Accessory Dwelling Unit (ADU) Permit — Cripple Creek, Colorado · Requirements sheet
Reviewed 2026-07-06 · Source: https://www.cityofcripplecreek.com/sites/g/files/vyhlif14956/files/media/planning-community-development/file/4001/2025%20CC-Development-Code.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) Permit in Cripple Creek, Colorado
Required for construction of an Accessory Dwelling Unit in Cripple Creek. ADUs are an explicitly permitted accessory use under the City's 2025 Development Code (Section 1.5.12, amended by Ordinance 2025-06), consistent with Colorado's statewide ADU-legalization push (HB24-1152).
Reviewed 2026-07-06 · Source
When you need this permit
- Maximum of one ADU per primary structure
- ADU square footage capped at 750 sq ft or 50% of the primary structure's square footage, whichever is larger
- Front and side setbacks must match the primary structure; rear setback is 5 feet (with or without a rear lane per the Development Code table)
- Detached ADU requires a minimum of 1 story above a basement story; maximum height may not exceed the primary structure's height (measured from finished grade to the highest roof point)
- An off-street parking space is generally required per ADU, subject to exceptions tied to on-street parking availability and pre-January-1-2024 zoning district requirements per Development Code Table 1.7(3)(f)
- Standard building/electrical/plumbing/mechanical permit review applies per the applicable adopted codes (2018 IRC/IBC etc.)
- Certificate of Appropriateness required if the ADU is located within a designated Historic District
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation
Before concrete pour, if a new foundation is required
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans and Development Code ADU standards
See the full Cripple Creek inspection guide — scheduling & re-inspection fees →
Tips
- Cripple Creek's ADU size cap is 750 sq ft OR 50% of the primary structure's square footage, whichever is LARGER — a larger primary home therefore unlocks a larger allowable ADU beyond the flat 750 sq ft baseline.
- Check the Development Code's off-street parking exceptions carefully (Table 1.7(3)(f)) — whether a dedicated parking space is required for your ADU depends on your zoning district's pre-2024 requirements and on-street parking availability on your block.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cripple Creek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cripple Creek
Accessory Dwelling Unit (ADU) Permit in other cities
Compare accessory dwelling unit (adu) permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Cripple Creek project checklist
Describe your project once and get every permit, document, and fee it triggers in Cripple Creek — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →