Electrical Permit — Dacono, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.daconoco.gov/DocumentCenter/View/3684/Electrical-License-Contemporaneous-Review-pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electrical Permit in Dacono, Colorado
Required for installation, alteration, or repair of electrical systems in Dacono. Governed by the 2023 NEC as adopted. Fees are set under the state-mandated fee schedule (CRS 12-23-117), with the City applying a 1.15 multiplier above the state base rate. The City performs contemporaneous State Electrical Board license verification at application per CRS 12-23-116(10).
Verified 2026-07-06 · Source
When you need this permit
- Governed by the 2023 NEC as locally adopted
- Electrician must be registered with the City (registration form emailed to Raquel Chavez, noting whether solar work will be performed) and must hold a current Colorado State Electrical Board license
- The listed electrician's state license number must appear on the 'electrical only' permit application; the City verifies the license is active via the DORA online lookup before issuing the permit, per CRS 12-23-105 and the City's Electrical License Contemporaneous Review Guidelines
- If the electrician performing/overseeing the work changes before final inspection, the applicant must notify the City of the new electrician's name and license number for re-verification
- Supervision ratio: no more than one licensed electrician may supervise more than three apprentices at a jobsite; inspectors may verify this at their discretion at any inspection (CRS 12-23-110.5) Contractor
- No City electrical contractor-license fee is charged (a copy of the State Master license is required in lieu of a fee)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Wiring and panel installed before concealment
- 2
Final Inspection
Devices installed, panel labeled, system energized and verified; inspector may verify electrician identity/licensure at their discretion
See the full Dacono inspection guide — scheduling & re-inspection fees →
Tips
- Dacono's electrical fee schedule is a direct pass-through of the Colorado-mandated CRS 12-23-117 rates with a 1.15 local multiplier — nearly identical in structure to the maximum 15% surcharge model used by other Colorado home-rule jurisdictions.
- The City rejects 'electrical only' permit applications outright if the listed electrician's state license cannot be verified as active — confirm your electrician's DORA license status before submitting.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dacono building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Dacono
Electrical Permit in other cities
Compare electrical permit fees across Colorado →
Look up this fee in a different city →