Electrical Permit in Dacono, Colorado

Required for installation, alteration, or repair of electrical systems in Dacono. Governed by the 2023 NEC as adopted. Fees are set under the state-mandated fee schedule (CRS 12-23-117), with the City applying a 1.15 multiplier above the state base rate. The City performs contemporaneous State Electrical Board license verification at application per CRS 12-23-116(10).

Verified 2026-07-06 · Source

When you need this permit

  • Governed by the 2023 NEC as locally adopted
  • Electrician must be registered with the City (registration form emailed to Raquel Chavez, noting whether solar work will be performed) and must hold a current Colorado State Electrical Board license
  • The listed electrician's state license number must appear on the 'electrical only' permit application; the City verifies the license is active via the DORA online lookup before issuing the permit, per CRS 12-23-105 and the City's Electrical License Contemporaneous Review Guidelines
  • If the electrician performing/overseeing the work changes before final inspection, the applicant must notify the City of the new electrician's name and license number for re-verification
  • Supervision ratio: no more than one licensed electrician may supervise more than three apprentices at a jobsite; inspectors may verify this at their discretion at any inspection (CRS 12-23-110.5) Contractor
  • No City electrical contractor-license fee is charged (a copy of the State Master license is required in lieu of a fee)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Residential Electrical Fee — not more than 1,000 sq. ft.2026 Fee Schedule; scaled at 1.15x the current Colorado state fee schedule per CRS 12-23-117. Includes single-family, site-built/modular homes, duplexes, condos, townhouses.
$115.00
Residential Electrical Fee — over 1,000 up to 1,500 sq. ft.
$172.50
Residential Electrical Fee — over 1,500 up to 2,000 sq. ft.
$230.00
Residential Electrical Fee — per 100 sq. ft. in excess of 2,000 sq. ft.
$11.50
All Other Electrical Fee — valuation not more than $2,000
$115.00
All Other Electrical Fee — valuation $2,001 and above
$11.50 base, plus $5.75 per $1,000 (or fraction) of total valuation
Manufactured/Modular Home and Travel Trailer Park (per space)
$115.00
Construction Meter or Re-Inspection
$57.50

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Dacono?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized and verified; inspector may verify electrician identity/licensure at their discretion

See the full Dacono inspection guide — scheduling & re-inspection fees →

Tips

  • Dacono's electrical fee schedule is a direct pass-through of the Colorado-mandated CRS 12-23-117 rates with a 1.15 local multiplier — nearly identical in structure to the maximum 15% surcharge model used by other Colorado home-rule jurisdictions.
  • The City rejects 'electrical only' permit applications outright if the listed electrician's state license cannot be verified as active — confirm your electrician's DORA license status before submitting.

Frequently asked questions

Dacono requires an electrical permit for: Governed by the 2023 NEC as locally adopted; Electrician must be registered with the City (registration form emailed to Raquel Chavez, noting whether solar work will be performed) and must hold a current Colorado State Electrical Board license; The listed electrician's state license number must appear on the 'electrical only' permit application; the City verifies the license is active via the DORA online lookup before issuing the permit, per CRS 12-23-105 and the City's Electrical License Contemporaneous Review Guidelines; If the electrician performing/overseeing the work changes before final inspection, the applicant must notify the City of the new electrician's name and license number for re-verification; Supervision ratio: no more than one licensed electrician may supervise more than three apprentices at a jobsite; inspectors may verify this at their discretion at any inspection (CRS 12-23-110.5); No City electrical contractor-license fee is charged (a copy of the State Master license is required in lieu of a fee). If your project isn't listed, confirm with City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 before starting work.

In Dacono, the published Residential Electrical Fee — not more than 1,000 sq. ft. is: $115.00. Additional published fees: Residential Electrical Fee — over 1,000 up to 1,500 sq. ft. — $172.50; Residential Electrical Fee — over 1,500 up to 2,000 sq. ft. — $230.00; Residential Electrical Fee — per 100 sq. ft. in excess of 2,000 sq. ft. — $11.50; All Other Electrical Fee — valuation not more than $2,000 — $115.00; All Other Electrical Fee — valuation $2,001 and above — $11.50 base, plus $5.75 per $1,000 (or fraction) of total valuation; Manufactured/Modular Home and Travel Trailer Park (per space) — $115.00; Construction Meter or Re-Inspection — $57.50. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Dacono does not publish a plan-review timeline for this permit. Contact City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 for current turnaround.

You'll need: Electrical Permit Application; Electrician Registration Form. See the required-documents checklist on this page for details on each.

Dacono requires 2 inspection(s) for an electrical permit, in order: Rough Electrical, Final Inspection. Schedule each through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) (303-833-2317).

Apply through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 512 Cherry Avenue, Dacono, CO 80514. Phone: 303-833-2317, email: rchavez@daconoco.gov. Office hours: City Hall main line 303-833-2317. Building/code questions directed to SAFEbuilt at 970-545-3512. Inspection scheduling via SAFEbuilt Colorado inspection line 1-888-774-0454, or by emailing windsor@safebuilt.com per the Re-Roof building guide. Primary Community Development contact: Raquel Chavez, Community Development Permit Technician (rchavez@daconoco.gov, 303-833-2317 ext. 128). Community Development Director: Marc Kurbansade, AICP, Deputy City Manager (mkurbansade@daconoco.gov, 303-833-2317).. Official information: https://www.daconoco.gov/875/Building-Codes-Permits.

Dacono, Colorado has adopted: 2024 International Building Code (IBC) — City of Dacono Building Codes page, adopted for all new permit submittals; 2024 International Residential Code (IRC); 2024 International Fuel Gas Code (IFGC); 2024 International Plumbing Code (IPC); 2024 International Mechanical Code (IMC); 2024 International Existing Building Code (IEBC); 2024 International Property Maintenance Code (IPMC); 2024 International Swimming Pool and Spa Code (ISPSC); 2024 International Energy Conservation Code (IECC); 2024 International Fire Code (IFC); 2023 National Electrical Code (NEC); Adopted via Ordinance 1002 (December 17, 2025, effective date of the 2024 code cycle) and subsequently amended by Ordinance 1010 (March 23, 2026); prior code cycle was adopted under Ordinance 949 (October 9, 2023). The City's live Building Codes webpage lists these three ordinances directly beneath the Adopted Codes list.; Colorado HB 1091 (Lofgren & Johnson Families Carbon Monoxide Safety Act) is separately cross-referenced on the City's Building Codes page as an applicable state law requiring carbon monoxide alarms under specified conditions — this is a state statute the City flags for awareness, not a City-adopted model code edition.; HB22-1362 (Colorado statewide energy code/electric- and solar-ready standard, applicable window July 2023-July 2026): Dacono's adoption of the 2024 IECC (effective December 17, 2025, per Ordinance 1002) falls within this window. The City's Building Codes page does not itself cite HB22-1362 or describe the 2024 IECC adoption as an HB22-1362 compliance action — this connection is inferred from the timing and code edition, not confirmed by an explicit City statement, so it is not asserted as a settled fact for any permit-level requirement in this file.. Local amendments apply — see the Dacono overview page for the full list.

Yes. Per the City's Electrical License Contemporaneous Review Guidelines (implementing CRS 12-23-116(10) as amended by HB 2016-1073), the City verifies the listed electrician's Colorado State Electrical Board license is active via the DORA online lookup before issuing an 'electrical only' permit, and may re-verify at final inspection or if the electrician of record changes.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dacono building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.