Roofing Permit in Bow Mar, Colorado
A separate permit is required for roofing projects in Bow Mar, governed by the Town's own 'Code Requirements for Residential Roofs' page (referencing IRC 2015-cycle section numbering R904-R907 at time of this review, alongside the Town's current 2021 IRC adoption) with several local amendments including drip-edge and ice-barrier requirements.
Reviewed 2026-07-06 · Source
When you need this permit
- Roofing Permit Application required for new roof installation or roof repairs
- If the roofing project includes structural changes to the roof, the Building Permit Application with Plan Review is ALSO required
- Mid-Roof Inspection required at 25% of installation completion
- Maximum number of layers: 1 layer shingle, 2 layers flat roofing material
- Minimum wind speed rating: 6-nail all, 90 mph (ASTM/UL D3161)
- Ice Barrier shall extend from the eave's edge to a point at least 24 inches inside the exterior (heated) wall line, for all new roof tear-offs
- Underlayment required: #15 felt up to 6/12 slope, #30 felt for 7/12 and above; 2 layers of underlayment required for slopes between 2/12 and 4/12
- Valley size minimum 18 inches, 90 lb. or metal permitted
- Solid sheeting (plywood/OSB) required over plank decking, meeting manufacturer specs to maintain material warranty
- Roof ventilation: total net free area not less than 1 sq ft of roof vents per 150 sq ft of roof area (soffit vents allowed)
- Locally amended drip-edge requirement (amendment to Sec. R903.2, adding new R905.2.2): drip edge required at eaves and gables of shingle roofs, minimum 2-inch overlap, extending 1.5 inches below sheathing and 2 inches back onto the roof, mechanically fastened at a maximum 12 inches on center
- A Cricket or Saddle required on the ridge side of any chimney greater than 30 inches wide, matching metal or roof-covering material
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Mid-Roof Inspection
Required at 25% of installation
- 2
Final Inspection
See the full Bow Mar inspection guide — scheduling & re-inspection fees →
Tips
- Bow Mar's published Roof Specifications page still cites 2015-cycle IRC section numbers (R904-R907) even though Ordinance No. 340 updated the Town's general code adoption to the 2021 IRC — treat the specific numeric/technical roofing requirements (ice barrier extension, underlayment layers, wind rating, drip edge amendment) as the governing technical detail regardless of the cycle-number label, since these are the Town's actively published, dedicated roofing-code page.
- A Mid-Roof Inspection at 25% completion is a distinct requirement beyond the standard final inspection — schedule this checkpoint in your project timeline.
- The roofing permit fee itself is not clearly published as a specific dollar figure separate from the general valuation table — confirm the applicable fee with the Building Department before submitting.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bow Mar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Bow Mar
Roofing Permit in other cities
Compare roofing permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Bow Mar project checklist
Describe your project once and get every permit, document, and fee it triggers in Bow Mar — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →