Skip to main content
PermitBase

Burlington building permits

Department contacts, adopted codes, permit types, fees, and gotchas for Burlington, Colorado.

Last verified 2026-07-23 · Source · Embed this page’s badge · Version history

Building department

Address
415 15th Street, Burlington, CO 80807
Phone
719-346-8652
Office hours
Monday through Friday, 7:00 a.m. to 4:00 p.m. Fax: 719-346-8397. Building permits are administered directly by City Hall administrative staff (no separate, dedicated Building Division or named Building Official is published) — the Building Permit Application lists Jim Keehne, City Administrator, as the responsible city officer, with a Public Works signoff line also present on the form.

Inspection guide

See how inspections work in Burlington — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • NONE LOCALLY ADOPTED — per the City's own Building Permit Application form (DocumentCenter/View/187), which the applicant must sign: 'I hereby agree and understand that City of Burlington has not adopted a building code… Show full text

    NONE LOCALLY ADOPTED — per the City's own Building Permit Application form (DocumentCenter/View/187), which the applicant must sign: 'I hereby agree and understand that City of Burlington has not adopted a building code and it is my responsibility to follow all state guidelines regarding state building codes, local building codes and all inspections the State of Colorado, City of Burlington and the Colorado Department of Local Affairs and Housing may require.'

  • The City's own Building Codes webpage (burlingtoncolo.com/96/Building-Codes) states that the City 'requires all buildings to meet the compliance standards of the State of Colorado's building codes' and links to the… Show full text

    The City's own Building Codes webpage (burlingtoncolo.com/96/Building-Codes) states that the City 'requires all buildings to meet the compliance standards of the State of Colorado's building codes' and links to the Colorado Office of the State Architect (OSA) building-codes page (osa.colorado.gov/state-buildings/building-codes). That OSA page's adopted-code list applies ONLY to state-owned and state-lease-purchased construction and specific state-assisted categories (K-12 schools, health facilities), NOT to private construction in municipalities. Burlington's reference to it therefore does not establish any specific IBC/IRC/IECC/NEC edition as locally adopted or locally enforced for private building permits — it points at a source that does not govern ordinary residential or commercial permits in Burlington.

  • Net effect: Burlington has NO locally adopted model code edition — no IBC, IRC, IMC, IPC, IFGC, IECC, IFC, IEBC or NEC edition/year is specified anywhere in the City's own building-permit materials OR in its codified Municipal Code. Show full text

    Net effect: Burlington has NO locally adopted model code edition — no IBC, IRC, IMC, IPC, IFGC, IECC, IFC, IEBC or NEC edition/year is specified anywhere in the City's own building-permit materials OR in its codified Municipal Code. Applicants are directed to follow 'state guidelines' generally and Colorado DOLA/Division of Housing requirements where applicable. The Municipal Code itself supports this directly: Title 15 DOES contain a 'Chapter 15.04 - BUILDING CODE ADOPTED', but the codified chapter has no adoption section in it — it runs 15.04.020 (Fee for building permit) then 15.04.030 (Fire zones established), with no 15.04.010 and no model-code-adoption text anywhere in the chapter, despite the chapter's own title. The remaining chapters of Title 15 are 15.14 (Manufactured Housing) and 15.16 (Mobile Home Parks), neither of which adopts a model code. Source: City of Burlington Code of Ordinances Title 15 (Buildings and Construction), library.municode.com (nodeId TIT15BUCO).

  • Burlington's codified building chapter still carries a Uniform Building Code cross-reference, which is the likely explanation for the absence of an I-code adoption section above. Show full text

    Burlington's codified building chapter still carries a Uniform Building Code cross-reference, which is the likely explanation for the absence of an I-code adoption section above. Burlington Code of Ordinances Sec. 15.04.030 ('Fire zones established') reads verbatim: 'For the purpose of applying the Uniform Building Code, all of the area within the corporate limits of the city is divided into two fire zones. Fire Zone 1 shall consist of all that part of the city included within the boundaries of Zoning Districts C-1 and L-1 as shown upon the official copy of the city zoning district map on file in the office of the city clerk. There shall be no Fire Zone 2. Fire Zone 3 shall consist of all that portion of the city not included within Fire Zone 1 as described in this section.' (Prior code Sec. 11.3.) The Uniform Building Code is the pre-2000 ICBO code family that the I-codes replaced, and the chapter was never re-pointed at an I-code edition. Note the internal oddity in the section as written: it announces 'two fire zones' and then names Zone 1 and Zone 3 while expressly abolishing Zone 2 — that is how the ordinance reads. The section states no UBC edition year, so it does not amount to adoption of any particular UBC edition; it is a surviving cross-reference in a chapter whose adoption section is absent. Source: City of Burlington Code of Ordinances Title 15 (Buildings and Construction), on library.municode.com.

  • CORRECTION RECORDED 2026-08-17. No code edition changed in this record and no figure changed, because Burlington's headline claim turned out to be right. Show full text

    CORRECTION RECORDED 2026-08-17. No code edition changed in this record and no figure changed, because Burlington's headline claim turned out to be right. What changed is that the claim no longer rests on 'Municode could not be crawled'. The distinction matters and is the whole point of this campaign: 'I read Chapter 15.04 and it contains no adoption section' is evidence of absence; 'my crawler could not read Municode, and nothing turned up' is not. The chapter also yielded two facts the blocker had hidden — the surviving Uniform Building Code cross-reference at Sec. 15.04.030, and the fact that the valuation fee schedule is CODIFIED at Sec. 15.04.020 (Ord. No. 952, Sec. 1, 3-9-2020) rather than merely printed on a form.

Permit types & fees

Burlington's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Burlington yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Burlington lands. Privacy.

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
No data reported
Trailing 12 months
No data reported
Year to date (2026 YTD)
No data reported
Full year 2025
1units

1 buildings · $97,800 valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Burlington has NOT adopted a local building code. The City's own Building Permit Application requires the owner to sign an acknowledgment that 'City of Burlington has not adopted a building code.' Do not assume any specific IBC/IRC/IECC/NEC edition applies; the applicant is responsible for following applicable State of Colorado guidance instead.
  • A mandatory utility line locate (811 or 800-922-1987) with a separate 'Building Permit Locate Form' is required before any construction begins — budget approximately 3 business days for the locate ticket, which is valid for 30 days once issued.
  • A 2% city use tax (Burlington Municipal Code Chapter 3.08) applies to construction/building materials purchased outside city limits, computed either by estimate at permit issuance (50% of project replacement cost deemed taxable) or via an affidavit that all materials will be purchased from a licensed in-city retailer.
  • Electrical and plumbing work in Burlington defaults to the Colorado State Electrical Board and State Plumbing Board (DORA) permit/inspection systems — DIRECTLY CONFIRMED 2026-07-13 via DORA's own current, accessible jurisdiction page (dpo.colorado.gov/ElectricalPlumbingPermits), which explicitly lists every county with its own local Electrical or Plumbing Inspection Program; Kit Carson County is absent from both lists, and Burlington's own permit materials describe no separate City trade-permit process.
  • There is no population-based exemption from Colorado's HB22-1362 statewide energy-code framework — a proposed 2,500-population municipal exemption (SB25-141) was postponed indefinitely by the Colorado legislature in March 2025 and never became law. Burlington (population roughly 3,150-4,400 depending on source) is not currently subject to HB22-1362's energy-code mandate only because it has never adopted (and therefore never updated) a building code — if it does adopt one going forward, HB22-1362's update-triggered energy-code floor would apply.
  • The City's own Building Permit Fee schedule is valuation-based (not a flat fee): $25 minimum for projects valued $1-$500, scaling through published tiers up to $15,670 plus $1.00 per additional $1,000 for projects over $5,000,000. An additional, unpublished 'Administrative Fee' line also appears on the permit form — confirm its amount directly with City Hall.
  • No dedicated Building Division or named Building Official/inspector is published anywhere in Burlington's available online materials — building permits are administered by City Hall general staff, with the City Administrator (Jim Keehne) named on the permit form and a 'Public Works' signoff line also present, suggesting Public Works handles field inspection duties.
  • Burlington's Code of Ordinances is hosted on Municode as a JavaScript-only single-page application; consulting other codified Burlington provisions requires reading the Municode site in a browser or contacting the city directly. Ordinance No. 990 (dangerous-building abatement), however, is available in full via the City's own DocumentCenter PDF (burlingtoncolo.com/DocumentCenter/View/909) rather than through Municode — see the demolition-permit entry.
  • No distinct Accessory Dwelling Unit (ADU) ordinance exists for Burlington, CO — a directly verified negative from Burlington Municipal Code Title 17 (Zoning) on Municode (see below): the accessory-uses section (17.20.060) does not include a second dwelling unit, and a second unit on an R-1 lot is instead classed as 'multifamily' and requires Special Review from the Board of Adjustment and Appeals (17.20.010(B)(4), Chapter 17.32) rather than being permitted by right. Burlington is also not a Colorado HB24-1152 'Subject Jurisdiction' (it lies within no Metropolitan Planning Organization boundary), so there is no state-law mandate forcing Burlington to allow ADUs either.
  • Burlington's Code of Ordinances is published on Municode (library.municode.com/co/burlington), including Title 17 Zoning, Chapters 17.08, 17.20, and 17.32. Municode presents the codified ordinance text in a web browser rather than as static pages; Burlington ordinances not otherwise available as standalone City-hosted PDFs can be read there.
  • Two genuine gaps and one recent change worth knowing. First, no standalone sign ordinance exists: Title 17, all eleven chapters, has no sign-dimension standard and no sign-permit application, and signs are regulated only as one of several minor 'structures' subject to yard-setback and lot-coverage rules (17.20.150/160/180). Second, no fire code or fire sprinkler and alarm permit process is published by either the City or the Burlington Volunteer Fire Department, a rural fire protection district organized in 1952 — Title 8 has no Fire Prevention chapter at all. The recent change: City of Burlington Ordinance No. 1016, an emergency ordinance adopted 3/30/26 and published 4/9/26, adopted the 2025 Colorado Wildfire Resiliency Code as new Section 15.04.040 under the statewide mandate in C.R.S. 24-33.5-1237(2)(a). That is a wildfire-hardening building and materials code, not a fire-suppression code, and it is not yet reflected in the codified online text, so read the ordinance itself. By contrast, a change-of-use requirement is real and directly codified: Municipal Code 17.12.020(A)(3)-(4) requires a certificate of zoning compliance to change the use of any building, structure or property in the city.

Comparable nearby cities

Cheyenne Wells
7 shared permit types~34 mi away
Compare fees →