Accessory Dwelling Unit (ADU) Permit — Dacono, Colorado · Requirements sheet
Reviewed 2026-07-06 · Source: https://www.daconoco.gov/DocumentCenter/View/6556/2026-Fee-Schedule-pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) Permit in Dacono, Colorado
Dacono's 2026 Fee Schedule includes a specific 'Accessory Dwelling Unit (ADU) Certification of Exception Inspection' fee ($100, includes two inspections), confirming ADUs are a recognized project type, but the City does not publish a dedicated ADU-specific submittal guide, zoning standard, or standalone ADU ordinance page distinct from its general Building Codes and Zoning materials as of this review.
Reviewed 2026-07-06 · Source
When you need this permit
- ADUs are permitted and inspected under the general 2024 IRC/IBC framework as locally adopted; no dedicated ADU-specific SAFEbuilt homeowner guide was found (unlike Re-Roof, Home Additions, Accessory Structures, etc., which each have their own guide)
- An 'ADU Certification of Exception Inspection' ($100, includes two inspections) is a distinct, separately-fee'd inspection type per the 2026 Fee Schedule, suggesting a defined municipal process exists for ADU compliance certification, though the underlying ordinance/standard was not located during this review
- Zoning compliance (setbacks, lot coverage, use-by-zone-district) must be separately confirmed with the Community Development Department / Zoning Map, as ADU siting is a zoning matter distinct from building-permit plan review
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Framing / Rough Trades
Standard residential construction inspection sequence, as applicable to the ADU's scope (new detached structure vs. conversion of existing space)
- 2
ADU Certification of Exception Inspection
A distinct, separately fee'd inspection type per the 2026 Fee Schedule; the specific compliance standard it certifies against was not located in the publicly posted materials reviewed
- 3
Final Inspection
All work complete per approved plans
See the full Dacono inspection guide — scheduling & re-inspection fees →
Tips
- Because Dacono has not published a dedicated ADU guide or ordinance excerpt (unlike its detailed SAFEbuilt guides for re-roofs, additions, decks, pools, etc.), contact the Community Development Department (303-833-2317) directly early in planning to confirm current ADU zoning eligibility, size limits, and what the 'Certification of Exception Inspection' specifically verifies before assuming standard single-family requirements apply unmodified.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dacono building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Dacono
Accessory Dwelling Unit (ADU) Permit in other cities
Compare accessory dwelling unit (adu) permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Dacono project checklist
Describe your project once and get every permit, document, and fee it triggers in Dacono — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →