Skip to main content
PermitBase

Mechanical / Gas Permit in Avon, Colorado

Required for work on mechanical systems in the Town of Avon, per the Town's own guide (HVAC system replacement, gas line repair, etc.). Governed by the 2021 International Mechanical Code (IMC) and 2021 International Fuel Gas Code (IFGC) as adopted. Billed as a percentage add-on to the Building Permit fee.

Verified 2026-07-06 · Source

When you need this permit

  • Required if work is being performed on mechanical systems, e.g. HVAC system replacement, gas line repair
  • Governed by the 2021 IMC and 2021 IFGC as adopted by the Town of Avon
  • Gas fireplace installation/repair may require a Fireplace Permit (a related but distinct category on the Town's own permit-types guide) which may also require a plumbing permit depending on scope

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Mechanical Permit Fee (with Building Permit)Community Development Fee Schedule, Exhibit A to Resolution 24-11
15% of Building Permit Fee
Mechanical Plan Review Fee (with Building Permit)Non-refundable regardless of outcome
65% of Mechanical Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Mechanical / Gas Permit permit actually take in Avon?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

See the full Avon inspection guide — scheduling & re-inspection fees →

Tips

  • Mechanical permits are billed as a percentage (15%) of the Building Permit Fee in Avon, the same structure as plumbing — there is no separate standalone mechanical fee table.
  • Gas fireplace work may fall under a separate 'Fireplace Permit' category on Avon's own permit-types guide rather than the general mechanical/gas permit — confirm which category applies to your specific scope with the Building Division.

Frequently asked questions

Yes. The Town's Common Building Permit Types guide lists 'Mechanical/gas permit' as 'Required if work is being performed on mechanical systems, i.e. HVAC system replacement, gas line repair, etc.'

In Avon, the published Mechanical Permit Fee (with Building Permit) is: 15% of Building Permit Fee. Additional published fees: Mechanical Plan Review Fee (with Building Permit) — 65% of Mechanical Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Avon does not publish a plan-review timeline for this permit. Contact Town of Avon Community Development Department, Building Division at 970-748-4030 for current turnaround.

You'll need: Building/Mechanical Permit Application (Cloudpermit). See the required-documents checklist on this page for details on each.

Avon requires 2 inspection(s) for a mechanical / gas permit, in order: Rough Mechanical, Final Inspection. Schedule each through Town of Avon Community Development Department, Building Division (970-748-4030).

Apply through Town of Avon Community Development Department, Building Division at 100 Mikaela Way, P.O. Box 975, Avon, CO 81620. Phone: 970-748-4030, email: eblock@avon.org. Office hours: 8:00 a.m. - 5:00 p.m., Monday - Friday. Building Official Derek Place: dplace@avon.org, 970-748-4011. Building Inspector Matt Waldrop: mwaldrop@avon.org, 970-748-4098. Community Development Coordinator Emily Block: eblock@avon.org, 970-748-4012. Main Town line: 970-748-4000.. Official information: https://www.avon.org/151/Building.

Avon, Colorado has adopted: 2021 International Building Code (IBC) — Town of Avon Adopted Building Codes page; 2021 International Residential Code (IRC); 2021 International Energy Conservation Code (IECC); 2021 International Plumbing Code (IPC); 2021 International Fuel Gas Code (IFGC); 2021 International Mechanical Code (IMC); 2021 International Fire Code (IFC), with additions and exceptions per the Eagle River Fire Protection District (ERFPD); 2021 International Swimming Pool and Spa Code; 2021 International Property Maintenance Code; 2021 International Wildland-Urban Interface Code; 2023 National Electrical Code (NEC) — administered by the Colorado Department of Regulatory Agencies (DORA), not the Town, per the Town's own 'Common Building Permit Types' document; ICC A117.1-2017 Standard for Accessible and Usable Buildings and Facilities; Note on code currency: Avon's adopted-codes list (2021 I-Codes cycle) is one cycle behind Vail's currently posted 2024 I-Codes list within the same county — confirmed directly against the Town's own Adopted Building Codes page as of this review; do not assume parity with Vail's code edition.. Local amendments apply — see the Avon overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Avon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.