Castle Pines building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Castle Pines, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 7437 Village Square Drive, Suite 200, Castle Pines, CO 80108
- Phone
- 303-705-0227
- Office hours
- Monday through Thursday 8:00 a.m. to 12:00 p.m. and 1:00 p.m. to 4:30 p.m.; Friday 8:00 a.m. to 12:00 p.m. Fax 303-688-9414.
- Website
- Official site
Inspection sequence
Applies to: New Residential Building Permit
- 1
Foundation
After trenches excavated, reinforcement in place, forms erected, prior to concrete pour
- 2
Underground
Prior to covering any piping or wiring and prior to placing concrete
- 3
Rough Trade (plumbing/mechanical/electrical)
After rough installation complete, prior to covering; may be combined with rough frame
- 4
Rough Frame
After roof, framing, fire stopping, sheathing, draft stopping, bracing, and fasteners in place
- 5
Insulation
After insulation placed, prior to covering walls
- 6
Final Inspection
After construction is complete
Applies to: Residential Addition / Remodel Permit
- 1
Foundation & Foundation Wall
After trenches excavated, reinforcement in place, forms erected, prior to concrete
- 2
Underground
Prior to covering piping/wiring and prior to concrete
- 3
Rough Trade
Plumbing/mechanical/electrical rough-in complete, prior to covering
- 4
Rough Frame
Roof, framing, fire stopping, sheathing, draft stopping, bracing, fasteners in place
- 5
Insulation
After insulation placed, prior to covering walls
- 6
Final Inspection
After the addition/remodel is completed
Applies to: Deck / Patio Cover / Carport Permit
- 1
Footings
After trenches excavated, forms erected, prior to concrete pour
- 2
Frame/Rough Inspection
After roof (if covered), framing, bracing, and fasteners in place; utility inspection if installed
- 3
Final Inspection
After the structure is completed
Applies to: Commercial Alteration / Tenant Improvement Permit
- 1
Rough Trade
Electrical/mechanical/plumbing rough-in prior to concealment
- 2
Final Inspection
After tenant improvement work is completed
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel installed before concealment
- 2
Final Inspection
Devices installed, panel labeled, system verified
Applies to: EV Charger / EVSE Permit
- 1
Rough Electrical
Wiring and panel connections before concealment, if applicable
- 2
Final
Charger installed and connections verified per the adopted NEC edition
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment
- 2
Final Inspection
Fixtures connected, no leaks, proper venting
Applies to: Reroof Permit
- 1
Mid-Roof Inspection
Required only for flat and tile roofs
- 2
Final Roof Inspection
Permit holder must call for final inspection; ladder must be on-site tied off to roof
Applies to: Rooftop Solar Photovoltaic Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before cover
- 2
Final Inspection
Racking, roof penetrations, and electrical connections verified
Final inspection only: Demolition Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Castle Pines building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Castle Pines building permits
Get alerts for Castle Pines
We'll email you when Castle Pines's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.