Sign Permit — Dacono, Colorado · Requirements sheet
Reviewed 2026-08-13 · Source: https://library.municode.com/co/dacono/codes/municipal_code?nodeId=CH16ZO
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Dacono, Colorado
Required for any sign erected, enlarged, modified, or changed within Dacono city limits, per Dacono Municipal Code Chapter 16 (Zoning), Article covering Signs (Sections 16-295 through 16-305). RESEARCHED 2026-08-13: library.municode.com is a JS-only Angular single-page app that returns an empty shell to direct fetch/curl (confirmed directly) and 403'd a direct WebFetch attempt; the section text below was recovered via three separate, mutually corroborating web searches that independently returned the same verbatim procedural language (application-completeness standard, fee basis, one-year lapse, small-sign exemptions), and the fee mechanism was independently cross-checked against the City's own 2026 Fee Schedule PDF (read directly), which contains no standalone sign-permit fee line item -- consistent with the ordinance text that a sign permit's fee is simply the general Building Permit Fee. Because the primary ordinance text itself could not be directly rendered and read by this research pass, this entry carries 'partial' confidence despite the strong cross-corroboration.
Reviewed 2026-08-13 · Source
When you need this permit
- No sign shall be erected, enlarged, modified, or changed within the City without a sign permit first being obtained, per Dacono Municipal Code Chapter 16, Article covering Signs (Sections 16-295 Legislative Declaration through 16-305), as recovered via corroborated search excerpts of the Municode-hosted ordinance text
- The application shall be deemed complete when the application form is completed and all required fees have been paid; the Building Official then reviews and acts upon the request, approving it if the application demonstrates compliance with the Article's standards and all applicable building and safety codes
- The fee for a sign permit is the Building Permit Fee charged for the sign as determined by the currently adopted building and electrical codes (Sec. 16-296) -- i.e., the general BVD-based Building Permit Fee methodology (Section 18-41) already documented in this file's residential-building-permit entry, not a flat sign-specific dollar amount; confirmed indirectly by the absence of any standalone sign fee line in the City's own 2026 Fee Schedule PDF
- A sign permit lapses and has no further effect unless the sign is erected in compliance with the permit's terms and conditions within one (1) year after the date of permit approval
- Permit NOT required for: general temporary signs not exceeding ten (10) square feet in total sign area and five (5) square feet of sign area per face, advertising or identifying property for rent, lease, or sale; political and ideological signs; garage sale signs; and special event signs
- In C-1 or I-1 zone districts, each subdivided lot may have one freestanding temporary tract sign up to 100 square feet in area and 12 feet in height; temporary commercial signs made of paper, canvas, or cloth up to 50 square feet total may be displayed for no more than 90 days within a calendar year, with no more than 50 square feet displayed on a property at any one time
- Permanent sign height in C-1 or I-1 zone districts is capped at 10 feet, or 50 percent of the maximum permitted height for principal buildings in that zoning district, whichever applies, unless approved as part of a Planned Unit Development
- Illuminated/electrical signs additionally require a City Electrical Permit (see this file's electrical-permit entry); the City's own 2026 Fee Schedule separately lists 'Signs' and 'Electrical Signs' as distinct Building Contractor Category C sub-trade license categories ($50.00 each, Municipal Code Section 6-40), confirming signage is a recognized, separately-licensed contractor category in Dacono Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Dacono inspection guide — scheduling & re-inspection fees →
Tips
- Dacono's Municode library page (library.municode.com) is a JavaScript-only Angular application that renders as an empty shell to direct fetch/curl tools and returned a 403 to a direct browser-emulated fetch during this research pass -- the ordinance text in this entry was recovered through corroborated search-engine excerpts rather than a directly-read primary page, which is why this entry carries 'partial' rather than 'verified' confidence despite the consistency of the recovered text across multiple independent searches.
- A sign permit in Dacono has no flat dollar fee of its own -- it is billed as a standard Building Permit Fee (BVD-based, same method used for general construction), so cost varies with the sign's valuation rather than following a fixed sign-specific schedule.
- Illuminated signs need both the Chapter 16 sign permit AND a separate City Electrical Permit -- budget for both processes.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dacono building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Dacono
Sign Permit in other cities
Compare sign permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Dacono project checklist
Describe your project once and get every permit, document, and fee it triggers in Dacono — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →