Akron building inspections

Inspection sequence, scheduling, and re-inspection fees for building permits in Akron, Colorado.

Reviewed 2026-07-13 · Source

How to schedule

Inspections are requested through the building department below.

Address
250 Main Ave, Akron, CO 80720
Phone
970-345-2624
Office hours
Monday - Thursday, 7:30 AM - 5:30 PM; closed Fridays. Fax: 970-345-2617. Per Town Code 10-1-1, the Building Inspector is appointed by the Board of Trustees at its first regular meeting following each biennial election and serves as chief enforcement officer for all Title 10 building regulations (except fire prevention code); there is no separate physical 'Building Department' office distinct from Town Hall in this small Eastern Plains town (2020 Census population 1,757).

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation

    Before concrete pour, per Akron's 30-inch minimum frost line depth (Table R301.2(1))

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Final Inspection

    All work complete per approved plans and applicable codes; required for permanent power/occupancy

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Town Building/Structural Inspection

    Racking attachment, roof penetration sealing verified by the Town's Building Inspector

  2. 2

    State Electrical Rough Inspection

    Wiring and panel installed before concealment; scheduled and performed by the State Electrical Board's inspector for the Akron/Washington County area

  3. 3

    State Electrical Final Inspection

    Devices installed, panel labeled, system energized; required for permanent power release

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment; scheduled and performed by the State Electrical Board's inspector for the Akron/Washington County area

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized; required for permanent power release

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough Electrical

    Wiring and circuit installed before concealment; scheduled with the State Electrical Board's inspector for the Akron/Washington County area

  2. 2

    Final Inspection

    Charger installed and energized, panel/circuit labeled

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment; scheduled and performed by the State Plumbing Board's inspector for the area

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified; required before permanent water release

Applies to: Residential Addition / Remodel Permit

  1. 1

    Rough-in (framing/trades as applicable)

    Before concealment of new framing or trade work added by the addition/remodel

  2. 2

    Final Inspection

    All work complete per approved plans and applicable codes

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Akron building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Akron building permits

Get alerts for Akron

We'll email you when Akron's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.