Brighton building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Brighton, Colorado.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
500 S 4th Avenue, Brighton, CO 80601
Phone
303-655-2017
Office hours
City of Brighton main line 303-655-2000; Building Permit Counter direct line 303-655-2017; Homeowner Inspection Line 303-655-2151; Community Development general line 303-655-2072. City Hall closes at noon on Fridays, and all Community Development functions (planning and zoning, permitting and inspections) end at noon on Fridays as well.

Inspection sequence

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Foundation (if new foundation required)

    Before concrete pour

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment, especially where utility services are being extended or upsized

  4. 4

    Final Inspection

    All work complete per approved plans and applicable codes

Applies to: Change of Occupancy / Change of Use Permit

  1. 1

    Zoning Use-Conformance Review

    Planning Division confirms, via a Zoning Verification Letter, that the newly proposed use is allowed within the property's zoning district

  2. 2

    Fire Final Inspection / Approval

    Brighton Fire Rescue District approval logged in the City's OpenGov system, required per the Commercial CO checklist

  3. 3

    Building Final Inspection(s)

    Verifies compliance with applicable code for the newly proposed use; required per the Commercial CO checklist

  4. 4

    Certificate of Occupancy Issuance

    Final step once Fire, Public Works, Planning approvals and all Building final inspections are recorded and related permits closed; per the City's own Commercial CO checklist, 'COs or related comments can take up to 48 hours and cannot be processed at the counter'

Applies to: Commercial Tenant Improvement / Nonresidential Permit

  1. 1

    Foundation

    Before concrete pour

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans and applicable codes; required for Certificate of Occupancy issuance

Applies to: Residential Addition / Interior Remodel Permit

  1. 1

    Foundation (additions with new footings only)

    Before concrete pour, per 36-inch minimum frost line depth

  2. 2

    Rough Frame

    Framing complete, connection to existing structure verified

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation

    Before concrete pour, per 36-inch minimum frost line depth

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans and applicable codes

Applies to: Deck / Covered Patio Permit

  1. 1

    Footing/Foundation

    Before concrete pour, for decks with footings

  2. 2

    Framing

    Ledger attachment (if applicable), joists, and structural connections before decking installed

  3. 3

    Final Inspection

    Completed deck/patio, guardrails, and stairs verified per code

Applies to: Demolition Permit

  1. 1

    Pre-Demolition (utility disconnect verification)

    Confirms water, sewer, gas, and electric services have been properly disconnected/capped

  2. 2

    Final Inspection

    Site cleared and graded per approved scope

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized and verified

Applies to: Fire Sprinkler and Fire Alarm System Permit

  1. 1

    Rough & Hydrostatic Inspection (fire sprinkler)

    Completed together, before concealment, per BFRD's fee schedule

  2. 2

    Final Inspection

    BFRD final sign-off; required before the City of Brighton will finalize a Certificate of Occupancy for the building

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

Applies to: Rooftop Solar Photovoltaic (PV) Permit

  1. 1

    Rough Inspection

    Photo-documented: roof flashing, hold-downs, rail system, junction boxes, bonding, structural upgrades

  2. 2

    Final Inspection

    System energized, electrical connections and labeling verified

Applies to: Sign Permit

  1. 1

    Pre-Installation Site Inspection

    The Director is authorized to inspect the proposed sign location prior to acting on the application, per LUDC 9.02.B.4

  2. 2

    Final Inspection

    Verifies the constructed sign complies with the approved permit and LUDC Article 9 standards, including electrical compliance if illuminated

Re-inspection fees

Electrical PermitRe-inspection Fee · Per established policy authorized by the Building Official
$100.00
Fire Sprinkler and Fire Alarm System PermitRe-inspection Fee · Brighton Fire Rescue District Information Review and Inspection Fee Schedule, September 2025, Re-inspection Fee table
$100.00 per inspection

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Brighton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Brighton building permits

Get alerts for Brighton

We'll email you when Brighton's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.