Residential Building Permit (New Construction) in Bow Mar, Colorado
Required for new single-family residential construction in Bow Mar. Reviewed under the 2021 IRC as locally amended (Sec. 18-9), plus the Town's Table R301.2(1) design criteria (30 psf roof snow load, 110/140 mph wind speeds, 36-inch frost depth). Requires Design Review Board (DRB) approval before submittal, is administered day-to-day out of the shared Columbine Valley Town Hall office, and is issued under Bow Mar's own Municipal Code Chapter 18.
Verified 2026-07-06 · Source
When you need this permit
- Design Review Board (DRB) approval required BEFORE building permit submittal for any exterior work — DRB meets the 2nd Tuesday of each month at 7:00 PM
- Plans must comply with the 2021 IRC as locally amended, and meet the Town's Table R301.2(1) design criteria: 30 psf roof snow load, 110 mph nominal / 140 mph ultimate wind speed, 36-inch frost depth, Seismic Design Category B, Severe weathering, 1 degree F winter design temperature
- Site-specific soils report by a Colorado-registered geo-technical engineer required with the application for all new habitable structures (amended R401.4)
- Two (2) sets of construction drawings (24"x36") required: plot plan, landscape/civil drawings, mechanical/electrical/plumbing drawings, structural drawings stamped by a Colorado-licensed professional engineer
- Drainage plan by a licensed engineer required for any new home, analyzing drainage effects on the subject property and adjacent properties
- All contractors (General Contractor and any subcontracted trades) must hold current Town of Bow Mar contractor registration; plumbers and electricians must additionally hold current Colorado state licenses Contractor
- Projects valued at $50,000 or more require a detailed line-item Schedule of Values submitted with the application
- A photometric (lighting) plan and permit required for new construction/major remodels valued over $250,000
- Application and plan sets submitted to the Town of Bow Mar Building Department office at 2 Middlefield Road, Columbine Valley, CO 80123 (shared office with the Town of Columbine Valley)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 6 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Location / Setback
Per Bow Mar Ordinance Sec. 18-6 inspection list
- 2
Footings, Trenches, Caissons, Pads and Foundation Wall
- 3
Steel
- 4
Waterproofing
- 5
Ground Plumbing
- 6
Rough Plumbing
- 7
Rough Heating
- 8
Frame
- 9
Insulation
- 10
Drywall
- 11
Final Inspection
Required before Certificate of Occupancy is issued; no building may be occupied until a Certificate of Occupancy has been issued
See the full Bow Mar inspection guide — scheduling & re-inspection fees →
Tips
- DRB approval must be secured BEFORE building permit submittal for any exterior design element — the DRB meets only once a month (2nd Tuesday, 7:00 PM), so budget calendar time well ahead of your target permit-application date.
- Although the Building Department's office is physically located at Columbine Valley Town Hall, Bow Mar issues its own permits under its own Municipal Code Chapter 18 — do not assume Columbine Valley's fee schedule, adopted-code editions, or permit types apply; confirm requirements are Bow Mar-specific with Building Department Coordinator Bonnie Zapata-Diaz or Building Inspector Terry Weis.
- A site-specific soils report from a Colorado-registered geo-technical engineer is required for ALL new habitable structures in Bow Mar, reflecting the Town's amended IRC R401.4 addressing expansive/compressible/shifting soils.
- Projects valued at $50,000 or more require a detailed line-item Schedule of Values; understated valuations are subject to independent review at any time, with additional fees due before a Certificate of Occupancy can be issued (Bow Mar Ordinance 18-5(b)).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bow Mar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Bow Mar
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Bow Mar project checklist
Describe your project once and get every permit, document, and fee it triggers in Bow Mar — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →