Basalt building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Basalt, Colorado.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
101 Midland Avenue, Basalt, CO 81621
Phone
970-927-4702
Office hours
Town of Basalt main line 970-927-4701; Building Department direct line 970-927-4702. Chief Building Official: Mitch Miller, 970-279-4386, mitch.miller@basalt.net. Plans Examiner & Inspector: Carlos Peugnet, 970-279-4385, carlos.peugnet@basalt.net. As of May 2017 the Building Department no longer performs inspections or site visits on Mondays and Fridays (confirmed on the Building Department page).

Inspection sequence

Applies to: Residential Addition / Alteration-Remodel Permit

  1. 1

    Foundation (additions with new footings only)

  2. 2

    Rough Frame

    Framing complete, connection to existing structure verified

  3. 3

    Rough Mechanical / Plumbing

  4. 4

    Final Inspection

Applies to: Residential Building Permit (New Construction, Single-Family/Duplex/Townhome)

  1. 1

    Foundation

    Before concrete pour, per 36-inch minimum frost depth

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Mechanical / Plumbing

    Trade rough-ins before concealment (electrical rough-in is inspected separately by the State of Colorado Electrical Board)

  4. 4

    Final Inspection

    All work complete per approved plans and applicable codes

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Performed by the State of Colorado Electrical Board inspector, not a Town of Basalt inspector

  2. 2

    Final Inspection

    State of Colorado Electrical Board final inspection and sign-off

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

Applies to: Roofing Permit (Re-Roof)

  1. 1

    Mid-Roof / Underlayment Inspection

    Ice barrier underlayment and deck condition verified before roof covering installation

  2. 2

    Final Inspection

    Completed roof — material, flashing, and underlayment compliance verified

Applies to: Solar Photovoltaic (PV) System Permit

  1. 1

    Rough-In Inspection

    Verify location and placement of array (Town of Basalt Building PV inspection)

  2. 2

    Final Inspection

    Verify operation of array (Town of Basalt Building PV inspection); separate final sign-off also required from the Colorado State Electrical Board and Roaring Fork Fire Authority

Basalt building permits

Get alerts for Basalt

We'll email you when Basalt's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.