Electrical Permit in Burlington, Colorado

Burlington's own Building Permit Application does not describe a City-run electrical permit or inspection process (it only requires that electrical work be performed by a duly licensed electrician). Directly confirmed 2026-07-13 via DORA's own current, publicly accessible jurisdiction page (dpo.colorado.gov/ElectricalPlumbingPermits, HTTP 200): Kit Carson County is NOT among the Colorado counties listed as having their own local Electrical Inspection Program (the page states 'The State does not inspect in local jurisdictions having its own Electrical Inspection Program... If the county where your job site is located is listed below, do not continue with the permit application process' and lists Adams, Arapahoe, Boulder, Broomfield, Chaffee, City of Pueblo/Town of Boone, Delta (City of Delta only), Denver, Douglas, Eagle, El Paso, Jefferson, Larimer, Mesa, Pitkin, Pueblo, San Miguel, Summit, Teller, and Weld — Kit Carson is absent). Combined with CRS 12-115-120's default-to-state-inspection rule for jurisdictions without their own certified program, electrical permitting/inspection in Burlington is confirmed to default to the Colorado State Electrical Board (DORA).

Verified 2026-07-13 · Source

When you need this permit

  • Electrical work must be performed by a duly licensed Colorado electrician (per the City's Building Permit Application certification requirement)
  • Absent a City-run electrical inspection program, apply for a Colorado State Electrical Permit through the DORA Division of Professions and Occupations online permitting system prior to installing electrical wiring
  • State Electrical Permits are valid for one year from the date of issuance

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

State Electrical Permit FeeConfirm current state fee schedule at dpo.colorado.gov/Electrical; not itemized in any Burlington city document
Set by the Colorado State Electrical Board fee schedule (DORA), not the City of Burlington

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Burlington?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Electrical Inspection

    Performed by a Colorado State Electrical Board inspector rather than a City of Burlington inspector, per the assessed jurisdictional default

See the full Burlington inspection guide — scheduling & re-inspection fees →

Tips

  • Do not assume Burlington issues its own electrical permits — confirm directly with City Hall (719-346-8652) whether any local process exists before applying to the state. As of 2026-07-13 this file's determination that Kit Carson County/Burlington defaults to the State Electrical Board is directly confirmed by DORA's own current jurisdiction page (dpo.colorado.gov/ElectricalPlumbingPermits), not merely inferred: Kit Carson County does not appear on DORA's published list of counties with their own local Electrical Inspection Program.

Frequently asked questions

Burlington requires an electrical permit for: Electrical work must be performed by a duly licensed Colorado electrician (per the City's Building Permit Application certification requirement); Absent a City-run electrical inspection program, apply for a Colorado State Electrical Permit through the DORA Division of Professions and Occupations online permitting system prior to installing electrical wiring; State Electrical Permits are valid for one year from the date of issuance. If your project isn't listed, confirm with City of Burlington, City Hall (Building Permits) at 719-346-8652 before starting work.

In Burlington, the published State Electrical Permit Fee is: Set by the Colorado State Electrical Board fee schedule (DORA), not the City of Burlington. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Burlington does not publish a plan-review timeline for this permit. Contact City of Burlington, City Hall (Building Permits) at 719-346-8652 for current turnaround.

You'll need: Colorado State Electrical Permit (DORA). See the required-documents checklist on this page for details on each.

No City-run electrical permit or inspection process is described anywhere in Burlington's own building-permit materials. DORA's own current jurisdiction page (dpo.colorado.gov/ElectricalPlumbingPermits) confirms Kit Carson County is not among the Colorado counties with their own local Electrical Inspection Program, so electrical work in Burlington defaults to the Colorado State Electrical Board (DORA) permit and inspection system per CRS 12-115-120.

Apply through City of Burlington, City Hall (Building Permits) at 415 15th Street, Burlington, CO 80807. Phone: 719-346-8652, email: jim.keehne@burlingtoncolo.com. Office hours: Monday through Friday, 7:00 a.m. to 4:00 p.m. Fax: 719-346-8397. Building permits are administered directly by City Hall administrative staff (no separate, dedicated Building Division or named Building Official is published) — the Building Permit Application lists Jim Keehne, City Administrator, as the responsible city officer, with a Public Works signoff line also present on the form.. Official information: https://www.burlingtoncolo.com/151/Building-Permits.

Burlington, Colorado has adopted: NONE LOCALLY ADOPTED — verified directly from the City's own Building Permit Application form (DocumentCenter/View/187), which the applicant must sign: 'I hereby agree and understand that City of Burlington has not adopted a building code and it is my responsibility to follow all state guidelines regarding state building codes, local building codes and all inspections the State of Colorado, City of Burlington and the Colorado Department of Local Affairs and Housing may require.'; The City's own Building Codes webpage (burlingtoncolo.com/96/Building-Codes) independently corroborates this: it states the City 'requires all buildings to meet the compliance standards of the State of Colorado's building codes' and links to the Colorado Office of the State Architect (OSA) building-codes page (osa.colorado.gov/state-buildings/building-codes) — but that OSA page was checked directly and its adopted-code list applies ONLY to state-owned/state-lease-purchased construction and specific state-assisted categories (K-12 schools, health facilities), NOT to private construction in municipalities. Burlington's own reference to it therefore does not establish any specific IBC/IRC/IECC/NEC edition as locally adopted or locally enforced for private building permits — it is effectively a pointer to a source that does not govern ordinary residential/commercial permits in Burlington.; Net effect: Burlington has NO locally adopted model code edition (no IBC, IRC, IMC, IPC, IFGC, IECC, IFC, IEBC, or NEC edition/year is specified anywhere in the City's own building-permit materials). Applicants are directed to follow 'state guidelines' generally and Colorado Department of Local Affairs (DOLA)/Division of Housing requirements where applicable, rather than a codified local building code. This is a genuinely verified absence, not an omission — confirmed by the primary-source application form language plus the City's own Building Codes page, and consistent with Burlington's Municode-hosted Code of Ordinances not surfacing any building-code-adoption ordinance in available search results (Municode's Burlington library page is a JavaScript-rendered single-page app that could not be crawled for full-text search during this research; the City's own Ordinances & Resolutions page listing recent ordinance numbers did not show a building-code-adoption ordinance among currently listed items).. Local amendments apply — see the Burlington overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Burlington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.