Accessory Dwelling Unit (ADU) Permit in Dacono, Colorado

Dacono's 2026 Fee Schedule includes a specific 'Accessory Dwelling Unit (ADU) Certification of Exception Inspection' fee ($100, includes two inspections), confirming ADUs are a recognized project type, but the City does not publish a dedicated ADU-specific submittal guide, zoning standard, or standalone ADU ordinance page distinct from its general Building Codes and Zoning materials as of this review.

Reviewed 2026-07-06 · Source

When you need this permit

  • ADUs are permitted and inspected under the general 2024 IRC/IBC framework as locally adopted; no dedicated ADU-specific SAFEbuilt homeowner guide was found (unlike Re-Roof, Home Additions, Accessory Structures, etc., which each have their own guide)
  • An 'ADU Certification of Exception Inspection' ($100, includes two inspections) is a distinct, separately-fee'd inspection type per the 2026 Fee Schedule, suggesting a defined municipal process exists for ADU compliance certification, though the underlying ordinance/standard was not located during this review
  • Zoning compliance (setbacks, lot coverage, use-by-zone-district) must be separately confirmed with the Community Development Department / Zoning Map, as ADU siting is a zoning matter distinct from building-permit plan review

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Accessory Dwelling Unit (ADU) Certification of Exception InspectionIncludes two inspections; 2026 Fee Schedule, Other Inspection and Plan Review Fees section
$100.00
Building Permit Fee
Computed from ICC Building Valuation Data / project valuation, same general method as other new construction/additions
Plan Review Fee
65% of Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Accessory Dwelling Unit (ADU) Permit permit actually take in Dacono?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation / Framing / Rough Trades

    Standard residential construction inspection sequence, as applicable to the ADU's scope (new detached structure vs. conversion of existing space)

  2. 2

    ADU Certification of Exception Inspection

    A distinct, separately fee'd inspection type per the 2026 Fee Schedule; the specific compliance standard it certifies against was not located in the publicly posted materials reviewed

  3. 3

    Final Inspection

    All work complete per approved plans

See the full Dacono inspection guide — scheduling & re-inspection fees →

Tips

  • Because Dacono has not published a dedicated ADU guide or ordinance excerpt (unlike its detailed SAFEbuilt guides for re-roofs, additions, decks, pools, etc.), contact the Community Development Department (303-833-2317) directly early in planning to confirm current ADU zoning eligibility, size limits, and what the 'Certification of Exception Inspection' specifically verifies before assuming standard single-family requirements apply unmodified.

Frequently asked questions

Dacono requires an accessory dwelling unit (adu) permit for: ADUs are permitted and inspected under the general 2024 IRC/IBC framework as locally adopted; no dedicated ADU-specific SAFEbuilt homeowner guide was found (unlike Re-Roof, Home Additions, Accessory Structures, etc., which each have their own guide); An 'ADU Certification of Exception Inspection' ($100, includes two inspections) is a distinct, separately-fee'd inspection type per the 2026 Fee Schedule, suggesting a defined municipal process exists for ADU compliance certification, though the underlying ordinance/standard was not located during this review; Zoning compliance (setbacks, lot coverage, use-by-zone-district) must be separately confirmed with the Community Development Department / Zoning Map, as ADU siting is a zoning matter distinct from building-permit plan review. If your project isn't listed, confirm with City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 before starting work.

In Dacono, the published Accessory Dwelling Unit (ADU) Certification of Exception Inspection is: $100.00. Additional published fees: Building Permit Fee — Computed from ICC Building Valuation Data / project valuation, same general method as other new construction/additions; Plan Review Fee — 65% of Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Dacono does not publish a plan-review timeline for this permit. Contact City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Dacono requires 3 inspection(s) for an accessory dwelling unit (adu) permit, in order: Foundation / Framing / Rough Trades, ADU Certification of Exception Inspection, Final Inspection. Schedule each through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) (303-833-2317).

Apply through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 512 Cherry Avenue, Dacono, CO 80514. Phone: 303-833-2317, email: rchavez@daconoco.gov. Office hours: City Hall main line 303-833-2317. Building/code questions directed to SAFEbuilt at 970-545-3512. Inspection scheduling via SAFEbuilt Colorado inspection line 1-888-774-0454, or by emailing windsor@safebuilt.com per the Re-Roof building guide. Primary Community Development contact: Raquel Chavez, Community Development Permit Technician (rchavez@daconoco.gov, 303-833-2317 ext. 128). Community Development Director: Marc Kurbansade, AICP, Deputy City Manager (mkurbansade@daconoco.gov, 303-833-2317).. Official information: https://www.daconoco.gov/875/Building-Codes-Permits.

Dacono, Colorado has adopted: 2024 International Building Code (IBC) — City of Dacono Building Codes page, adopted for all new permit submittals; 2024 International Residential Code (IRC); 2024 International Fuel Gas Code (IFGC); 2024 International Plumbing Code (IPC); 2024 International Mechanical Code (IMC); 2024 International Existing Building Code (IEBC); 2024 International Property Maintenance Code (IPMC); 2024 International Swimming Pool and Spa Code (ISPSC); 2024 International Energy Conservation Code (IECC); 2024 International Fire Code (IFC); 2023 National Electrical Code (NEC); Adopted via Ordinance 1002 (December 17, 2025, effective date of the 2024 code cycle) and subsequently amended by Ordinance 1010 (March 23, 2026); prior code cycle was adopted under Ordinance 949 (October 9, 2023). The City's live Building Codes webpage lists these three ordinances directly beneath the Adopted Codes list.; Colorado HB 1091 (Lofgren & Johnson Families Carbon Monoxide Safety Act) is separately cross-referenced on the City's Building Codes page as an applicable state law requiring carbon monoxide alarms under specified conditions — this is a state statute the City flags for awareness, not a City-adopted model code edition.; HB22-1362 (Colorado statewide energy code/electric- and solar-ready standard, applicable window July 2023-July 2026): Dacono's adoption of the 2024 IECC (effective December 17, 2025, per Ordinance 1002) falls within this window. The City's Building Codes page does not itself cite HB22-1362 or describe the 2024 IECC adoption as an HB22-1362 compliance action — this connection is inferred from the timing and code edition, not confirmed by an explicit City statement, so it is not asserted as a settled fact for any permit-level requirement in this file.. Local amendments apply — see the Dacono overview page for the full list.

The City's 2026 Fee Schedule includes a specific ADU-related inspection fee (Certification of Exception Inspection, $100, two inspections), indicating ADUs are a recognized permit scenario, but no dedicated ADU ordinance, zoning standard, or SAFEbuilt submittal guide was found publicly posted as of this review — confirm current requirements directly with Community Development before proceeding.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dacono building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.