EV Charger / EVSE Permit in Bow Mar, Colorado

Installation of an electric vehicle charger (EVSE) at a Bow Mar property is electrical work, and the Town of Bow Mar does not issue electrical permits at all — Municipal Code Sec. 18-6 directs all electrical permitting, inspection, and fees to the Colorado State Electrical Board (DORA), the same routing that applies to every other electrical trade permit in Bow Mar. There is no Town-issued EV-charger-specific permit or fee.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit obtained directly through the Colorado State Electrical Board (DORA), not the Town of Bow Mar, per Bow Mar Municipal Code Sec. 18-6
  • Installation performed by a Colorado-licensed electrical contractor
  • Dedicated branch circuit sized to EVSE manufacturer specifications, complying with the applicable NEC edition adopted by the State of Colorado
  • If the EVSE installation involves any exterior structural work (e.g., a new dedicated equipment enclosure or mounting structure), a separate Town of Bow Mar Non-Structural or Structural Building Permit and Design Review Board approval may also be required for that portion of the work

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit FeeSame routing as Bow Mar's general Electrical Permit — Bow Mar Municipal Code Sec. 18-6 directs applicants to DORA for permits, inspections, and fees; no Town-level fee applies to the EVSE circuit itself
Set by the Colorado State Electrical Board (DORA), not the Town of Bow Mar

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Bow Mar?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Electrical Inspection

    Conducted under DORA's electrical inspection program, not a Town of Bow Mar inspection

See the full Bow Mar inspection guide — scheduling & re-inspection fees →

Tips

  • Do not contact the Town of Bow Mar Building Department for an EV charger/EVSE permit — electrical work of any kind, including EVSE circuits, is routed entirely to the Colorado State Electrical Board (DORA), the same as Bow Mar's general Electrical Permit.
  • If the installation also involves exterior structural work, that portion may still require a Town Non-Structural or Structural Building Permit and Design Review Board approval — the DORA routing applies specifically to the electrical trade permit.

Frequently asked questions

Bow Mar requires an ev charger / evse permit for: Electrical permit obtained directly through the Colorado State Electrical Board (DORA), not the Town of Bow Mar, per Bow Mar Municipal Code Sec. 18-6; Installation performed by a Colorado-licensed electrical contractor; Dedicated branch circuit sized to EVSE manufacturer specifications, complying with the applicable NEC edition adopted by the State of Colorado; If the EVSE installation involves any exterior structural work (e.g., a new dedicated equipment enclosure or mounting structure), a separate Town of Bow Mar Non-Structural or Structural Building Permit and Design Review Board approval may also be required for that portion of the work. If your project isn't listed, confirm with Town of Bow Mar Building Department at 303-795-2063 before starting work.

In Bow Mar, the published Electrical Permit Fee is: Set by the Colorado State Electrical Board (DORA), not the Town of Bow Mar. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Bow Mar does not publish a plan-review timeline for this permit. Contact Town of Bow Mar Building Department at 303-795-2063 for current turnaround.

You'll need: Colorado State Electrical Board (DORA) Electrical Permit Application. See the required-documents checklist on this page for details on each.

Bow Mar requires 1 inspection(s) for an ev charger / evse permit, in order: State Electrical Inspection. Schedule each through Town of Bow Mar Building Department (303-795-2063).

Apply through Town of Bow Mar Building Department at 2 Middlefield Road, Columbine Valley, CO 80123. Phone: 303-795-2063, email: bzapata-diaz@columbinevalley.org. Office hours: 8:00am - 4:00pm, Monday through Friday (Building Department office, per the Town's live Building Permits page; the page notes these hours 'will be shortened due to COVID-19' — an apparently stale caveat still present on the live page as of this review). Building Department Coordinator Bonnie Zapata-Diaz. Bow Mar Building Inspector Terry Weis (reviews all plans and conducts all inspections) direct line 303-522-3331.. Official information: https://www.townofbowmar.org/building-permits.

Bow Mar, Colorado has adopted: 2021 International Building Code (IBC), including all Appendices — Bow Mar Municipal Code Sec. 18-8, adopted by Ordinance No. 340 (executed February 26, 2024); 2021 International Residential Code (IRC), including all Appendices, with local amendments — Sec. 18-9; 2021 International Mechanical Code (IMC) — Sec. 18-10; 2021 International Plumbing Code (IPC) — Sec. 18-11; 2021 International Fuel Gas Code (IFGC) — Sec. 18-12; 2021 International Property Maintenance Code (IPMC) — Sec. 18-13; 2021 International Fire Code (IFC), including Appendices B, C, and D, with local amendments — Sec. 18-14; 2021 International Energy Conservation Code (IECC) — Sec. 18-15; 2021 International Swimming Pool and Spa Code (ISPSC) — Sec. 18-16; 2021 International Existing Building Code (IEBC) — Sec. 18-17; ASME A17.1-2022 Safety Code for Elevators and Escalators — Sec. 18-18; National Electrical Code (NFPA 70), 'as currently adopted by the State of Colorado or as is from time to time modified, re-enacted, or re-adopted by the State of Colorado' — Sec. 18-19. This is a dynamic, floating adoption clause (not a fixed local edition); the Town's own Non-Structural Building Permit Application form states in writing that 'The Town of Bow Mar has adopted the 2021 International Building Code and the 2023 National Electric Code,' confirming the 2023 NEC is the currently-referenced edition as of this review.; All codes adopted via Ordinance No. 340, 'AN ORDINANCE OF THE BOARD OF TRUSTEES OF THE TOWN OF BOW MAR AMENDING CHAPTER 18 OF THE BOW MAR MUNICIPAL CODE BY THE ADOPTION OF VARIOUS REGULATIONS FROM THE INTERNATIONAL CODE COUNCIL, THE NATIONAL FIRE PROTECTION ASSOCIATION, AND THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS,' which repealed and replaced the prior 2015-edition code set (the ordinance's own recitals state Chapter 18 'previously adopted the 2015 edition of various codes published by the ICC') — full ordinance text retrieved directly as a PDF from the Town's website.. Local amendments apply — see the Bow Mar overview page for the full list.

No. The Town of Bow Mar does not issue electrical permits of any kind, including for EV charger/EVSE installations. Municipal Code Sec. 18-6 directs all electrical permitting to the Colorado State Electrical Board (DORA).

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bow Mar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.