Brighton building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Brighton, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 500 S 4th Avenue, Brighton, CO 80601
- Phone
- 303-655-2017
- 1stop@brightonco.gov
- Office hours
- City of Brighton main line 303-655-2000; Building Permit Counter direct line 303-655-2017; Homeowner Inspection Line 303-655-2151; Community Development general line 303-655-2072. City Hall closes at noon on Fridays, and all Community Development functions (planning and zoning, permitting and inspections) end at noon on Fridays as well.
- Website
- Official site
Inspection sequence
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation (if new foundation required)
Before concrete pour
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment, especially where utility services are being extended or upsized
- 4
Final Inspection
All work complete per approved plans and applicable codes
Applies to: Commercial Tenant Improvement / Nonresidential Permit
- 1
Foundation
Before concrete pour
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans and applicable codes; required for Certificate of Occupancy issuance
Applies to: Residential Addition / Interior Remodel Permit
- 1
Foundation (additions with new footings only)
Before concrete pour, per 36-inch minimum frost line depth
- 2
Rough Frame
Framing complete, connection to existing structure verified
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans
Applies to: Residential Building Permit (New Construction)
- 1
Foundation
Before concrete pour, per 36-inch minimum frost line depth
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans and applicable codes
Applies to: Deck / Covered Patio Permit
- 1
Footing/Foundation
Before concrete pour, for decks with footings
- 2
Framing
Ledger attachment (if applicable), joists, and structural connections before decking installed
- 3
Final Inspection
Completed deck/patio, guardrails, and stairs verified per code
Applies to: Demolition Permit
- 1
Pre-Demolition (utility disconnect verification)
Confirms water, sewer, gas, and electric services have been properly disconnected/capped
- 2
Final Inspection
Site cleared and graded per approved scope
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel installed before concealment
- 2
Final Inspection
Devices installed, panel labeled, system energized and verified
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
Applies to: Rooftop Solar Photovoltaic (PV) Permit
- 1
Rough Inspection
Photo-documented: roof flashing, hold-downs, rail system, junction boxes, bonding, structural upgrades
- 2
Final Inspection
System energized, electrical connections and labeling verified
Final inspection only: Electric Vehicle Charging Station (EVCS/EVSE) Permit, Roofing Permit (Re-Roof)
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Brighton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Brighton building permits
Get alerts for Brighton
We'll email you when Brighton's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.