EV Charger / EVSE Permit in Burlington, Colorado

Installation of an electric vehicle charger (EVSE) at a Burlington property is electrical work, and the City of Burlington does not itself issue electrical permits — electrical permitting, inspection, and fees are handled by the Colorado State Electrical Board (DORA), not itemized in any City of Burlington fee document. There is no City-issued EV-charger-specific permit or fee. A City building permit / zoning compliance application may still be required for the overall project depending on scope (e.g., new equipment enclosures).

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit obtained directly through the Colorado State Electrical Board (DORA), not the City of Burlington
  • Colorado-licensed electrical contractor required
  • Dedicated branch circuit sized to EVSE manufacturer specifications, complying with the applicable NEC edition — Burlington has not adopted its own local building/electrical code, per the City's own Building Permit Application acknowledgment
  • A City of Burlington Building Permit / Zoning Compliance Application may still be required for the associated site work (e.g., mounting structure, utility locate)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

State Electrical Permit FeeConfirm current state fee schedule at dpo.colorado.gov/EandP/Permits; not itemized in any Burlington city document, same routing as Burlington's general Electrical Permit
Set by the Colorado State Electrical Board fee schedule (DORA), not the City of Burlington

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Burlington?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Electrical Inspection

    Conducted under DORA's electrical inspection program, not a City of Burlington inspection

See the full Burlington inspection guide — scheduling & re-inspection fees →

Tips

  • Do not contact Burlington City Hall for an EV charger/EVSE electrical permit — that trade is routed entirely to the Colorado State Electrical Board (DORA), the same as Burlington's general Electrical Permit.
  • Burlington has not adopted a local building code at all (per the City's own Building Permit Application acknowledgment), so there is no local code edition to confirm for the EVSE installation itself — applicable code follows State of Colorado guidance.

Frequently asked questions

Burlington requires an ev charger / evse permit for: Electrical permit obtained directly through the Colorado State Electrical Board (DORA), not the City of Burlington; Colorado-licensed electrical contractor required; Dedicated branch circuit sized to EVSE manufacturer specifications, complying with the applicable NEC edition — Burlington has not adopted its own local building/electrical code, per the City's own Building Permit Application acknowledgment; A City of Burlington Building Permit / Zoning Compliance Application may still be required for the associated site work (e.g., mounting structure, utility locate). If your project isn't listed, confirm with City of Burlington, City Hall (Building Permits) at 719-346-8652 before starting work.

In Burlington, the published State Electrical Permit Fee is: Set by the Colorado State Electrical Board fee schedule (DORA), not the City of Burlington. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Burlington does not publish a plan-review timeline for this permit. Contact City of Burlington, City Hall (Building Permits) at 719-346-8652 for current turnaround.

You'll need: Colorado State Electrical Board (DORA) Electrical Permit Application. See the required-documents checklist on this page for details on each.

Burlington requires 1 inspection(s) for an ev charger / evse permit, in order: State Electrical Inspection. Schedule each through City of Burlington, City Hall (Building Permits) (719-346-8652).

Apply through City of Burlington, City Hall (Building Permits) at 415 15th Street, Burlington, CO 80807. Phone: 719-346-8652, email: jim.keehne@burlingtoncolo.com. Office hours: Monday through Friday, 7:00 a.m. to 4:00 p.m. Fax: 719-346-8397. Building permits are administered directly by City Hall administrative staff (no separate, dedicated Building Division or named Building Official is published) — the Building Permit Application lists Jim Keehne, City Administrator, as the responsible city officer, with a Public Works signoff line also present on the form.. Official information: https://www.burlingtoncolo.com/151/Building-Permits.

Burlington, Colorado has adopted: NONE LOCALLY ADOPTED — per the City's own Building Permit Application form (DocumentCenter/View/187), which the applicant must sign: 'I hereby agree and understand that City of Burlington has not adopted a building code and it is my responsibility to follow all state guidelines regarding state building codes, local building codes and all inspections the State of Colorado, City of Burlington and the Colorado Department of Local Affairs and Housing may require.'; The City's own Building Codes webpage (burlingtoncolo.com/96/Building-Codes) states that the City 'requires all buildings to meet the compliance standards of the State of Colorado's building codes' and links to the Colorado Office of the State Architect (OSA) building-codes page (osa.colorado.gov/state-buildings/building-codes). That OSA page's adopted-code list applies ONLY to state-owned and state-lease-purchased construction and specific state-assisted categories (K-12 schools, health facilities), NOT to private construction in municipalities. Burlington's reference to it therefore does not establish any specific IBC/IRC/IECC/NEC edition as locally adopted or locally enforced for private building permits — it points at a source that does not govern ordinary residential or commercial permits in Burlington.; Net effect: Burlington has NO locally adopted model code edition — no IBC, IRC, IMC, IPC, IFGC, IECC, IFC, IEBC or NEC edition/year is specified anywhere in the City's own building-permit materials OR in its codified Municipal Code. Applicants are directed to follow 'state guidelines' generally and Colorado DOLA/Division of Housing requirements where applicable. The Municipal Code itself supports this directly: Title 15 DOES contain a 'Chapter 15.04 - BUILDING CODE ADOPTED', but the codified chapter has no adoption section in it — it runs 15.04.020 (Fee for building permit) then 15.04.030 (Fire zones established), with no 15.04.010 and no model-code-adoption text anywhere in the chapter, despite the chapter's own title. The remaining chapters of Title 15 are 15.14 (Manufactured Housing) and 15.16 (Mobile Home Parks), neither of which adopts a model code. Source: City of Burlington Code of Ordinances Title 15 (Buildings and Construction), library.municode.com (nodeId TIT15BUCO).; Burlington's codified building chapter still carries a Uniform Building Code cross-reference, which is the likely explanation for the absence of an I-code adoption section above. Burlington Code of Ordinances Sec. 15.04.030 ('Fire zones established') reads verbatim: 'For the purpose of applying the Uniform Building Code, all of the area within the corporate limits of the city is divided into two fire zones. Fire Zone 1 shall consist of all that part of the city included within the boundaries of Zoning Districts C-1 and L-1 as shown upon the official copy of the city zoning district map on file in the office of the city clerk. There shall be no Fire Zone 2. Fire Zone 3 shall consist of all that portion of the city not included within Fire Zone 1 as described in this section.' (Prior code Sec. 11.3.) The Uniform Building Code is the pre-2000 ICBO code family that the I-codes replaced, and the chapter was never re-pointed at an I-code edition. Note the internal oddity in the section as written: it announces 'two fire zones' and then names Zone 1 and Zone 3 while expressly abolishing Zone 2 — that is how the ordinance reads. The section states no UBC edition year, so it does not amount to adoption of any particular UBC edition; it is a surviving cross-reference in a chapter whose adoption section is absent. Source: City of Burlington Code of Ordinances Title 15 (Buildings and Construction), on library.municode.com.; CORRECTION RECORDED 2026-08-17. No code edition changed in this record and no figure changed, because Burlington's headline claim turned out to be right. What changed is that the claim no longer rests on 'Municode could not be crawled'. The distinction matters and is the whole point of this campaign: 'I read Chapter 15.04 and it contains no adoption section' is evidence of absence; 'my crawler could not read Municode, and nothing turned up' is not. The chapter also yielded two facts the blocker had hidden — the surviving Uniform Building Code cross-reference at Sec. 15.04.030, and the fact that the valuation fee schedule is CODIFIED at Sec. 15.04.020 (Ord. No. 952, Sec. 1, 3-9-2020) rather than merely printed on a form.. Local amendments apply — see the Burlington overview page for the full list.

No. The City of Burlington does not issue electrical permits of any kind, including for EV charger/EVSE installations. Electrical permitting is handled entirely by the Colorado State Electrical Board (DORA).

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Burlington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Burlington's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Burlington yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Burlington lands. Privacy.