Roofing Permit in Bow Mar, Colorado

A separate permit is required for roofing projects in Bow Mar, governed by the Town's own 'Code Requirements for Residential Roofs' page (referencing IRC 2015-cycle section numbering R904-R907 at time of this review, alongside the Town's current 2021 IRC adoption) with several local amendments including drip-edge and ice-barrier requirements.

Reviewed 2026-07-06 · Source

When you need this permit

  • Roofing Permit Application required for new roof installation or roof repairs
  • If the roofing project includes structural changes to the roof, the Building Permit Application with Plan Review is ALSO required
  • Mid-Roof Inspection required at 25% of installation completion
  • Maximum number of layers: 1 layer shingle, 2 layers flat roofing material
  • Minimum wind speed rating: 6-nail all, 90 mph (ASTM/UL D3161)
  • Ice Barrier shall extend from the eave's edge to a point at least 24 inches inside the exterior (heated) wall line, for all new roof tear-offs
  • Underlayment required: #15 felt up to 6/12 slope, #30 felt for 7/12 and above; 2 layers of underlayment required for slopes between 2/12 and 4/12
  • Valley size minimum 18 inches, 90 lb. or metal permitted
  • Solid sheeting (plywood/OSB) required over plank decking, meeting manufacturer specs to maintain material warranty
  • Roof ventilation: total net free area not less than 1 sq ft of roof vents per 150 sq ft of roof area (soffit vents allowed)
  • Locally amended drip-edge requirement (amendment to Sec. R903.2, adding new R905.2.2): drip edge required at eaves and gables of shingle roofs, minimum 2-inch overlap, extending 1.5 inches below sheathing and 2 inches back onto the roof, mechanically fastened at a maximum 12 inches on center
  • A Cricket or Saddle required on the ridge side of any chimney greater than 30 inches wide, matching metal or roof-covering material

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Roofing Permit FeeThe Roof Specifications page describes code requirements but does not state a specific roofing-permit fee; the general valuation-based Building Permit Fee table on the Building Permit Fees page likely applies but is not explicitly cross-referenced for roofing on that page
Not separately published on the Town's Flat Fee Schedule or Building Permit Fees page as of this review

Review timeline

Plan review
Not published — contact the department

How long did your Roofing Permit permit actually take in Bow Mar?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Mid-Roof Inspection

    Required at 25% of installation

  2. 2

    Final Inspection

See the full Bow Mar inspection guide — scheduling & re-inspection fees →

Tips

  • Bow Mar's published Roof Specifications page still cites 2015-cycle IRC section numbers (R904-R907) even though Ordinance No. 340 updated the Town's general code adoption to the 2021 IRC — treat the specific numeric/technical roofing requirements (ice barrier extension, underlayment layers, wind rating, drip edge amendment) as the governing technical detail regardless of the cycle-number label, since these are the Town's actively published, dedicated roofing-code page.
  • A Mid-Roof Inspection at 25% completion is a distinct requirement beyond the standard final inspection — schedule this checkpoint in your project timeline.
  • The roofing permit fee itself is not clearly published as a specific dollar figure separate from the general valuation table — confirm the applicable fee with the Building Department before submitting.

Frequently asked questions

Yes, a dedicated Roofing Permit Application is required. If the project also involves structural changes to the roof, the Building Permit Application with Plan Review is required in addition.

In Bow Mar, the published Roofing Permit Fee is: Not separately published on the Town's Flat Fee Schedule or Building Permit Fees page as of this review. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Bow Mar does not publish a plan-review timeline for this permit. Contact Town of Bow Mar Building Department at 303-795-2063 for current turnaround.

You'll need: Roofing Permit Application. Depending on your project, Bow Mar may also ask for: Building Permit Application with Plan Review. See the required-documents checklist on this page for details on each.

Bow Mar requires 2 inspection(s) for a roofing permit, in order: Mid-Roof Inspection, Final Inspection. Schedule each through Town of Bow Mar Building Department (303-795-2063).

Apply through Town of Bow Mar Building Department at 2 Middlefield Road, Columbine Valley, CO 80123. Phone: 303-795-2063, email: bzapata-diaz@columbinevalley.org. Office hours: 8:00am - 4:00pm, Monday through Friday (Building Department office, per the Town's live Building Permits page; the page notes these hours 'will be shortened due to COVID-19' — an apparently stale caveat still present on the live page as of this review). Building Department Coordinator Bonnie Zapata-Diaz. Bow Mar Building Inspector Terry Weis (reviews all plans and conducts all inspections) direct line 303-522-3331.. Official information: https://www.townofbowmar.org/building-permits.

Bow Mar, Colorado has adopted: 2021 International Building Code (IBC), including all Appendices — Bow Mar Municipal Code Sec. 18-8, adopted by Ordinance No. 340 (executed February 26, 2024); 2021 International Residential Code (IRC), including all Appendices, with local amendments — Sec. 18-9; 2021 International Mechanical Code (IMC) — Sec. 18-10; 2021 International Plumbing Code (IPC) — Sec. 18-11; 2021 International Fuel Gas Code (IFGC) — Sec. 18-12; 2021 International Property Maintenance Code (IPMC) — Sec. 18-13; 2021 International Fire Code (IFC), including Appendices B, C, and D, with local amendments — Sec. 18-14; 2021 International Energy Conservation Code (IECC) — Sec. 18-15; 2021 International Swimming Pool and Spa Code (ISPSC) — Sec. 18-16; 2021 International Existing Building Code (IEBC) — Sec. 18-17; ASME A17.1-2022 Safety Code for Elevators and Escalators — Sec. 18-18; National Electrical Code (NFPA 70), 'as currently adopted by the State of Colorado or as is from time to time modified, re-enacted, or re-adopted by the State of Colorado' — Sec. 18-19. This is a dynamic, floating adoption clause (not a fixed local edition); the Town's own Non-Structural Building Permit Application form states in writing that 'The Town of Bow Mar has adopted the 2021 International Building Code and the 2023 National Electric Code,' confirming the 2023 NEC is the currently-referenced edition as of this review.; All codes adopted via Ordinance No. 340, 'AN ORDINANCE OF THE BOARD OF TRUSTEES OF THE TOWN OF BOW MAR AMENDING CHAPTER 18 OF THE BOW MAR MUNICIPAL CODE BY THE ADOPTION OF VARIOUS REGULATIONS FROM THE INTERNATIONAL CODE COUNCIL, THE NATIONAL FIRE PROTECTION ASSOCIATION, AND THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS,' which repealed and replaced the prior 2015-edition code set (the ordinance's own recitals state Chapter 18 'previously adopted the 2015 edition of various codes published by the ICC') — full ordinance text retrieved directly as a PDF from the Town's website.. Local amendments apply — see the Bow Mar overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bow Mar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.