Commercial Tenant Improvement / Nonresidential Permit — Brighton, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://brightonco.gov/DocumentCenter/View/30458
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Tenant Improvement / Nonresidential Permit in Brighton, Colorado
Required for commercial, industrial, retail, and other nonresidential building permits in Brighton, including tenant improvements (TI). Reviewed under the 2021 IBC as locally adopted. A higher plan review deposit applies for larger-scope commercial/industrial/multi-unit projects and TIs.
Verified 2026-07-06 · Source
When you need this permit
- Plans must comply with the 2021 IBC as adopted by the City of Brighton
- Permit Checklist: Com, Ind, MF document set applies
- $500.00 plan review deposit due at application submittal for new Commercial/Industrial/Multi-unit plan review or TIs greater than $25,000 in valuation
- Temporary Certificate of Occupancy available for commercial projects at $200.00, with $100.00 for each 30-day renewal
- Foundation Only Permit available for commercial projects at a flat $600.00
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Foundation
Before concrete pour
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans and applicable codes; required for Certificate of Occupancy issuance
See the full Brighton inspection guide — scheduling & re-inspection fees →
Tips
- Tenant improvements over $25,000 in valuation trigger the higher $500 plan review deposit (vs. $200 for custom residential) — budget this cash-flow timing into your project schedule.
- A Foundation Only Permit ($600 flat) lets commercial projects start foundation work before the full building plan set is approved — useful for fast-tracking site work on larger commercial builds.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Checklists & handouts
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Brighton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Brighton.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Brighton's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Brighton yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Brighton lands. Privacy.
Other permits in Brighton
Commercial Tenant Improvement / Nonresidential Permit in other cities
Compare commercial tenant improvement / nonresidential permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Brighton project checklist
Describe your project once and get every permit, document, and fee it triggers in Brighton — in one checklist. Free, for any city and any number of projects.
Get started →