Mechanical / HVAC Permit in Dacono, Colorado

Required for heating, cooling, ventilation, and fuel-gas equipment installation or replacement in Dacono. Governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC) as adopted.

Verified 2026-07-06 · Source

When you need this permit

  • Governed by the 2024 IMC and 2024 IFGC as locally adopted
  • Contractors performing mechanical work must hold applicable City contractor licenses (Category B covers 'Hot Water'; Category C covers 'Temperature Controls') and any required Colorado state trade licensure Contractor
  • Mechanical plans required as part of the permit submittal for new construction, additions, and remodel scopes

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Mechanical Permit Fee2026 Fee Schedule; no separate stand-alone mechanical fee table is published
Computed from ICC Building Valuation Data / project valuation, same general schedule basis as Building
Plan Review Fee
65% of Permit Fee
Construction Use Tax
1.5% of total project cost (materials)
Building Contractor Category B License (Hot Water sub-trade)
$100.00

Review timeline

Plan review
Not published — contact the department

How long did your Mechanical / HVAC Permit permit actually take in Dacono?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

See the full Dacono inspection guide — scheduling & re-inspection fees →

Tips

  • Mechanical permit fees in Dacono follow the same Building Valuation Data-based approach as general building permits — there is no separate flat mechanical fee table published in the 2026 Fee Schedule.

Frequently asked questions

Dacono requires a mechanical / hvac permit for: Governed by the 2024 IMC and 2024 IFGC as locally adopted; Contractors performing mechanical work must hold applicable City contractor licenses (Category B covers 'Hot Water'; Category C covers 'Temperature Controls') and any required Colorado state trade licensure; Mechanical plans required as part of the permit submittal for new construction, additions, and remodel scopes. If your project isn't listed, confirm with City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 before starting work.

In Dacono, the published Mechanical Permit Fee is: Computed from ICC Building Valuation Data / project valuation, same general schedule basis as Building. Additional published fees: Plan Review Fee — 65% of Permit Fee; Construction Use Tax — 1.5% of total project cost (materials); Building Contractor Category B License (Hot Water sub-trade) — $100.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Dacono does not publish a plan-review timeline for this permit. Contact City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 303-833-2317 for current turnaround.

You'll need: Building Permit Application (Mechanical scope). See the required-documents checklist on this page for details on each.

Dacono requires 2 inspection(s) for a mechanical / hvac permit, in order: Rough Mechanical, Final Inspection. Schedule each through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) (303-833-2317).

Apply through City of Dacono Community Development Department (building permitting/inspections administered by SAFEbuilt, Inc., the City's contracted third-party building department partner) at 512 Cherry Avenue, Dacono, CO 80514. Phone: 303-833-2317, email: rchavez@daconoco.gov. Office hours: City Hall main line 303-833-2317. Building/code questions directed to SAFEbuilt at 970-545-3512. Inspection scheduling via SAFEbuilt Colorado inspection line 1-888-774-0454, or by emailing windsor@safebuilt.com per the Re-Roof building guide. Primary Community Development contact: Raquel Chavez, Community Development Permit Technician (rchavez@daconoco.gov, 303-833-2317 ext. 128). Community Development Director: Marc Kurbansade, AICP, Deputy City Manager (mkurbansade@daconoco.gov, 303-833-2317).. Official information: https://www.daconoco.gov/875/Building-Codes-Permits.

Dacono, Colorado has adopted: 2024 International Building Code (IBC) — City of Dacono Building Codes page, adopted for all new permit submittals; 2024 International Residential Code (IRC); 2024 International Fuel Gas Code (IFGC); 2024 International Plumbing Code (IPC); 2024 International Mechanical Code (IMC); 2024 International Existing Building Code (IEBC); 2024 International Property Maintenance Code (IPMC); 2024 International Swimming Pool and Spa Code (ISPSC); 2024 International Energy Conservation Code (IECC); 2024 International Fire Code (IFC); 2023 National Electrical Code (NEC); Adopted via Ordinance 1002 (December 17, 2025, effective date of the 2024 code cycle) and subsequently amended by Ordinance 1010 (March 23, 2026); prior code cycle was adopted under Ordinance 949 (October 9, 2023). The City's live Building Codes webpage lists these three ordinances directly beneath the Adopted Codes list.; Colorado HB 1091 (Lofgren & Johnson Families Carbon Monoxide Safety Act) is separately cross-referenced on the City's Building Codes page as an applicable state law requiring carbon monoxide alarms under specified conditions — this is a state statute the City flags for awareness, not a City-adopted model code edition.; HB22-1362 (Colorado statewide energy code/electric- and solar-ready standard, applicable window July 2023-July 2026): Dacono's adoption of the 2024 IECC (effective December 17, 2025, per Ordinance 1002) falls within this window. The City's Building Codes page does not itself cite HB22-1362 or describe the 2024 IECC adoption as an HB22-1362 compliance action — this connection is inferred from the timing and code edition, not confirmed by an explicit City statement, so it is not asserted as a settled fact for any permit-level requirement in this file.. Local amendments apply — see the Dacono overview page for the full list.

The 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC), both adopted effective December 17, 2025 under Ordinance 1002 and subsequently amended by Ordinance 1010 (March 23, 2026).

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dacono building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.