Electric Vehicle Charging Station Permit — Cripple Creek, Colorado · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.cityofcripplecreek.com/building-department/page/contemporaneous-review-electrical-and-plumbing-licenses
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle Charging Station Permit in Cripple Creek, Colorado
The City of Cripple Creek does not publish a standalone EV charger/EVSE permit application, fee line, or webpage -- checked the Building Department page, the Contemporaneous Review of Electrical and Plumbing Licenses page, the Permits/Inspections/Contractors Licensing Information page, and Municipal Code Ch. 18 Art. 11 (National Electrical Code) directly; none name electric vehicle charging stations, EV chargers, or EVSE. Installing an EV charger is electrical work and is processed as a standard Electrical Permit under the most current NEC edition as adopted by the State of Colorado (Ch. 18, Art. 11), the same permit type and mechanism documented in this file's electrical-permit entry, including reliance on Colorado State Electrical Board (DORA) licensure for the installing electrician rather than a City-run electrical licensing program. Re-chased exhaustively 2026-07-20 (see sources[] for every avenue checked): the City self-administers this permit locally through its third-party plan-review/permitting vendor SAFEbuilt via the CommunityCore portal, and the electrical permit fee is set by City Council resolution rather than published in Municipal Code, on the City's own pages, or on SAFEbuilt's public site -- no numeric fee table was located after directly checking every public page and portal identified, so this is NOT a case of routing to a state-administered permit (unlike jurisdictions where the State Electrical Board itself issues the permit); Colorado's CRS 12-23-117(3) statutory ceiling (local electrical inspection fees may not exceed 115% of the State Electrical Board's own fee table) legally bounds whatever resolution figure Cripple Creek uses, but does not itself supply Cripple Creek's actual fee.
Reviewed 2026-07-20 · Source
When you need this permit
- Governed by the most current NEC edition as adopted by the State of Colorado (Cripple Creek Municipal Code Ch. 18, Art. 11 floats to the state-adopted edition), including NEC Article 625 (Electric Vehicle Power Transfer System)
- Electricians must hold a current Colorado State electrician license or be a registered apprentice per CRS 12-23-101 definitions; City Building Inspectors are authorized and required by state law to perform random reviews of these licenses on job sites
- No City of Cripple Creek EV-charger-specific permit application exists; use the standard Electrical Permit Application
- If the property is within the Bennett Avenue Historic District, a Certificate of Appropriateness from the Historic Preservation Commission may be required before permit issuance if the charger installation is visible from a public right-of-way or affects the exterior of a historic structure
- Electrical permit fees are set 'in an amount as adopted by resolution,' the same mechanism documented in this file's electrical-permit entry -- no distinct EV-specific fee line was found
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
New circuit/wiring for the charger installed before concealment
- 2
Final Inspection
Charger installed and connected, circuit verified before energizing
See the full Cripple Creek inspection guide — scheduling & re-inspection fees →
Tips
- There is no separate 'EV charger permit' in Cripple Creek -- it is processed as a standard Electrical Permit, the same as any other electrical work, under state-anchored (DORA) electrician licensure rather than a City-run program.
- If your property sits within the Bennett Avenue Historic District, check whether the charger's visible components (conduit runs, wall-mounted units) trigger the Historic Preservation Commission's Certificate of Appropriateness review before starting work.
- The exact electrical permit fee is set by City Council resolution and is not published online (checked CommunityCore, SAFEbuilt, Municode, and every City Building Department page) -- call the Building Department at 719-689-3588 ext. 1 for a current quote before budgeting.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cripple Creek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cripple Creek
Electric Vehicle Charging Station Permit in other cities
Compare electric vehicle charging station permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Cripple Creek project checklist
Describe your project once and get every permit, document, and fee it triggers in Cripple Creek — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →