Commercial Tenant Improvement Permit in Dacono, Colorado

Required for commercial tenant finish/improvement work in Dacono. Governed by the 2024 IBC as locally adopted. The City's Fee Schedule includes commercial-specific impact fees (City Hall Facilities, Regional Park and Trails, Transportation) assessed per square foot by use type.

Verified 2026-07-06 · Source

When you need this permit

  • Governed by the 2024 IBC as locally adopted
  • Commercial PV/solar work and other engineered commercial systems require engineer-stamped plans per SAFEbuilt's submittal requirements
  • Certificate of Occupancy or Temporary Certificate of Occupancy required before commercial occupancy

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee
Computed from ICC Building Valuation Data / project valuation
Plan Review Fee
65% of Permit Fee
Construction Use Tax
1.5% of total project cost (materials)
City Hall Facilities Impact Fee — CommercialOrdinance 914; also Industrial $1.24/sq ft, Office/Institutional $0.26/sq ft, Warehousing $2.26/sq ft
$1.78 per square foot
Transportation Impact Fee — CommercialOrdinance 914; also Industrial $1.23/sq ft, Office/Institutional $2.41/sq ft, Warehousing $0.43/sq ft
$6.33 per square foot
Certificate of OccupancyIncludes two inspections
$125.00
Temporary Certificate of OccupancyIncludes two inspections
$225.00 plus $50.00 per month until CO is issued
Site Plan Application FeeDevelopment application fee, separate from building permit fee
$1,000.00

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement Permit permit actually take in Dacono?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Trades (Electrical/Plumbing/Mechanical)

    Trade rough-ins before concealment

  2. 2

    Final Inspection / Certificate of Occupancy Inspection

    Includes the two inspections bundled into the Certificate of Occupancy fee

See the full Dacono inspection guide — scheduling & re-inspection fees →

Tips

  • Commercial projects in Dacono layer multiple per-square-foot impact fees (City Hall Facilities, Regional Park and Trails, Transportation) on top of the standard BVD-based building permit fee and 65% plan review fee — budget for these separately by use type (commercial/industrial/office/warehousing each has a different rate).
  • A Temporary Certificate of Occupancy costs more up front ($225 vs. $125 for a standard CO) and accrues an additional $50/month until the final CO is issued — plan the project schedule to minimize time spent under a temporary CO.

Frequently asked questions

Dacono requires a commercial tenant improvement permit for: Governed by the 2024 IBC as locally adopted; Commercial PV/solar work and other engineered commercial systems require engineer-stamped plans per SAFEbuilt's submittal requirements; Certificate of Occupancy or Temporary Certificate of Occupancy required before commercial occupancy. If your project isn't listed, confirm with City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 before starting work.

In Dacono, the published Building Permit Fee is: Computed from ICC Building Valuation Data / project valuation. Additional published fees: Plan Review Fee — 65% of Permit Fee; Construction Use Tax — 1.5% of total project cost (materials); City Hall Facilities Impact Fee — Commercial — $1.78 per square foot; Transportation Impact Fee — Commercial — $6.33 per square foot; Certificate of Occupancy — $125.00; Temporary Certificate of Occupancy — $225.00 plus $50.00 per month until CO is issued; Site Plan Application Fee — $1,000.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Dacono does not publish a plan-review timeline for this permit. Contact City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 for current turnaround.

You'll need: Building Permit Application (Commercial/Tenant Improvement scope). See the required-documents checklist on this page for details on each.

Dacono requires 2 inspection(s) for a commercial tenant improvement permit, in order: Rough Trades (Electrical/Plumbing/Mechanical), Final Inspection / Certificate of Occupancy Inspection. Schedule each through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) (303-833-2317).

Apply through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 512 Cherry Avenue, Dacono, CO 80514. Phone: 303-833-2317, email: rchavez@daconoco.gov. Office hours: City Hall main line 303-833-2317. Building/code questions directed to SAFEbuilt at 970-545-3512. Inspection scheduling via SAFEbuilt Colorado inspection line 1-888-774-0454, or by emailing windsor@safebuilt.com per the Re-Roof building guide. Primary Community Development contact: Raquel Chavez, Community Development Permit Technician (rchavez@daconoco.gov, 303-833-2317 ext. 128). Community Development Director: Marc Kurbansade, AICP, Deputy City Manager (mkurbansade@daconoco.gov, 303-833-2317).. Official information: https://www.daconoco.gov/875/Building-Codes-Permits.

Dacono, Colorado has adopted: 2024 International Building Code (IBC) — City of Dacono Building Codes page, adopted for all new permit submittals; 2024 International Residential Code (IRC); 2024 International Fuel Gas Code (IFGC); 2024 International Plumbing Code (IPC); 2024 International Mechanical Code (IMC); 2024 International Existing Building Code (IEBC); 2024 International Property Maintenance Code (IPMC); 2024 International Swimming Pool and Spa Code (ISPSC); 2024 International Energy Conservation Code (IECC); 2024 International Fire Code (IFC); 2023 National Electrical Code (NEC); Adopted via Ordinance 1002 (December 17, 2025, effective date of the 2024 code cycle) and subsequently amended by Ordinance 1010 (March 23, 2026); prior code cycle was adopted under Ordinance 949 (October 9, 2023). The City's live Building Codes webpage lists these three ordinances directly beneath the Adopted Codes list.; Colorado HB 1091 (Lofgren & Johnson Families Carbon Monoxide Safety Act) is separately cross-referenced on the City's Building Codes page as an applicable state law requiring carbon monoxide alarms under specified conditions — this is a state statute the City flags for awareness, not a City-adopted model code edition.; HB22-1362 (Colorado statewide energy code/electric- and solar-ready standard, applicable window July 2023-July 2026): Dacono's adoption of the 2024 IECC (effective December 17, 2025, per Ordinance 1002) falls within this window. The City's Building Codes page does not itself cite HB22-1362 or describe the 2024 IECC adoption as an HB22-1362 compliance action — this connection is inferred from the timing and code edition, not confirmed by an explicit City statement, so it is not asserted as a settled fact for any permit-level requirement in this file.. Local amendments apply — see the Dacono overview page for the full list.

Per Ordinance 914 in the 2026 Fee Schedule, commercial projects pay City Hall Facilities Impact Fees ($1.78/sq ft), Regional Park and Trails Impact Fees, and Transportation Impact Fees ($6.33/sq ft for commercial), in addition to the standard BVD-based building permit fee and 65% plan review fee.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dacono building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Dacono.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.