When you need this permit

  • Governed by the 2021 IRC/IBC as adopted by the City of Brighton
  • Per the City's Climatic and Geographic Design Criteria sheet, Ice Barrier Required: NO — this is a materially lighter requirement than higher-elevation/mountain Colorado jurisdictions
  • Contractor must hold an applicable City of Brighton contractor license (Class A, B, C, or E-Roofing specialty trade, per Article 15-16-50(5)) Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based, same schedule as new construction)No separate flat re-roof fee is published; billed under the general unified valuation-based Permit Fee schedule
$23.50 minimum, scaling per the valuation tiers in the 2026 Community Development Fee Schedule
Plan Review Fee
65% of Permit Fee (if plan review is required)
Construction Use Tax
3.75% of 50% of total project valuation

Review timeline

Plan review
Not published — contact the department

How long did your Roofing Permit (Re-Roof) permit actually take in Brighton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (roof)

    Completed roof — material and flashing/valley compliance verified per the 2021 IRC/IBC as adopted

See the full Brighton inspection guide — scheduling & re-inspection fees →

Tips

  • Unlike many higher-elevation Colorado mountain jurisdictions, Brighton's own design criteria sheet states Ice Barrier Required: NO — don't over-spec ice-and-water-shield underlayment assuming a statewide requirement; confirm current code-cycle requirements with the Permitting Division for your specific roof pitch and material.

Frequently asked questions

Brighton requires a roofing permit (re-roof) for: Governed by the 2021 IRC/IBC as adopted by the City of Brighton; Per the City's Climatic and Geographic Design Criteria sheet, Ice Barrier Required: NO — this is a materially lighter requirement than higher-elevation/mountain Colorado jurisdictions; Contractor must hold an applicable City of Brighton contractor license (Class A, B, C, or E-Roofing specialty trade, per Article 15-16-50(5)). If your project isn't listed, confirm with City of Brighton Community Development Department, Permitting Division at 303-655-2017 before starting work.

In Brighton, the published Building Permit Fee (valuation-based, same schedule as new construction) is: $23.50 minimum, scaling per the valuation tiers in the 2026 Community Development Fee Schedule. Additional published fees: Plan Review Fee — 65% of Permit Fee (if plan review is required); Construction Use Tax — 3.75% of 50% of total project valuation. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Brighton does not publish a plan-review timeline for this permit. Contact City of Brighton Community Development Department, Permitting Division at 303-655-2017 for current turnaround.

You'll need: Building Permit Application — Re-Roof scope. See the required-documents checklist on this page for details on each.

Brighton requires 1 inspection(s) for a roofing permit (re-roof), in order: Final Inspection (roof). Schedule each through City of Brighton Community Development Department, Permitting Division (303-655-2017).

Apply through City of Brighton Community Development Department, Permitting Division at 500 S 4th Avenue, Brighton, CO 80601. Phone: 303-655-2017, email: 1stop@brightonco.gov. Office hours: City of Brighton main line 303-655-2000; Building Permit Counter direct line 303-655-2017; Homeowner Inspection Line 303-655-2151; Community Development general line 303-655-2072. City Hall closes at noon on Fridays, and all Community Development functions (planning and zoning, permitting and inspections) end at noon on Fridays as well.. Official information: https://www.brightonco.gov/222/Permitting.

Brighton, Colorado has adopted: 2021 International Building Code (IBC) — City of Brighton 'Building Code Editions, Design Loads, Etc.' sheet, Codes & Information page; 2021 International Residential Code (IRC); 2021 International Mechanical Code (IMC); 2021 International Plumbing Code (IPC); 2021 International Fuel Gas Code (IFGC); 2021 International Fire Code (IFC); 2021 International Energy Conservation Code (IECC); 2021 International Property Maintenance Code (IPMC); 2021 International Existing Building Code (IEBC); 2021 International Swimming Pool and Spa Code (ISPSC); 2023 National Electrical Code (NEC); ICC A117-17 (Accessible and Usable Buildings and Facilities); Effective date of the 2021 I-Code revisions: January 1, 2023. Effective date of the 2023 NEC adoption: July 1, 2023 — both per the City's own published 'Building Code Editions, Design Loads, Etc.' sheet (Codes & Information page), which is treated as the current, governing adopted-code list for this file.; Note on code-page currency: Brighton's Municode-hosted Chapter 15, Article 15-12 ('National Electrical Code') still codifies the '2005 National Electrical Code' verbatim in its Municode text — this is a known lag between the codified ordinance text on Municode and the live, actively-maintained Codes & Information page, which explicitly states the 2023 NEC is adopted effective 7/1/2023. The live department page is treated as authoritative for current code edition, consistent with the same lag pattern documented for other Colorado home-rule jurisdictions in this corpus (e.g. Vail's Minimum Submittal Requirements PDFs).. Local amendments apply — see the Brighton overview page for the full list.

No. The City of Brighton's published Climatic and Geographic Design Criteria sheet explicitly states 'Ice Barrier Required: NO,' reflecting Brighton's lower-elevation Front Range climate compared to Colorado's mountain jurisdictions.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Brighton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.