EV Charger / EVSE Permit in Bow Mar, Colorado
Installation of an electric vehicle charger (EVSE) at a Bow Mar property is electrical work, and the Town of Bow Mar does not issue electrical permits at all — Municipal Code Sec. 18-6 directs all electrical permitting, inspection, and fees to the Colorado State Electrical Board (DORA), the same routing that applies to every other electrical trade permit in Bow Mar. There is no Town-issued EV-charger-specific permit or fee.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit obtained directly through the Colorado State Electrical Board (DORA), not the Town of Bow Mar, per Bow Mar Municipal Code Sec. 18-6
- Installation performed by a Colorado-licensed electrical contractor
- Dedicated branch circuit sized to EVSE manufacturer specifications, complying with the applicable NEC edition adopted by the State of Colorado
- If the EVSE installation involves any exterior structural work (e.g., a new dedicated equipment enclosure or mounting structure), a separate Town of Bow Mar Non-Structural or Structural Building Permit and Design Review Board approval may also be required for that portion of the work
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Inspection
Conducted under DORA's electrical inspection program, not a Town of Bow Mar inspection
See the full Bow Mar inspection guide — scheduling & re-inspection fees →
Tips
- Do not contact the Town of Bow Mar Building Department for an EV charger/EVSE permit — electrical work of any kind, including EVSE circuits, is routed entirely to the Colorado State Electrical Board (DORA), the same as Bow Mar's general Electrical Permit.
- If the installation also involves exterior structural work, that portion may still require a Town Non-Structural or Structural Building Permit and Design Review Board approval — the DORA routing applies specifically to the electrical trade permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bow Mar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Bow Mar
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →