Skip to main content
PermitBase

Commercial Tenant Improvement / Change of Use Permit in Burlington, Colorado

Commercial tenant improvements and changes of use are processed under Part B ('Change of Use') of the combined Building Permit/Zoning Compliance Application, which separately captures present use, proposed use, current zoning, and any annexation/petition status, alongside Part A for any physical construction scope.

Verified 2026-07-06 · Source

When you need this permit

  • Complete Part B of the combined application: present use, proposed use, current zone, and annexation/petition status if applicable
  • Complete Part A if the tenant improvement includes physical construction, addition, or alteration work
  • Confirm zoning compliance for the proposed use with City Hall before applying

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (same valuation-based schedule, if construction work is involved)No separate change-of-use or commercial-TI-specific fee is published; a Change of Use with no construction scope may not trigger the valuation-based fee at all — confirm with City Hall
$25 minimum, scaling per the tiered valuation schedule

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement / Change of Use Permit permit actually take in Burlington?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final/Field Inspection

    No itemized inspection sequence for commercial tenant improvements is published

See the full Burlington inspection guide — scheduling & re-inspection fees →

Tips

  • A pure change of use with no physical construction may be processed differently (and possibly at lower or no fee) than a change of use combined with tenant-improvement construction — clarify the scope with City Hall before submitting.

Frequently asked questions

Burlington requires a commercial tenant improvement / change of use permit for: Complete Part B of the combined application: present use, proposed use, current zone, and annexation/petition status if applicable; Complete Part A if the tenant improvement includes physical construction, addition, or alteration work; Confirm zoning compliance for the proposed use with City Hall before applying. If your project isn't listed, confirm with City of Burlington, City Hall (Building Permits) at 719-346-8652 before starting work.

In Burlington, the published Building Permit Fee (same valuation-based schedule, if construction work is involved) is: $25 minimum, scaling per the tiered valuation schedule. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Burlington does not publish a plan-review timeline for this permit. Contact City of Burlington, City Hall (Building Permits) at 719-346-8652 for current turnaround.

You'll need: Building Permit Application / Zoning Compliance Application (PDF). See the required-documents checklist on this page for details on each.

Burlington requires 1 inspection(s) for a commercial tenant improvement / change of use permit, in order: Final/Field Inspection. Schedule each through City of Burlington, City Hall (Building Permits) (719-346-8652).

Apply through City of Burlington, City Hall (Building Permits) at 415 15th Street, Burlington, CO 80807. Phone: 719-346-8652, email: jim.keehne@burlingtoncolo.com. Office hours: Monday through Friday, 7:00 a.m. to 4:00 p.m. Fax: 719-346-8397. Building permits are administered directly by City Hall administrative staff (no separate, dedicated Building Division or named Building Official is published) — the Building Permit Application lists Jim Keehne, City Administrator, as the responsible city officer, with a Public Works signoff line also present on the form.. Official information: https://www.burlingtoncolo.com/151/Building-Permits.

Burlington, Colorado has adopted: NONE LOCALLY ADOPTED — verified directly from the City's own Building Permit Application form (DocumentCenter/View/187), which the applicant must sign: 'I hereby agree and understand that City of Burlington has not adopted a building code and it is my responsibility to follow all state guidelines regarding state building codes, local building codes and all inspections the State of Colorado, City of Burlington and the Colorado Department of Local Affairs and Housing may require.'; The City's own Building Codes webpage (burlingtoncolo.com/96/Building-Codes) independently corroborates this: it states the City 'requires all buildings to meet the compliance standards of the State of Colorado's building codes' and links to the Colorado Office of the State Architect (OSA) building-codes page (osa.colorado.gov/state-buildings/building-codes) — but that OSA page was checked directly and its adopted-code list applies ONLY to state-owned/state-lease-purchased construction and specific state-assisted categories (K-12 schools, health facilities), NOT to private construction in municipalities. Burlington's own reference to it therefore does not establish any specific IBC/IRC/IECC/NEC edition as locally adopted or locally enforced for private building permits — it is effectively a pointer to a source that does not govern ordinary residential/commercial permits in Burlington.; Net effect: Burlington has NO locally adopted model code edition (no IBC, IRC, IMC, IPC, IFGC, IECC, IFC, IEBC, or NEC edition/year is specified anywhere in the City's own building-permit materials). Applicants are directed to follow 'state guidelines' generally and Colorado Department of Local Affairs (DOLA)/Division of Housing requirements where applicable, rather than a codified local building code. This is a genuinely verified absence, not an omission — confirmed by the primary-source application form language plus the City's own Building Codes page, and consistent with Burlington's Municode-hosted Code of Ordinances not surfacing any building-code-adoption ordinance in available search results (Municode's Burlington library page is a JavaScript-rendered single-page app that could not be crawled for full-text search during this research; the City's own Ordinances & Resolutions page listing recent ordinance numbers did not show a building-code-adoption ordinance among currently listed items).. Local amendments apply — see the Burlington overview page for the full list.

Yes. Part B of the combined Building Permit/Zoning Compliance Application specifically captures Change of Use (present use, proposed use, current zoning, and annexation/petition status), distinct from Part A's construction-scope fields.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Burlington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Burlington.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.