EV Charger / EVSE Permit in Burlington, Colorado
Installation of an electric vehicle charger (EVSE) at a Burlington property is electrical work, and the City of Burlington does not itself issue electrical permits — electrical permitting, inspection, and fees are handled by the Colorado State Electrical Board (DORA), not itemized in any City of Burlington fee document. There is no City-issued EV-charger-specific permit or fee. A City building permit / zoning compliance application may still be required for the overall project depending on scope (e.g., new equipment enclosures).
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit obtained directly through the Colorado State Electrical Board (DORA), not the City of Burlington
- Colorado-licensed electrical contractor required
- Dedicated branch circuit sized to EVSE manufacturer specifications, complying with the applicable NEC edition — Burlington has not adopted its own local building/electrical code, per the City's own Building Permit Application acknowledgment
- A City of Burlington Building Permit / Zoning Compliance Application may still be required for the associated site work (e.g., mounting structure, utility locate)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Inspection
Conducted under DORA's electrical inspection program, not a City of Burlington inspection
See the full Burlington inspection guide — scheduling & re-inspection fees →
Tips
- Do not contact Burlington City Hall for an EV charger/EVSE electrical permit — that trade is routed entirely to the Colorado State Electrical Board (DORA), the same as Burlington's general Electrical Permit.
- Burlington has not adopted a local building code at all (per the City's own Building Permit Application acknowledgment), so there is no local code edition to confirm for the EVSE installation itself — applicable code follows State of Colorado guidance.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Burlington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Burlington's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Burlington yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Burlington lands. Privacy.
Other permits in Burlington
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Burlington project checklist
Describe your project once and get every permit, document, and fee it triggers in Burlington — in one checklist. Free, for any city and any number of projects.
Get started →