Commercial Alteration / Tenant Improvement Permit in Castle Pines, Colorado
Required for commercial tenant finish and alteration work. Listed as 'Commercial Alteration' on the City's Building Permit Application; categorized under the Plan Review Permit track with the City's longer 10-business-day commercial review timeline.
Verified 2026-08-02 · Source
When you need this permit
- Listed as 'Commercial Alteration' on the Building Permit Application (distinct checkbox from 'New Commercial')
- Plan Review Permit track: two identical scaled drawing sets required
- All contractors must hold applicable City of Castle Pines contractor licenses Contractor
- No Castle-Pines-specific tenant-improvement submittal checklist is published; the general Plan Review Permit submittal standard applies (site plan/floor plan/construction details as applicable to scope). The City's live Building Design Guides and Resources page lists guides for Additions, Residential Basement Finish, Pole Barns, Accessory Structures, Residential Swimming Pools, Uncovered Decks and Porches, Re-Roofing, Asbestos Testing and Abatement, and Residential Fire Sprinkler Systems only — no Commercial Alteration or Tenant Improvement guide is published. This is a confirmed absence on the current page, not an inference.
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
2026 Fee Schedule (effective document dated May 2026), Building section, 'Building Permit Fees' table. Show full citationHide
2026 Fee Schedule (effective document dated May 2026), Building section, 'Building Permit Fees' table. This valuation-tier table is a single unified schedule that is NOT split by residential vs. commercial — the City's own fee-schedule PDF shows only one 'Building Permit Fees' table under the BUILDING section heading, immediately followed by a separately-labeled 'Electrical Permit Fees' line ('As outlined by State Statute'), which IS explicitly the only building-related fee split by residential/commercial in this schedule. Commercial tenant-improvement valuation fees therefore follow the same table as residential, not a different one. Independently corroborated by the City's Building Permit Application form (PDF), whose 'For Office Use Only' fee-assessment block (Building Permit Fee / Plan Review Fee / Zoning Fee / Castle Pines Tax / Douglas County Tax) is a single shared set of fields used regardless of which Permit Type checkbox is selected, including 'Commercial Alteration.'2026 Fee Schedule, Building Permit Fees table, page 5. Show full citationHide
2026 Fee Schedule, Building Permit Fees table, page 5. The published row closes with “up to and including $100,000.00”, repeating the ceiling of the tier below it; every other tier closes at its own ceiling, so the $500,000.00 bound recorded here reads the table as the City evidently intends. Confirm with the City before relying on it for a project near the tier boundary.Review timeline
Inspection process
- 1
Rough Trade
Electrical/mechanical/plumbing rough-in prior to concealment
- 2
Final Inspection
After tenant improvement work is completed
See the full Castle Pines inspection guide — scheduling & re-inspection fees →
Tips
- Commercial plan review in Castle Pines is published at up to 10 business days, double the 5-day residential timeline — plan tenant-improvement schedules accordingly.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-02.
Fee schedules
Applications & forms
Checklists & handouts
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Castle Pines building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Castle Pines.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Property Access
Castle Pines's permit history is searchable by address
11,292 permits on record for Castle Pines, 2015–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
Other permits in Castle Pines
Commercial Alteration / Tenant Improvement Permit in other cities
Compare commercial alteration / tenant improvement permit fees across Colorado →