Change of Use / Certificate of Zoning Compliance Permit — Burlington, Colorado · Requirements sheet
Verified 2026-08-13 · Source: https://library.municode.com/co/burlington/codes/code_of_ordinances?nodeId=TIT17ZO_CH17.12BUPECEZOCO
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Certificate of Zoning Compliance Permit in Burlington, Colorado
RESEARCHED 2026-08-13: unlike several peer small Colorado towns in this corpus with no standalone change-of-use process, Burlington has a real, directly codified change-of-use requirement. Burlington Municipal Code Chapter 17.12 (Building Permits and Certificates of Zoning Compliance), Section 17.12.020(A), read in full live via Municode, explicitly states: 'A certificate of zoning compliance shall be required: ...3. To change the use of any building or structure; 4. To change the use of any property in the city.' This is the codified legal basis underlying Part B ('Change of Use') of the City's combined Building Permit/Zoning Compliance Application — already documented in this file's commercial-tenant-improvement entry as the intake form — but this entry grounds the requirement directly in the statute itself (17.12.020 through 17.12.060) rather than only in the application form, and applies to any change of use in the city, residential or commercial, not solely commercial tenant improvements.
Verified 2026-08-13 · Source
When you need this permit
- A certificate of zoning compliance is required to change the use of any building, structure, or property in the city (Burlington Municipal Code 17.12.020(A)(3)-(4))
- It is unlawful to use or occupy any building or premises whose use has been changed, converted, or altered until a certificate of zoning compliance has been issued (17.12.020(C)); violation is punishable under Section 17.40.020
- Complete Part B ('Change of Use') of the combined Building Permit/Zoning Compliance Application: present use, proposed use, current zone, and annexation/petition status if applicable
- Submit the application on the form prescribed by the zoning compliance officer, together with a plat drawn to scale showing the lot's actual shape/dimensions, the existing and intended use of each building and of the property, present and proposed utility/service connections, drainage courses and easements, and conditions within fifteen feet of the lot perimeter (17.12.030(A)-(B), the same Title 17.12.030(B) plat cited throughout this file)
- In areas not served by public water or sewer, submit a certified statement that proposed water/sewer facilities will conform to State Department of Health minimum requirements (17.12.030(C))
- An application filed on behalf of a fraternal, charitable, or civic organization must be accompanied by a resolution of that organization authorizing the application (17.12.030(D))
- A certificate issued becomes invalid if the physical work it authorizes is not commenced within six months of issuance, or is suspended/abandoned for one year (17.12.040) — for a pure change of use involving no physical construction, confirm with City Hall how this expiration provision is applied in practice
- Complete Part A of the combined application as well if the change of use is accompanied by construction, remodeling, or alteration work (see this file's residential-addition-remodel and commercial-tenant-improvement entries)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final/Field Inspection
No itemized inspection sequence specific to a standalone change of use (without accompanying construction) is published; if construction accompanies the use change, the general Final/Field Inspection documented in this file's residential-building-permit entry would apply
See the full Burlington inspection guide — scheduling & re-inspection fees →
Tips
- Burlington's change-of-use requirement is not merely a line item on the intake form — it is an independently codified legal requirement (BMC 17.12.020(A)(3)-(4)) that makes it unlawful to occupy a building or property under a changed use without first obtaining a certificate of zoning compliance, enforceable under Section 17.40.020.
- The certificate's six-month-to-commence / one-year-suspension expiration rule (17.12.040) was written with physical construction in mind — if your change of use involves no construction at all, ask City Hall directly how (or whether) this provision is applied to a pure use-change certificate.
- If your change of use is a commercial tenant improvement involving physical construction, see this file's commercial-tenant-improvement entry, which documents the same Part B intake alongside the construction-specific Part A requirements.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Burlington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Burlington
Change of Use / Certificate of Zoning Compliance Permit in other cities
Compare change of use / certificate of zoning compliance permit fees across Colorado →
Look up this fee in a different city →