Property Maintenance Code; 2021 International Wildland-Urban Interface Code; 2023 National Electrical Code (NEC) — administered by the Colorado Department of Regulatory Agencies (DORA), not the Town, per the Town's own 'Common Building Permit Types' document; ICC A117.1-2017 Standard for Accessible and Usable Buildings and Facilities; Note on code currency: Avon's adopted-codes list (2021 I-Codes cycle) is one cycle behind Vail's currently posted 2024 I-Codes list within the same county — confirmed directly against the Town's own Adopted Building Codes page as of this review; do not assume parity with Vail's code edition.. Local amendments apply — see the Avon overview page for the full list.

Yes. The Town's own guide states an Addition/Remodel permit 'is required anytime you are affecting the existing structure or exterior of a property. This includes projects such as installation of new windows, doors, siding, decks, etc.'

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Avon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.