Burlington building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Burlington, Colorado.
Verified 2026-07-23 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 415 15th Street, Burlington, CO 80807
- Phone
- 719-346-8652
- Office hours
- Monday through Friday, 7:00 a.m. to 4:00 p.m. Fax: 719-346-8397. Building permits are administered directly by City Hall administrative staff (no separate, dedicated Building Division or named Building Official is published) — the Building Permit Application lists Jim Keehne, City Administrator, as the responsible city officer, with a Public Works signoff line also present on the form.
- Website
- Official site
Inspection sequence
Applies to: Residential Addition / Remodel Permit
- 1
Utility Locate Verification
Required before any excavation-involving addition work begins
- 2
Final/Field Inspection
No itemized inspection sequence is published; Public Works signoff line appears on the permit form
Applies to: Residential Building Permit (New Construction / Addition)
- 1
Utility Locate Verification
811/800-922-1987 line-locate ticket must be completed and the Locate Form returned to City Hall before construction begins
- 2
Final/Field Inspection
Because no local building code is adopted and no dedicated Building Division/inspector is named in available City materials, Burlington does not publish a specific inspection sequence (e.g., foundation, framing, rough-in, final) for standard construction the way code-adopting jurisdictions in this corpus do. The permit form includes a 'Public Works' signoff line, indicating Public Works staff play some inspection/signoff role, but no itemized inspection checklist is published.
Applies to: Rooftop Solar PV Permit
- 1
State Electrical Inspection (interconnection)
Performed by a Colorado State Electrical Board inspector, per this file's directly-confirmed (2026-07-13) electrical-permit jurisdictional determination
- 2
Final/Field Inspection (structural/roof-mounting)
No itemized City inspection sequence for solar mounting is published
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Burlington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Burlington building permits
Get alerts for Burlington
We'll email you when Burlington's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.