Residential Building Permit (New Construction) in Dacono, Colorado

Required for new single-family and duplex construction in the City of Dacono. Reviewed under the 2024 IRC/IBC as locally adopted (Ordinance 1002/1010) by SAFEbuilt, Inc. on the City's behalf. Building permit fees are based on ICC Building Valuation Data.

Verified 2026-07-06 · Source

When you need this permit

  • Plans reviewed under the 2024 IRC/IBC as locally adopted
  • Permit application (Community Core online portal) with complete description of work and total project valuation (contract price including material and labor)
  • General Building Contractor Category A license required for the general contractor ($150, City of Dacono, Municipal Code Section 6-40)
  • Sub-trade contractors (electrical, plumbing per Category B, and any Category C specialty trades) must separately hold current City contractor licenses AND applicable Colorado state trade licenses Contractor
  • Electrical work requires a City-registered electrician holding a current Colorado State Electrical Board license, contemporaneously verified by the City at permit application (CRS 12-23-105, 12-23-116(10))
  • Plumbing work requires a City Category B contractor license holder who also holds a current Colorado State Plumbing Board (DORA) license, contemporaneously verified by the City as a registered Inspecting Entity under HB19-1086 Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee2026 Fee Schedule, Municipal Code Section 18-41
Computed by the Building Official using the ICC Building Safety Journal's Building Valuation Data (BVD), updated bi-annually each August and February
Plan Review FeeCollected at time of permit submittal
65% of the computed Building Permit Fee
Construction Use Tax2026 Fee Schedule
1.5% of total project cost (materials)
Late Payment Administrative FeeAssessed if building permit fees are not paid in full within 15 days of approval
$50.00
Certificate of OccupancyIncludes two inspections; 2026 Fee Schedule, Development Fees
$125.00
Reinspection Fee
$50.00 per inspection

Review timeline

Plan review
Not published — contact the department

How long did your Residential Building Permit (New Construction) permit actually take in Dacono?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Before concrete pour

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans and applicable codes

See the full Dacono inspection guide — scheduling & re-inspection fees →

Tips

  • SAFEbuilt, Inc. performs plan review and inspections on the City's behalf; general building-code questions should go to SAFEbuilt (970-545-3512), while permit administration and account questions go to the City's Permit Technician Raquel Chavez (303-833-2317 ext. 128).
  • Confirm which water utility serves your parcel before budgeting — City of Dacono tap fees are far lower than Central Weld County Water District tap fees for the same meter size.
  • Mountain View Fire Protection District fire-code plan review and St. Vrain Sanitation District sewer-tap matters are handled directly by those districts, not by the City/SAFEbuilt, and carry their own separate fees.

Frequently asked questions

Dacono requires a residential building permit (new construction) for: Plans reviewed under the 2024 IRC/IBC as locally adopted; Permit application (Community Core online portal) with complete description of work and total project valuation (contract price including material and labor); General Building Contractor Category A license required for the general contractor ($150, City of Dacono, Municipal Code Section 6-40); Sub-trade contractors (electrical, plumbing per Category B, and any Category C specialty trades) must separately hold current City contractor licenses AND applicable Colorado state trade licenses; Electrical work requires a City-registered electrician holding a current Colorado State Electrical Board license, contemporaneously verified by the City at permit application (CRS 12-23-105, 12-23-116(10)); Plumbing work requires a City Category B contractor license holder who also holds a current Colorado State Plumbing Board (DORA) license, contemporaneously verified by the City as a registered Inspecting Entity under HB19-1086. If your project isn't listed, confirm with City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 before starting work.

In Dacono, the published Building Permit Fee is: Computed by the Building Official using the ICC Building Safety Journal's Building Valuation Data (BVD), updated bi-annually each August and February. Additional published fees: Plan Review Fee — 65% of the computed Building Permit Fee; Construction Use Tax — 1.5% of total project cost (materials); Late Payment Administrative Fee — $50.00; Certificate of Occupancy — $125.00; Reinspection Fee — $50.00 per inspection. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Dacono does not publish a plan-review timeline for this permit. Contact City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 for current turnaround.

You'll need: Building Permit Application; Construction Plans (site plan, floor plan, construction details). See the required-documents checklist on this page for details on each.

Dacono requires 4 inspection(s) for a residential building permit (new construction), in order: Foundation, Framing, Rough Electrical / Plumbing / Mechanical, Final Inspection. Schedule each through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) (303-833-2317).

Apply through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 512 Cherry Avenue, Dacono, CO 80514. Phone: 303-833-2317, email: rchavez@daconoco.gov. Office hours: City Hall main line 303-833-2317. Building/code questions directed to SAFEbuilt at 970-545-3512. Inspection scheduling via SAFEbuilt Colorado inspection line 1-888-774-0454, or by emailing windsor@safebuilt.com per the Re-Roof building guide. Primary Community Development contact: Raquel Chavez, Community Development Permit Technician (rchavez@daconoco.gov, 303-833-2317 ext. 128). Community Development Director: Marc Kurbansade, AICP, Deputy City Manager (mkurbansade@daconoco.gov, 303-833-2317).. Official information: https://www.daconoco.gov/875/Building-Codes-Permits.

The City of Dacono issues its own building permits as a home-rule city, but plan review and inspections are performed under contract by SAFEbuilt, Inc. since June 1, 2016. The City's Permit Technician (Raquel Chavez) handles permit administration; SAFEbuilt (970-545-3512) handles code/plan-review questions.

Fees are based on the ICC Building Safety Journal's Building Valuation Data (BVD), which is updated twice a year (August and February). Plan Review is an additional 65% of the computed building permit fee, and a 1.5% construction use tax applies to the value of materials.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dacono building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.