Commercial Tenant Improvement / Core and Shell Permit in Bennett, Colorado

Required for commercial tenant improvement and core-and-shell buildout projects in Bennett. Uses reduced-percentage valuations of the calculated new-construction square-footage valuation rather than a full new-build valuation.

Verified 2026-07-06 · Source

When you need this permit

  • Core and Shell valuations may be reduced to 70% of the calculated new-construction square-footage valuation
  • Tenant Improvement valuations may be reduced to 30% of the calculated new-construction square-footage valuation
  • New Commercial Development Checklist and New Commercial Inspection Process guide define required submittal contents and inspection sequencing
  • Governed by the 2024 IBC (2018 IBC for pre-transition permits)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based, per the Town's standard schedule)Valuation reduced to 70% (core and shell) or 30% (tenant improvement) of the full new-construction square-footage valuation before applying the fee table
$23.50 minimum, scaling per the valuation tiers in the June 2026 Schedule of Fees
Plan Review (Administrative) Fee
65% of Permit Fee
Use Tax
2% of half the total project valuation (plus 0.25% Arapahoe County open space tax if applicable)

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement / Core and Shell Permit permit actually take in Bennett?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Frame / MEP

    Structural framing and mechanical/electrical/plumbing rough-ins before concealment

  2. 2

    Bennett-Watkins Fire Rescue Inspection

    Fire suppression, detection, water supply/cistern review specific to commercial occupancy, scheduled directly with BWFD

  3. 3

    Final Inspection / Certificate of Occupancy

    All work complete per approved plans and applicable codes

See the full Bennett inspection guide — scheduling & re-inspection fees →

Tips

  • A Core and Shell buildout is valued at 70% of full new-construction valuation, while a pure Tenant Improvement (finishing an existing shell) is valued at just 30% — confirm which category your commercial project falls into before estimating fees, since it changes your Building Permit Fee substantially.
  • Commercial projects trigger Bennett-Watkins Fire Rescue's own separate, more extensive review (suppression/detection systems, water supply/cisterns) on top of the Town Building Department's own commercial plan review — budget for both processes running in parallel.

Frequently asked questions

Bennett requires a commercial tenant improvement / core and shell permit for: Core and Shell valuations may be reduced to 70% of the calculated new-construction square-footage valuation; Tenant Improvement valuations may be reduced to 30% of the calculated new-construction square-footage valuation; New Commercial Development Checklist and New Commercial Inspection Process guide define required submittal contents and inspection sequencing; Governed by the 2024 IBC (2018 IBC for pre-transition permits). If your project isn't listed, confirm with Town of Bennett Community Development Department, Building Department at 303-644-3249 before starting work.

Tenant Improvement valuations may be reduced to 30% of the calculated new-construction square-footage valuation for the same occupancy/construction type, per the Town's Permit Valuations guide — substantially lower than a full new-build valuation for the same square footage.

Bennett does not publish a plan-review timeline for this permit. Contact Town of Bennett Community Development Department, Building Department at 303-644-3249 for current turnaround.

You'll need: Building Permit Application — Commercial scope; New Commercial Development Checklist. Depending on your project, Bennett may also ask for: New Commercial Inspection Process guide. See the required-documents checklist on this page for details on each.

Bennett requires 3 inspection(s) for a commercial tenant improvement / core and shell permit, in order: Rough Frame / MEP, Bennett-Watkins Fire Rescue Inspection, Final Inspection / Certificate of Occupancy. Schedule each through Town of Bennett Community Development Department, Building Department (303-644-3249).

Apply through Town of Bennett Community Development Department, Building Department at 207 Muegge Way, Bennett, CO 80102. Phone: 303-644-3249, email: bennettbuilding@bennett.co.us. Office hours: Main Town line 303-644-3249 (Building Department extension 1032 per the Building Permits page). Chief Building Official (Steve Jones, Charles Abbott Associates — Bennett's building department is staffed via a CAA contract) holds Drop-In Hours at Town Hall Tuesdays 12:30-1:30 p.m.; email bennettbuilding@bennett.co.us or stevejones@caa.inc to schedule a plan/project review meeting. Additional CAA inspection staff: Brad Jones 720-960-0576 (bradjones@caa.inc), Daniel Willman 720-361-9732 (danielwillman@caa.inc). Inspection requests must be received by 4:00 p.m. the business day before for next-day scheduling; inspections occur Monday-Friday, 7:00 a.m.-5:00 p.m., no specific-window guarantee.. Official information: https://www.bennettco.gov/community-development/page/building-department.

Bennett, Colorado has adopted: 2024 International Building Code (IBC) — effective July 1, 2026 per Town of Bennett 'Building Code Update 2026' notice; 2024 International Residential Code (IRC) — effective July 1, 2026; 2024 International Existing Building Code (IEBC) — effective July 1, 2026; 2024 International Mechanical Code (IMC) — effective July 1, 2026; 2024 International Energy Conservation Code (IECC) — effective July 1, 2026; 2024 International Plumbing Code (IPC) — effective July 1, 2026; 2024 International Fire Code (IFC) — effective July 1, 2026 for the Town's own adoption (Bennett-Watkins Fire Rescue, the separate special district that performs fire plan review/inspection for Bennett, Watkins, and unincorporated Adams/Arapahoe County, is separately shown by its own website as still operating under the 2018 IFC as of this review — confirm current fire-district code edition directly with Bennett-Watkins Fire Rescue at 303-644-3572, since fire code adoption is that district's own action, not the Town Building Department's); 2024 International Fuel Gas Code (IFGC) — effective July 1, 2026; 2024 International Swimming Pool and Spa Code (ISPSC) — effective July 1, 2026 (new code title added in this cycle; no 2018-cycle equivalent was listed); Colorado Model Electric and Solar Ready Code — effective July 1, 2026 (statewide model code addressing EV/solar readiness, adopted by the Town as part of the 2026 cycle); 2025 Colorado Wildfire Resiliency Code — effective July 1, 2026; 2023 National Electrical Code (NEC) — currently in effect per the Town's Adopted Building Department Codes list (the NEC was not part of the July 1, 2026 update batch and continues under its existing adoption); PRIOR CYCLE (2018 codes), still governing permits issued before July 1, 2026 that have not expired: 2018 IBC, 2018 IRC, 2018 IPC, 2018 IMC, 2018 IEBC, 2018 IFC, 2018 IFGC, 2018 IECC.; Transition rule (per the Town's 'Building Code Update 2026' notice, verified directly): the Town issued NO permits under the 2024 cycle before July 1, 2026. Permits issued under the 2018 cycle before July 1, 2026 may finish construction on that code cycle, UNLESS the permit expires after July 1, 2026, in which case renewal or a new permit after that date requires meeting 2024 code. All permits issued on or after July 1, 2026 must meet the 2024 I-codes. EXCEPTION: 8 named residential master-plan developments currently under construction on 2018-cycle approved master plans (Bennett Avenue Townhomes; Bennett Crossing Filing 5 Phases 1A/1B; Bennett Ranch Filing 1; Bennett Ranch Filing 2; Horizon Village; Muegge Farms Filing 4 Phases 4A/4B; Muegge Farms Filing 5; Muegge Farms Filing 7 Phase 1) are given until July 1, 2028 to finish their current phase under the 2018 cycle. As of this file's lastVerified date (2026-07-06), the 2024 cycle is the live, current adopted code for new permit applications outside these named exceptions.. Local amendments apply — see the Bennett overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bennett building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Bennett.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.