No solar-specific permit type, expedited track, or fee schedule is published by the City of Burlington (re-confirmed 2026-07-13; no such program has appeared on the City's site or in DOLA/DORA materials). A rooftop solar PV installation would be processed under the general combined Building Permit/Zoning Compliance Application, with the electrical portion of the work falling under the Colorado State Electrical Board permit system — this is now a directly-confirmed determination (see this file's electrical-permit entry, upgraded to verified 2026-07-13 via DORA's own current jurisdiction page at dpo.colorado.gov/ElectricalPlumbingPermits showing Kit Carson County absent from the counties with their own local Electrical Inspection Program), not merely an inference.

Verified 2026-07-13 · Source

When you need this permit

  • Complete the combined Building Permit/Zoning Compliance Application for the structural/roof-mounting portion of the installation
  • Obtain a Colorado State Electrical Permit (DORA) for the electrical/interconnection portion of the installation, consistent with this file's assessment that Burlington defaults to state electrical permitting
  • Electrical work must be performed by a duly licensed Colorado electrician

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (same valuation-based schedule)No solar-specific fee is published by the City
$25 minimum, scaling per the tiered valuation schedule
State Electrical Permit FeeNot itemized in any Burlington city document
Set by the Colorado State Electrical Board fee schedule (DORA)

Review timeline

Plan review
Not published — contact the department

How long did your Rooftop Solar PV Permit permit actually take in Burlington?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Electrical Inspection (interconnection)

    Performed by a Colorado State Electrical Board inspector, per this file's directly-confirmed (2026-07-13) electrical-permit jurisdictional determination

  2. 2

    Final/Field Inspection (structural/roof-mounting)

    No itemized City inspection sequence for solar mounting is published

See the full Burlington inspection guide — scheduling & re-inspection fees →

Tips

  • Because Burlington has no published solar-specific process, budget time to coordinate two separate approvals: a City building permit for the roof-mounting/structural work, and a Colorado State Electrical Board permit for the interconnection — confirm the exact split of responsibility with City Hall before starting.

Frequently asked questions

Burlington requires a rooftop solar pv permit for: Complete the combined Building Permit/Zoning Compliance Application for the structural/roof-mounting portion of the installation; Obtain a Colorado State Electrical Permit (DORA) for the electrical/interconnection portion of the installation, consistent with this file's assessment that Burlington defaults to state electrical permitting; Electrical work must be performed by a duly licensed Colorado electrician. If your project isn't listed, confirm with City of Burlington, City Hall (Building Permits) at 719-346-8652 before starting work.

In Burlington, the published Building Permit Fee (same valuation-based schedule) is: $25 minimum, scaling per the tiered valuation schedule. Additional published fees: State Electrical Permit Fee — Set by the Colorado State Electrical Board fee schedule (DORA). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Burlington does not publish a plan-review timeline for this permit. Contact City of Burlington, City Hall (Building Permits) at 719-346-8652 for current turnaround.

You'll need: Building Permit Application / Zoning Compliance Application (PDF); Colorado State Electrical Permit (DORA). See the required-documents checklist on this page for details on each.

Burlington requires 2 inspection(s) for a rooftop solar pv permit, in order: State Electrical Inspection (interconnection), Final/Field Inspection (structural/roof-mounting). Schedule each through City of Burlington, City Hall (Building Permits) (719-346-8652).

Apply through City of Burlington, City Hall (Building Permits) at 415 15th Street, Burlington, CO 80807. Phone: 719-346-8652, email: jim.keehne@burlingtoncolo.com. Office hours: Monday through Friday, 7:00 a.m. to 4:00 p.m. Fax: 719-346-8397. Building permits are administered directly by City Hall administrative staff (no separate, dedicated Building Division or named Building Official is published) — the Building Permit Application lists Jim Keehne, City Administrator, as the responsible city officer, with a Public Works signoff line also present on the form.. Official information: https://www.burlingtoncolo.com/151/Building-Permits.

Burlington, Colorado has adopted: NONE LOCALLY ADOPTED — verified directly from the City's own Building Permit Application form (DocumentCenter/View/187), which the applicant must sign: 'I hereby agree and understand that City of Burlington has not adopted a building code and it is my responsibility to follow all state guidelines regarding state building codes, local building codes and all inspections the State of Colorado, City of Burlington and the Colorado Department of Local Affairs and Housing may require.'; The City's own Building Codes webpage (burlingtoncolo.com/96/Building-Codes) independently corroborates this: it states the City 'requires all buildings to meet the compliance standards of the State of Colorado's building codes' and links to the Colorado Office of the State Architect (OSA) building-codes page (osa.colorado.gov/state-buildings/building-codes) — but that OSA page was checked directly and its adopted-code list applies ONLY to state-owned/state-lease-purchased construction and specific state-assisted categories (K-12 schools, health facilities), NOT to private construction in municipalities. Burlington's own reference to it therefore does not establish any specific IBC/IRC/IECC/NEC edition as locally adopted or locally enforced for private building permits — it is effectively a pointer to a source that does not govern ordinary residential/commercial permits in Burlington.; Net effect: Burlington has NO locally adopted model code edition (no IBC, IRC, IMC, IPC, IFGC, IECC, IFC, IEBC, or NEC edition/year is specified anywhere in the City's own building-permit materials). Applicants are directed to follow 'state guidelines' generally and Colorado Department of Local Affairs (DOLA)/Division of Housing requirements where applicable, rather than a codified local building code. This is a genuinely verified absence, not an omission — confirmed by the primary-source application form language plus the City's own Building Codes page, and consistent with Burlington's Municode-hosted Code of Ordinances not surfacing any building-code-adoption ordinance in available search results (Municode's Burlington library page is a JavaScript-rendered single-page app that could not be crawled for full-text search during this research; the City's own Ordinances & Resolutions page listing recent ordinance numbers did not show a building-code-adoption ordinance among currently listed items).. Local amendments apply — see the Burlington overview page for the full list.

No. The City does not publish any solar-specific permit type, fee, or expedited track. A rooftop solar PV installation is processed under the general combined Building Permit/Zoning Compliance Application plus a Colorado State Electrical Board permit for the electrical/interconnection work.

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Burlington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.