Rooftop Solar Photovoltaic (PV) Permit in Dacono, Colorado

Required for solar photovoltaic system installation or replacement in Dacono. Governed by the 2023 NEC and 2024 International Codes. SAFEbuilt publishes a regional Photovoltaic System Submittal Requirements document (last revised 10/22/2021) used across its Colorado municipal client jurisdictions, including Dacono.

Verified 2026-07-20 · Source

When you need this permit

  • Applicable codes: 2023 NEC and 2024 International Codes, per SAFEbuilt's Photovoltaic System Submittal Requirements document
  • Permit valuation is based on total contract cost to the customer, including materials and labor
  • Roof-mounted systems require a structural engineer's stamped letter addressing added roof weight and wind load, designed to the letter's stated baseline of 30 psf ground snow load, 115 mph Vult wind speed, wind exposure C, and Seismic Design Category B
  • Ground-mounted systems require a separate engineer-stamped letter for structural support and wind load, using the same design baseline
  • Four-line electrical diagram required showing modules, wire sizes/insulation, conduit, junction boxes, inverter, combiner panel, disconnect, meter, breakers/fuses, and grounding
  • Electrician registration form must note whether solar work will be performed
  • Commercial PV projects require engineer-stamped plans; residential does not unless equipment/attachment details are engineer-specified

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Fee (All Other) — valuation not more than $2,0002026 Fee Schedule; PV installation valuation billed as an 'all other' electrical installation based on total cost, not square footage
$115.00
Electrical Fee (All Other) — per $1,000 of valuation above $2,000
$11.50 base plus $5.75 per $1,000 (or fraction) of total valuation
Statewide aggregate fee cap on active solar energy system installs (reference only — does not currently bind Dacono's own fee)Re-verified 2026-07-20 directly against the City's 11-page 2026 Fee Schedule PDF: for a typical residential rooftop solar install ($15,000-$25,000 valuation), Dacono's own electrical fee formula computes to roughly $97.75-$155.25 ($11.50 + $5.75 per thousand of total valuation) — well under the $500 statutory cap, so the City's own valuation-based fee controls in practice for ordinary residential systems. The statute would only become the binding ceiling above roughly $85,000 of valuation, where the uncapped formula would otherwise exceed $500. No mention of solar, photovoltaic, or HB21-1284 appears anywhere in the 11-page fee schedule.
$500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284)

Review timeline

Plan review
Not published — contact the department

How long did your Rooftop Solar Photovoltaic (PV) Permit permit actually take in Dacono?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before cover

  2. 2

    Final Inspection

    Racking, roof/ground penetrations, and electrical connections verified

See the full Dacono inspection guide — scheduling & re-inspection fees →

Tips

  • SAFEbuilt's Photovoltaic System Submittal Requirements document is a regional template shared across SAFEbuilt's Colorado municipal clients (it contains a visible typo referencing '20203 NEC' and was last revised 10/22/2021) — treat the general submittal checklist as applicable guidance, but confirm any project-specific design values with SAFEbuilt/the City directly rather than assuming the stated 30 psf/115 mph baseline is Dacono's own site-specific design criteria chart.
  • The color red must not be used anywhere on submitted PV plans — SAFEbuilt reserves that color exclusively for plan-reviewer comments.

Frequently asked questions

Dacono requires a rooftop solar photovoltaic (pv) permit for: Applicable codes: 2023 NEC and 2024 International Codes, per SAFEbuilt's Photovoltaic System Submittal Requirements document; Permit valuation is based on total contract cost to the customer, including materials and labor; Roof-mounted systems require a structural engineer's stamped letter addressing added roof weight and wind load, designed to the letter's stated baseline of 30 psf ground snow load, 115 mph Vult wind speed, wind exposure C, and Seismic Design Category B; Ground-mounted systems require a separate engineer-stamped letter for structural support and wind load, using the same design baseline; Four-line electrical diagram required showing modules, wire sizes/insulation, conduit, junction boxes, inverter, combiner panel, disconnect, meter, breakers/fuses, and grounding; Electrician registration form must note whether solar work will be performed; Commercial PV projects require engineer-stamped plans; residential does not unless equipment/attachment details are engineer-specified. If your project isn't listed, confirm with City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 before starting work.

In Dacono, the published Electrical Fee (All Other) — valuation not more than $2,000 is: $115.00. Additional published fees: Electrical Fee (All Other) — per $1,000 of valuation above $2,000 — $11.50 base plus $5.75 per $1,000 (or fraction) of total valuation; Statewide aggregate fee cap on active solar energy system installs (reference only — does not currently bind Dacono's own fee) — $500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Dacono does not publish a plan-review timeline for this permit. Contact City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 for current turnaround.

You'll need: Electrical Permit Application (Solar/PV scope); Structural Engineer Stamped Letter; Four-Line Electrical Diagram. See the required-documents checklist on this page for details on each.

Dacono requires 2 inspection(s) for a rooftop solar photovoltaic (pv) permit, in order: Rough Electrical, Final Inspection. Schedule each through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) (303-833-2317).

Apply through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 512 Cherry Avenue, Dacono, CO 80514. Phone: 303-833-2317, email: rchavez@daconoco.gov. Office hours: City Hall main line 303-833-2317. Building/code questions directed to SAFEbuilt at 970-545-3512. Inspection scheduling via SAFEbuilt Colorado inspection line 1-888-774-0454, or by emailing windsor@safebuilt.com per the Re-Roof building guide. Primary Community Development contact: Raquel Chavez, Community Development Permit Technician (rchavez@daconoco.gov, 303-833-2317 ext. 128). Community Development Director: Marc Kurbansade, AICP, Deputy City Manager (mkurbansade@daconoco.gov, 303-833-2317).. Official information: https://www.daconoco.gov/875/Building-Codes-Permits.

Dacono, Colorado has adopted: 2024 International Building Code (IBC) — City of Dacono Building Codes page, adopted for all new permit submittals; 2024 International Residential Code (IRC); 2024 International Fuel Gas Code (IFGC); 2024 International Plumbing Code (IPC); 2024 International Mechanical Code (IMC); 2024 International Existing Building Code (IEBC); 2024 International Property Maintenance Code (IPMC); 2024 International Swimming Pool and Spa Code (ISPSC); 2024 International Energy Conservation Code (IECC); 2024 International Fire Code (IFC); 2023 National Electrical Code (NEC); Adopted via Ordinance 1002 (December 17, 2025, effective date of the 2024 code cycle) and subsequently amended by Ordinance 1010 (March 23, 2026); prior code cycle was adopted under Ordinance 949 (October 9, 2023). The City's live Building Codes webpage lists these three ordinances directly beneath the Adopted Codes list.; Colorado HB 1091 (Lofgren & Johnson Families Carbon Monoxide Safety Act) is separately cross-referenced on the City's Building Codes page as an applicable state law requiring carbon monoxide alarms under specified conditions — this is a state statute the City flags for awareness, not a City-adopted model code edition.; HB22-1362 (Colorado statewide energy code/electric- and solar-ready standard, applicable window July 2023-July 2026): Dacono's adoption of the 2024 IECC (effective December 17, 2025, per Ordinance 1002) falls within this window. The City's Building Codes page does not itself cite HB22-1362 or describe the 2024 IECC adoption as an HB22-1362 compliance action — this connection is inferred from the timing and code edition, not confirmed by an explicit City statement, so it is not asserted as a settled fact for any permit-level requirement in this file.. Local amendments apply — see the Dacono overview page for the full list.

A structural engineer's stamped letter addressing the added roof or ground-mount weight and wind load of the PV system, per SAFEbuilt's Photovoltaic System Submittal Requirements, plus a four-line electrical diagram of the system.