Change of Use / Change of Occupancy Permit (South Metro Fire Rescue) — Bow Mar, Colorado · Requirements sheet
Verified 2026-08-13 · Source: https://public.powerdms.com/SMFR/documents/3103612
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Change of Occupancy Permit (South Metro Fire Rescue) in Bow Mar, Colorado
Unlike several peer small Colorado towns in this corpus where a change-of-use inquiry hits a genuine dead end, Bow Mar's own Ordinance No. 340 added a NEW section to the locally-adopted 2021 IFC — Sec. 105.6.25 — that explicitly requires anyone who intends to 'change occupancy of a building' to first apply to and obtain a permit from the fire code official (South Metro Fire Rescue). South Metro Fire Rescue's own live fee schedule independently confirms this is a real, currently-administered permit category by listing a distinct 'Change of Use' line item with its own fee. Separately, and administered by the Town rather than SMFR, Bow Mar Municipal Code Sec. 18-7 requires a Certificate of Occupancy before any building may be occupied. Given Bow Mar's exclusively residential zoning and total absence of commercial districts, the realistic scope of a 'change of occupancy' scenario here is narrow — not the classic commercial-tenant occupancy-classification change this permit type is built around in mixed-use jurisdictions.
Verified 2026-08-13 · Source
When you need this permit
- Ordinance No. 340 adds a new IFC Sec. 105.6.25 ('Buildings and facilities'): 'Any owner or owner's authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change occupancy of a building, or structure, or facility...shall first make application to the fire code official and obtain the required permit' — the fire code official is South Metro Fire Rescue's Fire Marshal or designee (Sec. 103.1/103.2, also documented in this file's fire-sprinkler-alarm-permit entry)
- South Metro Fire Rescue's own published 'Systems and Other Fees' schedule lists a distinct 'Change of Use' line item with its own plan-check and inspection fee — independently confirming this is a real, currently-administered permit category, not merely dormant amendment language with no operative process
- Separately, and administered by the Town of Bow Mar (not SMFR): Municipal Code Sec. 18-7 requires a Certificate of Occupancy before any building may be occupied — 'Once all the inspections have been satisfactorily completed and the Building Department determines that a new home is ready for occupancy, the Building Department shall issue a certificate of occupancy. No building may be occupied or inhabited until a certificate of occupancy has been issued.' This Section is written in the context of new-home construction and does not separately spell out a change-of-occupancy CO workflow for an existing home distinct from the SMFR fire-code permit above — genuinely unclear from the published text how the two interact for a change-of-occupancy scenario specifically
- Given Bow Mar's exclusively residential zoning (Sec. 16-3's six districts; Sec. 16-11's town-wide prohibition on professional offices/commercial establishments outside an approved Planned Development), the realistic change-of-occupancy scenarios here are narrow — e.g. converting non-habitable accessory space to a different residential occupancy, or an occupancy change tied to an addition or remodel — not a commercial-tenant occupancy reclassification, since no such use exists anywhere in Town (see this file's NO COMMERCIAL PERMIT TRACK finding)
- Confirm with both South Metro Fire Rescue (via the Accela Permit Portal) and the Town of Bow Mar Building Department which permit intake governs a specific proposed change, since this permit sits at the intersection of SMFR's fire-code review and the Town's own Building Permit/Certificate of Occupancy process, and no single published document walks through the combined workflow
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
SMFR Occupancy Compliance Review
South Metro Fire Rescue reviews the proposed change of occupancy against applicable fire-code requirements before permit issuance
- 2
Town of Bow Mar Certificate of Occupancy Inspection
Final inspection by the Town Building Department confirming the property is ready for occupancy under Sec. 18-7, if a new or updated Certificate of Occupancy is required as part of the change
See the full Bow Mar inspection guide — scheduling & re-inspection fees →
Tips
- Bow Mar's change-of-use mechanism is genuinely a FIRE-code permit (via South Metro Fire Rescue's Sec. 105.6.25 amendment), not a Town Building Department or Zoning permit — an unusual structural choice worth knowing, since most peer small Colorado towns in this corpus (e.g. Blue River, Bennett) have no standalone change-of-use process at all, while Bow Mar created a real one, but housed it in the fire code rather than the zoning or building code.
- Given the Town's total absence of commercial zoning, don't expect a business/tenant occupancy-reclassification scenario here — the practical Bow Mar use case is closer to a residential occupancy change tied to an addition, an accessory-space conversion, or similar scope.
- SMFR's own fee schedule prices 'Change of Use' as a distinct line item from its ordinary new-construction/tenant-improvement fire-protection review — confirm with SMFR directly whether a specific project needs this standalone permit or is already covered by the new-construction review documented in this file's fire-sprinkler-alarm-permit entry.
- The interaction between SMFR's fire-code change-of-occupancy permit and the Town's own Sec. 18-7 Certificate of Occupancy requirement is not spelled out in a single published document — budget time to coordinate directly with both the Town Building Department and SMFR rather than assuming one permit covers the other.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bow Mar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Bow Mar
Change of Use / Change of Occupancy Permit (South Metro Fire Rescue) in other cities
Compare change of use / change of occupancy permit (south metro fire rescue) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Bow Mar project checklist
Describe your project once and get every permit, document, and fee it triggers in Bow Mar — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →