How to schedule

Inspections are requested through the building department below.

Address
512 Cherry Avenue, Dacono, CO 80514
Phone
303-833-2317
Office hours
City Hall main line 303-833-2317. Building/code questions directed to SAFEbuilt at 970-545-3512. Inspection scheduling via SAFEbuilt Colorado inspection line 1-888-774-0454, or by emailing windsor@safebuilt.com per the Re-Roof building guide. Primary Community Development contact: Raquel Chavez, Community Development Permit Technician (rchavez@daconoco.gov, 303-833-2317 ext. 128). Community Development Director: Marc Kurbansade, AICP, Deputy City Manager (mkurbansade@daconoco.gov, 303-833-2317).

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation

    Before concrete pour

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans and applicable codes

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Foundation / Framing / Rough Trades

    Standard residential construction inspection sequence, as applicable to the ADU's scope (new detached structure vs. conversion of existing space)

  2. 2

    ADU Certification of Exception Inspection

    A distinct, separately fee'd inspection type per the 2026 Fee Schedule; the specific compliance standard it certifies against was not located in the publicly posted materials reviewed

  3. 3

    Final Inspection

    All work complete per approved plans

Applies to: Deck / Covered Patio / Carport Permit

  1. 1

    Footing/Foundation

    Before concrete pour, for decks/carports with new footings

  2. 2

    Framing

    Structural framing and ledger-board attachment (for decks) before cover

  3. 3

    Final Inspection

    All work complete per approved plans

Applies to: Residential Addition / Basement Finish / Remodel Permit

  1. 1

    Foundation (additions with new footings only)

    Before concrete pour

  2. 2

    Rough Frame / Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  3. 3

    Final Inspection

    All work complete per approved plans

Applies to: Commercial Tenant Improvement Permit

  1. 1

    Rough Trades (Electrical/Plumbing/Mechanical)

    Trade rough-ins before concealment

  2. 2

    Final Inspection / Certificate of Occupancy Inspection

    Includes the two inspections bundled into the Certificate of Occupancy fee

Applies to: Electric Vehicle Charging Station Permit

  1. 1

    Rough Electrical

    New circuit/wiring for the charger installed before concealment (if applicable)

  2. 2

    Final Inspection

    Charger installed and connected, circuit verified, system energized; inspector may verify electrician identity/licensure at their discretion

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized and verified; inspector may verify electrician identity/licensure at their discretion

Applies to: Fire Sprinkler and Fire Alarm System Permit

  1. 1

    Fire District Plan Review

    Mountain View Fire Rescue's Life Safety Division reviews fire protection, sprinkler and alarm plans under the 2024 International Fire Code; the District's own form states a minimum of 10 business days is required for this review.

  2. 2

    Final Inspection / Fire Alarm Test

    On-site final inspection; all Fire Alarm Test Reports must be on site for Final Approval per the District's Application for Plan Review form

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

Applies to: Rooftop Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before cover

  2. 2

    Final Inspection

    Racking, roof/ground penetrations, and electrical connections verified

Re-inspection fees

Residential Building Permit (New Construction)Reinspection Fee · 2026 Fee Schedule, Other Inspection and Plan Review Fees — Reinspection, per inspection
$50.00 per inspection
Electrical PermitConstruction Meter or Re-Inspection · 2026 Fee Schedule, Electrical Fees — Miscellaneous Electrical, construction meter or re-inspection on any of the above
$57.50
Electric Vehicle Charging Station PermitConstruction Meter or Re-Inspection · 2026 Fee Schedule, Electrical Fees — Miscellaneous Electrical, construction meter or re-inspection on any of the above
$57.50
Fire Sprinkler and Fire Alarm System PermitReinspection of a failed inspection · Mountain View Fire Rescue Life Safety Division Fee Schedule, Inspection Service Billing Rates — minimum one-hour charge per inspector
$165.00/hour, one-hour minimum

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dacono building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Dacono building permits

Get alerts for Dacono

We'll email you when Dacono's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.