Solar Photovoltaic (PV) Permit in Bow Mar, Colorado
Bow Mar has no separate solar/photovoltaic permit type; rooftop PV is permitted as a combined Building Permit (structural/racking, Town valuation-based fee table) and Electrical Permit (State of Colorado Electrical Board, since Bow Mar Municipal Code Sec. 18-6 directs applicants to the State Electrical Board for electrical permits, inspections, and fees rather than issuing them itself). As in every Colorado jurisdiction, the combined total of all governmental fees for the installation is capped by state law at $500 for a residential system and $1,000 for a commercial system (C.R.S. § 24-48.5-113, enacted by HB21-1284).
Verified 2026-07-20 · Source
When you need this permit
- Town Building Permit required for the structural/racking portion, billed under the Town's valuation-based Building Permit Fee schedule
- Electrical Permit for PV wiring/interconnection is not issued by the Town — Bow Mar Municipal Code Sec. 18-6 directs permit holders to the Colorado State Electrical Board (DORA) for electrical permits, inspections, and fees
- Work must comply with the 2023 NEC as adopted by Ordinance No. 340
- By statute (C.R.S. § 24-48.5-113 / HB21-1284), the aggregate of all permit fees and charges imposed by any Colorado governmental body (Town + State) for an active solar energy system installation is capped at $500 residential / $1,000 commercial
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Bow Mar inspection guide — scheduling & re-inspection fees →
Tips
- Bow Mar issues no electrical permits at all, for solar or otherwise — the Town's own ordinance directs applicants to the Colorado State Electrical Board (DORA) for the electrical/interconnection portion of a solar installation.
- By Colorado statute, the combined total of every governmental fee charged for a solar installation (Town + State) cannot exceed $500 for residential or $1,000 for commercial systems.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bow Mar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Bow Mar
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Colorado →