Skip to main content
PermitBase

Fire Sprinkler and Fire Alarm System Permit in Dacono, Colorado

Colorado is home-rule with no statewide fire code floor, so which authority governs fire sprinkler/alarm work in Dacono had to be independently confirmed rather than assumed. RESEARCHED 2026-08-13: Dacono has NO Town-run fire department -- fire and life-safety plan review, permitting, and inspection are performed directly by Mountain View Fire Rescue (Mountain View Fire Protection District), a special district under Title 32, C.R.S., whose service area includes Dacono (confirmed directly on the District's own live 'Communities We Proudly Serve' page). Dacono's own Ordinance 1010 (adopted on second reading March 23, 2026, read directly) ratifies the District's own October 14, 2025 resolution adopting the 2024 International Fire Code with amendments, and formally designates Mountain View Fire Protection District as the City's fire-code 'Code Compliance Agency.' This entry carries 'verified' confidence: every fact below was read directly from the City's own adopted ordinance or the District's own live application form and fee schedule, not inferred or search-summarized.

Verified 2026-08-13 · Source

When you need this permit

  • Mountain View Fire Protection District ('Mountain View Fire Rescue,' 3561 N. Stagecoach Road, Longmont, CO 80504) is Dacono's fire-code compliance agency -- confirmed directly on Dacono's own Ordinance 1010 (adopted 2nd reading March 23, 2026), which amends Dacono Municipal Code Sec. 18-70/18-73 to state the Fire District 'shall be the code compliance agency' and its Life Safety Division official is 'the fire code official,' and independently confirmed on Mountain View Fire Rescue's own live 'Communities We Proudly Serve' webpage, which names Dacono among its served communities
  • Governed by the 2024 International Fire Code (IFC) with District amendments: Mountain View Fire Protection District's Board of Directors adopted a Resolution on October 14, 2025 adopting/amending the 2024 IFC; Dacono Ordinance 1010 ratifies this by reference, replacing the prior 2018 IFC edition ('Any reference to the Fire Code within this Article shall be to the 2024 Edition of the International Fire Code'), effective from the Ordinance's second reading, March 23, 2026
  • Fire and life-safety plan review, permitting, and inspection for sprinkler and alarm systems are handled DIRECTLY by Mountain View Fire Rescue's Life Safety Division (303-772-0710, prevention@mvfpd.org) -- NOT by the City of Dacono or SAFEbuilt, which administer the separate general Building Permit
  • Application for Plan Review (Mountain View Fire Rescue's own PDF form, read directly) is required for Fire Alarm System work (New/Alteration), Sprinkler System work (New/Alteration/Other, contractor license number required), Hood Extinguishing Systems, Spray Booths, Other Extinguishing Systems, Tank Installation/Removal, plus Site Development, Building & Floor Plans, and Tenant Finish plan review; plans must be submitted in legible electronic format, and all Fire Alarm Test Reports must be on site for Final Approval Contractor
  • The District's own Application for Plan Review form states in bold: 'A MINIMUM OF 10 BUSINESS DAYS IS REQUIRED FOR PLAN REVIEW' -- a published floor, not a guaranteed ceiling
  • Fire protection system (sprinkler, alarm, standpipe) plan review, permit, and inspection fees are assessed at a rate of 0.025 times the total project value (materials and labor), with a $110.00 minimum fee, per Mountain View Fire Rescue's own Life Safety Division Fee Schedule (approved by the District's Board of Directors September 19, 2023)
  • Building-permit-side fire protection plans (stamped by a Colorado-licensed engineer) may separately be required as part of the City/SAFEbuilt Building Permit submittal for the associated construction project when a sprinkler system is part of a project's design -- already documented in this file's residential-building-permit entry; this is a separate requirement from, and in addition to, the District's own fire-code plan review

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fire Protection System Plan Review, Permit, and Inspection FeeMountain View Fire Rescue Life Safety Division Fee Schedule, approved by the Board of Directors September 19, 2023
0.025 x total project value (materials and labor), $110.00 minimum
Any inspection not explicitly listed
$110.00/hour
Fire alarm equipment system malfunction inspectionAssessed for equipment/system malfunctions over three per location (uncorrected within 48 hours) or over ten responses per calendar year
$150.00/alarm
Reinspection of a failed inspection
$165.00/hour, one-hour minimum
Inspections outside normal District business hours
$165.00/hour, two-hour minimum
Work performed without a permitLife Safety Division Fee Schedule, Plan Review and Permit Fees section
50% premium over the normal fee

Review timeline

Plan review
Not published — contact the department

How long did your Fire Sprinkler and Fire Alarm System Permit permit actually take in Dacono?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Fire District Plan Review

    Mountain View Fire Rescue's Life Safety Division reviews fire protection/sprinkler-alarm plans under the 2024 International Fire Code; the District's own form states a minimum of 10 business days is required for this review

  2. 2

    Final Inspection / Fire Alarm Test

    On-site final inspection; all Fire Alarm Test Reports must be on site for Final Approval per the District's Application for Plan Review form

See the full Dacono inspection guide — scheduling & re-inspection fees →

Tips

  • Fire sprinkler/alarm work in Dacono is reviewed entirely outside the City/SAFEbuilt building-permit process -- apply directly to Mountain View Fire Rescue's Life Safety Division (prevention@mvfpd.org, 303-772-0710), and budget for both that District review and any separate City Building Permit needed for the underlying construction.
  • Dacono's own Ordinance 1010 is unusually explicit and current for a small Colorado town in this corpus -- it directly names the Fire District as the 'Code Compliance Agency,' states the exact IFC edition (2024) and effective date (March 23, 2026, on 2nd reading), and even sets a more-stringent-code-applies conflict rule against the IBC/IRC -- so this entry did not need to fall back on an outdated or unconfirmed edition guess the way several peer jurisdictions in this corpus have.
  • Budget on the 0.025 x project-valuation formula with a $110 floor, and plan for at least a 10-business-day plan review turnaround -- the District's own stated figure is a minimum, not a guaranteed maximum.

Frequently asked questions

Dacono requires a fire sprinkler and fire alarm system permit for: Mountain View Fire Protection District ('Mountain View Fire Rescue,' 3561 N. Stagecoach Road, Longmont, CO 80504) is Dacono's fire-code compliance agency -- confirmed directly on Dacono's own Ordinance 1010 (adopted 2nd reading March 23, 2026), which amends Dacono Municipal Code Sec. 18-70/18-73 to state the Fire District 'shall be the code compliance agency' and its Life Safety Division official is 'the fire code official,' and independently confirmed on Mountain View Fire Rescue's own live 'Communities We Proudly Serve' webpage, which names Dacono among its served communities; Governed by the 2024 International Fire Code (IFC) with District amendments: Mountain View Fire Protection District's Board of Directors adopted a Resolution on October 14, 2025 adopting/amending the 2024 IFC; Dacono Ordinance 1010 ratifies this by reference, replacing the prior 2018 IFC edition ('Any reference to the Fire Code within this Article shall be to the 2024 Edition of the International Fire Code'), effective from the Ordinance's second reading, March 23, 2026; Fire and life-safety plan review, permitting, and inspection for sprinkler and alarm systems are handled DIRECTLY by Mountain View Fire Rescue's Life Safety Division (303-772-0710, prevention@mvfpd.org) -- NOT by the City of Dacono or SAFEbuilt, which administer the separate general Building Permit; Application for Plan Review (Mountain View Fire Rescue's own PDF form, read directly) is required for Fire Alarm System work (New/Alteration), Sprinkler System work (New/Alteration/Other, contractor license number required), Hood Extinguishing Systems, Spray Booths, Other Extinguishing Systems, Tank Installation/Removal, plus Site Development, Building & Floor Plans, and Tenant Finish plan review; plans must be submitted in legible electronic format, and all Fire Alarm Test Reports must be on site for Final Approval; The District's own Application for Plan Review form states in bold: 'A MINIMUM OF 10 BUSINESS DAYS IS REQUIRED FOR PLAN REVIEW' -- a published floor, not a guaranteed ceiling; Fire protection system (sprinkler, alarm, standpipe) plan review, permit, and inspection fees are assessed at a rate of 0.025 times the total project value (materials and labor), with a $110.00 minimum fee, per Mountain View Fire Rescue's own Life Safety Division Fee Schedule (approved by the District's Board of Directors September 19, 2023); Building-permit-side fire protection plans (stamped by a Colorado-licensed engineer) may separately be required as part of the City/SAFEbuilt Building Permit submittal for the associated construction project when a sprinkler system is part of a project's design -- already documented in this file's residential-building-permit entry; this is a separate requirement from, and in addition to, the District's own fire-code plan review. If your project isn't listed, confirm with City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 before starting work.

In Dacono, the published Fire Protection System Plan Review, Permit, and Inspection Fee is: 0.025 x total project value (materials and labor), $110.00 minimum. Additional published fees: Any inspection not explicitly listed — $110.00/hour; Fire alarm equipment system malfunction inspection — $150.00/alarm; Reinspection of a failed inspection — $165.00/hour, one-hour minimum; Inspections outside normal District business hours — $165.00/hour, two-hour minimum; Work performed without a permit — 50% premium over the normal fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Dacono does not publish a plan-review timeline for this permit. Contact City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 for current turnaround.

You'll need: Application for Plan Review (Mountain View Fire Rescue); Fire Alarm Test Reports. Depending on your project, Dacono may also ask for: Building Permit Application (City/SAFEbuilt, if part of new construction or a remodel). See the required-documents checklist on this page for details on each.

Dacono requires 2 inspection(s) for a fire sprinkler and fire alarm system permit, in order: Fire District Plan Review, Final Inspection / Fire Alarm Test. Schedule each through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) (303-833-2317).

Apply through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 512 Cherry Avenue, Dacono, CO 80514. Phone: 303-833-2317, email: rchavez@daconoco.gov. Office hours: City Hall main line 303-833-2317. Building/code questions directed to SAFEbuilt at 970-545-3512. Inspection scheduling via SAFEbuilt Colorado inspection line 1-888-774-0454, or by emailing windsor@safebuilt.com per the Re-Roof building guide. Primary Community Development contact: Raquel Chavez, Community Development Permit Technician (rchavez@daconoco.gov, 303-833-2317 ext. 128). Community Development Director: Marc Kurbansade, AICP, Deputy City Manager (mkurbansade@daconoco.gov, 303-833-2317).. Official information: https://www.daconoco.gov/875/Building-Codes-Permits.

No. Fire and life-safety plan review, permitting, and inspection in Dacono are performed directly by Mountain View Fire Rescue's Life Safety Division, a special fire protection district, not by the City or its SAFEbuilt-contracted building department. Dacono's own Ordinance 1010 formally designates the District as the City's fire-code Code Compliance Agency.

The 2024 International Fire Code, as adopted by Mountain View Fire Protection District's Board of Directors on October 14, 2025 and ratified by the City of Dacono via Ordinance 1010, effective on the ordinance's second reading, March 23, 2026.