Electric Vehicle Charging Station Permit in Cripple Creek, Colorado
The City of Cripple Creek does not publish a standalone EV charger/EVSE permit application, fee line, or webpage -- neither the Building Department page, the Contemporaneous Review of Electrical and Plumbing Licenses page, the Permits/Inspections/Contractors Licensing Information page, nor Municipal Code Ch. 18 Art. 11 (National Electrical Code) names electric vehicle charging stations, EV chargers, or EVSE. Installing an EV charger is electrical work and is processed as a standard Electrical Permit under the most current NEC edition as adopted by the State of Colorado (Ch. 18, Art. 11), the same permit type and mechanism documented in the electrical-permit entry, including reliance on Colorado State Electrical Board (DORA) licensure for the installing electrician rather than a City-run electrical licensing program. The City self-administers this permit locally through its third-party plan-review/permitting vendor SAFEbuilt via the CommunityCore portal, and the electrical permit fee is set by City Council resolution rather than published in Municipal Code, on the City's own pages, or on SAFEbuilt's public site -- no numeric fee table is publicly available (see sources[] for the pages and portals covered). This is NOT a case of routing to a state-administered permit (unlike jurisdictions where the State Electrical Board itself issues the permit); Colorado's CRS 12-23-117(3) statutory ceiling (local electrical inspection fees may not exceed 115% of the State Electrical Board's own fee table) legally bounds whatever resolution figure Cripple Creek uses, but does not itself supply Cripple Creek's actual fee.
Reviewed 2026-07-20 · Source
When you need this permit
- Governed by the most current NEC edition as adopted by the State of Colorado (Cripple Creek Municipal Code Ch. 18, Art. 11 floats to the state-adopted edition), including NEC Article 625 (Electric Vehicle Power Transfer System)
- Electricians must hold a current Colorado State electrician license or be a registered apprentice per CRS 12-23-101 definitions; City Building Inspectors are authorized and required by state law to perform random reviews of these licenses on job sites
- No City of Cripple Creek EV-charger-specific permit application exists; use the standard Electrical Permit Application
- If the property is within the Bennett Avenue Historic District, a Certificate of Appropriateness from the Historic Preservation Commission may be required before permit issuance if the charger installation is visible from a public right-of-way or affects the exterior of a historic structure
- Electrical permit fees are set 'in an amount as adopted by resolution,' the same mechanism documented in the electrical-permit entry -- no distinct EV-specific fee line was found
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Set by City Council resolution, the same mechanism as the electrical-permit entry. Show full citationHide
Set by City Council resolution, the same mechanism as the electrical-permit entry. No numeric fee table or EV-specific fee line is published anywhere: not on the City's Building Department page, Contemporaneous Review page, Permits/Inspections/Contractors Licensing page, Finance Department page, City Clerk page, or 2026 Budget page (a docaccess.com-embedded viewer with no apparent fee-schedule PDF); not in Municode Ch. 18 (fees are not codified there — the text points to a resolution) or Municode Chapter 4 (Revenue and Finance — tax articles only, no building fee schedule); and not in Municode's MuniDocs library (which carries only the Development Code, Master Plan, and Subdivision Regulations). Municode's Ordinances-by-year list shows 2021 containing only Ordinances 2021-01 through 2021-21, confirming Resolution 2021-21 is an uncodified administrative resolution outside Municode's scope. The applicant portals do not expose fees publicly either: the CommunityCore portal (app.communitycore.com/app/cripple-creek-co/fees) requires account registration to view fee quotes, and cripplecreek.govbuilt.com resolves to GovBuilt's generic marketing site, not a jurisdiction-specific page. SAFEbuilt's public site (safebuilt.com) carries only generic multi-jurisdiction sample schedules, not usable as a Cripple Creek figure. The City's former domain (cripplecreekgov.com, now squatted with spam content) yields only 2009-2016-era archived permit forms with a blank valuation-based fee field. Colorado's CRS 12-23-117(3) caps local electrical inspection fees at 115% of the State Electrical Board's own fee table, but Cripple Creek's actual resolution-set figure is not published online. Contact the Building Department directly (719-689-3588 ext. 1) for the current amount.Review timeline
Inspection process
- 1
Rough Electrical
New circuit/wiring for the charger installed before concealment
- 2
Final Inspection
Charger installed and connected, circuit verified before energizing
See the full Cripple Creek inspection guide — scheduling & re-inspection fees →
Tips
- There is no separate 'EV charger permit' in Cripple Creek -- it is processed as a standard Electrical Permit, the same as any other electrical work, under state-anchored (DORA) electrician licensure rather than a City-run program.
- If your property sits within the Bennett Avenue Historic District, check whether the charger's visible components (conduit runs, wall-mounted units) trigger the Historic Preservation Commission's Certificate of Appropriateness review before starting work.
- The exact electrical permit fee is set by City Council resolution and is not published online (checked CommunityCore, SAFEbuilt, Municode, and every City Building Department page) -- call the Building Department at 719-689-3588 ext. 1 for a current quote before budgeting.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cripple Creek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Cripple Creek's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Cripple Creek yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Cripple Creek lands. Privacy.
Other permits in Cripple Creek
Electric Vehicle Charging Station Permit in other cities
Compare electric vehicle charging station permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Cripple Creek project checklist
Describe your project once and get every permit, document, and fee it triggers in Cripple Creek — in one checklist. Free, for any city and any number of projects.
Get started →