The City of Cripple Creek does not publish a standalone EV charger/EVSE permit application, fee line, or webpage -- checked the Building Department page, the Contemporaneous Review of Electrical and Plumbing Licenses page, the Permits/Inspections/Contractors Licensing Information page, and Municipal Code Ch. 18 Art. 11 (National Electrical Code) directly; none name electric vehicle charging stations, EV chargers, or EVSE. Installing an EV charger is electrical work and is processed as a standard Electrical Permit under the most current NEC edition as adopted by the State of Colorado (Ch. 18, Art. 11), the same permit type and mechanism documented in this file's electrical-permit entry, including reliance on Colorado State Electrical Board (DORA) licensure for the installing electrician rather than a City-run electrical licensing program. Re-chased exhaustively 2026-07-20 (see sources[] for every avenue checked): the City self-administers this permit locally through its third-party plan-review/permitting vendor SAFEbuilt via the CommunityCore portal, and the electrical permit fee is set by City Council resolution rather than published in Municipal Code, on the City's own pages, or on SAFEbuilt's public site -- no numeric fee table was located after directly checking every public page and portal identified, so this is NOT a case of routing to a state-administered permit (unlike jurisdictions where the State Electrical Board itself issues the permit); Colorado's CRS 12-23-117(3) statutory ceiling (local electrical inspection fees may not exceed 115% of the State Electrical Board's own fee table) legally bounds whatever resolution figure Cripple Creek uses, but does not itself supply Cripple Creek's actual fee.

Reviewed 2026-07-20 · Source

When you need this permit

  • Governed by the most current NEC edition as adopted by the State of Colorado (Cripple Creek Municipal Code Ch. 18, Art. 11 floats to the state-adopted edition), including NEC Article 625 (Electric Vehicle Power Transfer System)
  • Electricians must hold a current Colorado State electrician license or be a registered apprentice per CRS 12-23-101 definitions; City Building Inspectors are authorized and required by state law to perform random reviews of these licenses on job sites
  • No City of Cripple Creek EV-charger-specific permit application exists; use the standard Electrical Permit Application
  • If the property is within the Bennett Avenue Historic District, a Certificate of Appropriateness from the Historic Preservation Commission may be required before permit issuance if the charger installation is visible from a public right-of-way or affects the exterior of a historic structure
  • Electrical permit fees are set 'in an amount as adopted by resolution,' the same mechanism documented in this file's electrical-permit entry -- no distinct EV-specific fee line was found

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit FeeSet by City Council resolution, the same mechanism as this file's electrical-permit entry. Re-chased 2026-07-20: no numeric fee table or EV-specific fee line was located on the City's Building Department page, the Contemporaneous Review page, the Permits/Inspections/Contractors Licensing page, Municode Ch. 18 (fees are not codified there -- text points to a resolution), the CommunityCore applicant portal (requires account registration to view fee quotes), SAFEbuilt's public site (no Cripple Creek-specific fee page found; safebuilt.com carries only generic multi-jurisdiction sample schedules, not usable as a Cripple Creek figure), or the GovBuilt-hosted portal (403 Forbidden to unauthenticated fetch). Colorado's CRS 12-23-117(3) caps local electrical inspection fees at 115% of the State Electrical Board's own fee table, but Cripple Creek's actual resolution-set figure was not independently locatable online. Contact the Building Department directly (719-689-3588 ext. 1) for the current amount. Re-chased again 2026-07-23 (new avenues): City Finance Department and City Clerk pages, the City's 2026 Budget page (docaccess.com-embedded viewer, no fee-schedule PDF apparent), Municode Chapter 4 (Revenue and Finance -- tax articles only, no building fee schedule), Municode's MuniDocs library (Development Code, Master Plan, Subdivision Regulations only), and Municode's Ordinances-by-year list (2021 shows only Ordinances 2021-01 through 2021-21, confirming Resolution 2021-21 is an uncodified administrative resolution outside Municode's scope); cripplecreek.govbuilt.com now returns 200 but resolves to GovBuilt's generic marketing site, not a jurisdiction-specific page; app.communitycore.com/app/cripple-creek-co/fees confirmed as a login-gated SPA shell; Wayback Machine snapshots of the City's former domain (cripplecreekgov.com, now squatted with spam content) surface only 2009-2016-era permit forms with a blank valuation-based fee field. Gap confirmed to remain unrecoverable online.
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Electric Vehicle Charging Station Permit permit actually take in Cripple Creek?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    New circuit/wiring for the charger installed before concealment

  2. 2

    Final Inspection

    Charger installed and connected, circuit verified before energizing

See the full Cripple Creek inspection guide — scheduling & re-inspection fees →

Tips

  • There is no separate 'EV charger permit' in Cripple Creek -- it is processed as a standard Electrical Permit, the same as any other electrical work, under state-anchored (DORA) electrician licensure rather than a City-run program.
  • If your property sits within the Bennett Avenue Historic District, check whether the charger's visible components (conduit runs, wall-mounted units) trigger the Historic Preservation Commission's Certificate of Appropriateness review before starting work.
  • The exact electrical permit fee is set by City Council resolution and is not published online (checked CommunityCore, SAFEbuilt, Municode, and every City Building Department page) -- call the Building Department at 719-689-3588 ext. 1 for a current quote before budgeting.

Frequently asked questions

Cripple Creek requires an electric vehicle charging station permit for: Governed by the most current NEC edition as adopted by the State of Colorado (Cripple Creek Municipal Code Ch. 18, Art. 11 floats to the state-adopted edition), including NEC Article 625 (Electric Vehicle Power Transfer System); Electricians must hold a current Colorado State electrician license or be a registered apprentice per CRS 12-23-101 definitions; City Building Inspectors are authorized and required by state law to perform random reviews of these licenses on job sites; No City of Cripple Creek EV-charger-specific permit application exists; use the standard Electrical Permit Application; If the property is within the Bennett Avenue Historic District, a Certificate of Appropriateness from the Historic Preservation Commission may be required before permit issuance if the charger installation is visible from a public right-of-way or affects the exterior of a historic structure; Electrical permit fees are set 'in an amount as adopted by resolution,' the same mechanism documented in this file's electrical-permit entry -- no distinct EV-specific fee line was found. If your project isn't listed, confirm with City of Cripple Creek Building Department at 719-689-3588 ext. 1 before starting work.

Cripple Creek does not publish a plan-review timeline for this permit. Contact City of Cripple Creek Building Department at 719-689-3588 ext. 1 for current turnaround.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Cripple Creek requires 2 inspection(s) for an electric vehicle charging station permit, in order: Rough Electrical, Final Inspection. Schedule each through City of Cripple Creek Building Department (719-689-3588 ext. 1).

Apply through City of Cripple Creek Building Department at 337 E. Bennett Ave, Cripple Creek, CO 80813 (mailing: P.O. Box 430, Cripple Creek, CO 80813). Phone: 719-689-3588 ext. 1. Office hours: Building Inspector normal duty hours are 7:30 AM to 4:00 PM on Mondays and Fridays only (with an alternate day sometimes added around a holiday week, decided case-by-case). The inspector is typically present in the office at 337 E. Bennett Ave from 7:30-9:00 AM on Monday/Friday mornings for questions in person or by phone (719-689-3588 ext. 1); after 9 AM the inspector is generally in the field performing inspections and returns to the office afterward for consultations. As of May 28, 2026, Martin L. Colgan serves as the City's Combination Inspector (Residential and Commercial Building, Mechanical, Plumbing, and Gas Piping). SAFEbuilt is stated on the City's Building Department page to be the City's new full-service company for plan review, permits, and inspections; the City notes it is currently implementing new permitting software and directs applicants to call the Building Department to ask about the current submission process.. Official information: https://www.cityofcripplecreek.com/building-department.

Cripple Creek, Colorado has adopted: 2018 International Building Code (IBC) — City of Cripple Creek Municipal Code Ch. 18, Art. 2 Sec. 18-2-10 and Art. 3 (adopted by Ord. No. 2019-03, as amended by Ord. No. 2022-06 and Ord. No. 2023-13); 2018 International Residential Code (IRC), including Appendices H, J, and Q — Ch. 18, Art. 4; International Plumbing Code (IPC), most current edition as adopted by the State of Colorado — Ch. 18, Art. 5; 2018 International Mechanical Code (IMC) — Ch. 18, Art. 6; 2015 International Fuel Gas Code (IFGC) — Ch. 18, Art. 7; 2018 International Energy Conservation Code (IECC) — Ch. 18, Art. 8; 2018 International Fire Code (IFC), including all appendices A-N — Ch. 18, Art. 9; 2018 International Existing Building Code (IEBC) — Ch. 18, Art. 10; National Electrical Code (NEC), most current edition as adopted by the State of Colorado — Ch. 18, Art. 11; 2018 International Swimming Pool and Spa Code (ISPSC) — Ch. 18, Art. 12; 2018 International Property Maintenance Code (IPMC) — Ch. 18, Art. 13; ASME A17.1 (2010)/A17.2 (2010)/A17.6 (2010)/A17.3 (2010) and A18.1 (2011) Safety Code for Elevators and Escalators, as adopted by Teller County (SCEE) — Ch. 18, Art. 14; all inspections performed by Teller County's designated ASME Certified Inspector, results submitted to the City Building Department; Manufactured Home Code (locally drafted, not an ICC model code) — Ch. 18, Art. 19, enacted by Ord. No. 2021-11; Note on code currency: Cripple Creek Municipal Code Chapter 18 adopts the 2018-cycle IBC/IRC/IMC/IECC/IFC/IEBC/ISPSC/IPMC by reference (via Ord. No. 2019-03, adopted Aug. 7, 2019), one cycle behind the 2021/2024 editions used by some neighboring Colorado jurisdictions (e.g. Vail's 2024 cycle). The IPC and NEC sections instead float to 'the most current edition as adopted by the State of Colorado,' so those two trades track the state's adoption cycle rather than a fixed local edition. This is the governing, most-recently-verified text of Municode's Cripple Creek library as of this review (chapter carries amendment history through Ord. No. 2023-13, effective 1-3-24).. Local amendments apply — see the Cripple Creek overview page for the full list.

No. The City does not publish a dedicated EV charger/EVSE permit application or fee line. An EV charger installation is processed as a standard Electrical Permit under the state-adopted NEC, the same as any other electrical work in Cripple Creek.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cripple Creek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.