Demolition Permit — Burlington, Colorado · Requirements sheet
Verified 2026-07-13 · Source: https://www.burlingtoncolo.com/151/Building-Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Demolition Permit in Burlington, Colorado
Demolition is one of the enumerated project types on the general Building Permit/Zoning Compliance Application intake. A distinct, separate dangerous-building-abatement process also exists and was fully verified 2026-07-13: the City's own PDF of Ordinance No. 990 (burlingtoncolo.com/DocumentCenter/View/909) was retrieved and read in full (its filename retains the phrase 'proposed...DRAFT' from drafting, but the document's own text shows it was PASSED, ADOPTED and ORDERED PUBLISHED by the City Council on July 8, 2024, signed by Mayor Greg Swiatkowski, attested by City Clerk Georgia Gilley, with a Clerk's Certificate and a Certificate of Publication confirming publication in The Burlington Record on July 11, 2024 — i.e., it is the enacted, currently-effective ordinance despite the filename, not an unadopted draft). Ordinance No. 990 governs INVOLUNTARY code-enforcement demolition/abatement of buildings the City declares 'dangerous' (structural failure, fire/collapse hazard, uninhabitable, abandoned 6+ months, public nuisance, etc. — Section 2, items A-P) and is legally and procedurally distinct from a standard VOLUNTARY demolition permit processed on the combined Building Permit/Zoning Compliance Application.
Verified 2026-07-13 · Source
When you need this permit
- Complete the combined Building Permit/Zoning Compliance Application, describing the demolition scope under Part A
- Coordinate utility disconnection and the Building Permit Locate Form (811/800-922-1987) before demolition begins, consistent with the general new-construction requirements
- Where a structure is instead the subject of a City-initiated dangerous-building declaration under Ordinance No. 990 (verified full text 2026-07-13), a distinct abatement process applies rather than a standard voluntary demolition permit: the City Administrator may declare a building 'dangerous' per the 16 criteria in Section 2 (structural failure/collapse risk, fire hazard, uninhabitability, 6+ months abandonment, public nuisance, etc.); the owner is served written notice (personal service or, if the owner cannot be located, posting plus certified mail to the address on the Kit Carson County tax rolls) with a default 90-day period to voluntarily abate (Section 7.C); if not voluntarily abated, the City may seek a judicial determination and abate the building itself, recovering costs from the owner as a property lien (Section 8) collected the same way as real estate taxes, plus a 5% inspection/incidental-cost assessment and a 10% collection-cost assessment on top of the abatement's actual cost; imminently dangerous buildings may be summarily (immediately) abated by the City Administrator without the notice-and-90-day process (Section 7.A-B)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final/Field Inspection
No itemized inspection sequence for a standard voluntary demolition permit is published
See the full Burlington inspection guide — scheduling & re-inspection fees →
Tips
- If the structure to be demolished is the subject of a City dangerous-building declaration rather than a project you initiated, Ordinance No. 990's abatement process applies instead of (or alongside) a standard voluntary demolition permit — verified in full text 2026-07-13 via the City's own PDF (burlingtoncolo.com/DocumentCenter/View/909). Key practical point: if the City abates the building itself after you fail to voluntarily comply within the notice period (default 90 days), the full cost is assessed against you as a property lien plus a 5% inspection surcharge and a 10% collection surcharge, collected the same way as real estate taxes — voluntary abatement or a standard demolition permit is materially cheaper than letting the City's process run.
- Ordinance No. 990 was passed, adopted, and ordered published on July 8, 2024 (published in The Burlington Record on July 11, 2024) — it is a Home Rule ordinance enacted under the authority of C.R.S. 31-15-601, and is the currently-effective version despite the source PDF's filename retaining the words 'proposed' and 'DRAFT' from its drafting stage.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Burlington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Burlington
Demolition Permit in other cities
Compare demolition permit fees across Colorado →
Look up this fee in a different city →