Residential Building Permit (New Construction / Addition) in Burlington, Colorado
Required for new construction or additions to residential (and other) structures within Burlington city limits. Issued through City Hall on a single combined 'Building Permit Application / Zoning Compliance Application' form. Because Burlington has not adopted a local building code, the applicant is contractually bound (via the permit application itself) to follow applicable State of Colorado building-code guidance and any Colorado Department of Local Affairs/Division of Housing requirements rather than a codified local building code.
Reviewed 2026-08-26 · Source
When you need this permit
- Complete Part A (New Building, Addition, Garage, Fence, or Other) and Part C (Utility Taps) of the combined Building Permit/Zoning Compliance Application
- Attach a scale drawing of the tract and the building to be built, repaired, or altered, with utilities and sidewalks and all dimensions clearly indicated
- Attach a Title 17.12.030(B)-compliant zoning plat: scaled drawing showing exact lot shape/dimensions, exact size/location of existing and proposed buildings/structures and driveways, present and proposed use of the property, and location of all utility/service connections and drainage courses, plus relevant conditions within 15 feet of the lot perimeter
- Complete and return a separate Building Permit Locate Form: call 811 or 800-922-1987 for a utility line locate before construction begins (approximately 3-day turnaround, ticket valid 30 days, no charge unless lines must be moved); certify the structure is not built over a gas line or any utility line
- Sign the applicant certification acknowledging Burlington has not adopted a building code and that state building-code guidelines, local requirements, and DOLA/Division of Housing inspection requirements govern
- Employ only duly licensed plumbers and electricians for any plumbing/electrical work (Colorado state licensure, per State Plumbing Board/State Electrical Board) Contractor
- Disclose where construction materials will be purchased and pay the 2% city use tax on any materials purchased outside the city (Burlington Municipal Code Chapter 3.08), either by estimate at permit issuance or via affidavit if purchasing from an in-city licensed retailer
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
The City publishes no building permit fee schedule. Show full citationHide
The City publishes no building permit fee schedule. Its Building Permits page states only that 'There is a fee for each permit' and directs applicants to contact City Hall at 719-346-8652 for an application packet; the Building Permit Application prints blank 'Tap Fee', 'Use Tax', 'Permit Fee' and 'Administrative Fee' lines for staff to complete, and the Building Codes page carries no fee figures. Ask City Hall for the amount that applies to your project valuation before you budget.Review timeline
Inspection process
- 1
Utility Locate Verification
811/800-922-1987 line-locate ticket must be completed and the Locate Form returned to City Hall before construction begins
- 2
Final/Field Inspection
Because no local building code is adopted and no dedicated Building Division or inspector is named in the City's available materials, Burlington publishes no specific inspection sequence — foundation, framing, rough-in, final — for standard construction. The permit form includes a 'Public Works' signoff line, indicating Public Works staff play some inspection or signoff role, but no itemized inspection checklist is published. Ask the City what it will want to see and when.
See the full Burlington inspection guide — scheduling & re-inspection fees →
Tips
- Burlington has NOT adopted a local building code — the permit application itself requires the owner to sign an acknowledgment of this fact and agree to follow state guidelines instead. Do not assume a specific IBC/IRC edition applies; confirm applicable state guidance directly with City Hall or the Colorado Division of Housing/OSA as relevant to your specific project type.
- Budget at least 3 business days for the mandatory utility line locate (811) before you can begin construction — the Locate Form must be returned to City Hall with your Building Permit Application, and structures cannot be built over any utility line including gas lines.
- If you plan to purchase construction materials from a retailer outside Burlington city limits, budget for the 2% municipal use tax (Chapter 3.08) — you can avoid the estimate-based method by filing an affidavit that all materials will be purchased from a licensed in-city retailer instead.
- The building permit fee schedule is valuation-based starting at a $25 minimum for very small projects, not a single flat fee — get a construction cost estimate before applying so City Hall can calculate your tier correctly.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-26.
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Burlington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Burlington's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Burlington yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Burlington lands. Privacy.
Other permits in Burlington
Residential Building Permit (New Construction / Addition) in other cities
Compare residential building permit (new construction / addition) fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Burlington project checklist
Describe your project once and get every permit, document, and fee it triggers in Burlington — in one checklist. Free, for any city and any number of projects.
Get started →