Residential Building Permit (New Construction) in Dacono, Colorado
Required for new single-family and duplex construction in the City of Dacono. Reviewed under the 2024 IRC/IBC as locally adopted (Ordinance 1002/1010) by SAFEbuilt, Inc. on the City's behalf. Building permit fees are based on ICC Building Valuation Data.
Verified 2026-07-06 · Source
When you need this permit
- Plans reviewed under the 2024 IRC/IBC as locally adopted
- Permit application (Community Core online portal) with complete description of work and total project valuation (contract price including material and labor)
- General Building Contractor Category A license required for the general contractor ($150, City of Dacono, Municipal Code Section 6-40)
- Sub-trade contractors (electrical, plumbing per Category B, and any Category C specialty trades) must separately hold current City contractor licenses AND applicable Colorado state trade licenses Contractor
- Electrical work requires a City-registered electrician holding a current Colorado State Electrical Board license, contemporaneously verified by the City at permit application (CRS 12-23-105, 12-23-116(10))
- Plumbing work requires a City Category B contractor license holder who also holds a current Colorado State Plumbing Board (DORA) license, contemporaneously verified by the City as a registered Inspecting Entity under HB19-1086 Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation
Before concrete pour
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans and applicable codes
See the full Dacono inspection guide — scheduling & re-inspection fees →
Tips
- SAFEbuilt, Inc. performs plan review and inspections on the City's behalf; general building-code questions should go to SAFEbuilt (970-545-3512), while permit administration and account questions go to the City's Permit Technician Raquel Chavez (303-833-2317 ext. 128).
- Confirm which water utility serves your parcel before budgeting — City of Dacono tap fees are far lower than Central Weld County Water District tap fees for the same meter size.
- Mountain View Fire Protection District fire-code plan review and St. Vrain Sanitation District sewer-tap matters are handled directly by those districts, not by the City/SAFEbuilt, and carry their own separate fees.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dacono building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Dacono
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Dacono project checklist
Describe your project once and get every permit, document, and fee it triggers in Dacono — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →