Berthoud building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Berthoud, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 807 Mountain Ave, Berthoud, CO 80513 (PO Box 1229, Berthoud, CO 80513)
- Phone
- 970-532-2643 (option 3); alt. 970-344-5828
- Office hours
- Main line 970-532-2643 option 3 (fax 970-532-0640). Inspections are performed under contract by SAFEbuilt/ProCode — phone 970-305-3161 ext. 1, online scheduling via the Town's CommunityCore portal; inspection requests must be received by 4 p.m. for next-business-day completion.
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation
Before concrete pour, per 30-inch minimum frost depth and engineered soils report
- 2
Framing
Structural framing complete before cover
- 3
Insulation
Following installation of wall, ceiling, and floor insulation and exterior windows, before wall coverings are installed (IRC R109.1.5.2, locally added)
- 4
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 5
Final Inspection
All work complete per approved plans and applicable codes
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation
Before concrete pour (if new footings)
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans and applicable codes
Applies to: Residential Addition / Remodel / Basement Finish Permit
- 1
Foundation (additions with new footings only)
Before concrete pour
- 2
Rough Frame / Insulation
Framing complete and insulation installed before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans
Applies to: Commercial Tenant Improvement Permit
- 1
Rough Frame / MEP
Structural framing and mechanical/electrical/plumbing rough-ins before concealment
- 2
Fire System Inspection (Berthoud Fire Protection District)
Independent inspection of any sprinkler, alarm, or suppression system; BFPD requires 48 hours advance notice for final inspection, with Tuesday as its primary inspection day
- 3
Final Inspection (Town Building Department)
All work complete per approved plans, prerequisite to Certificate of Occupancy
Applies to: Deck / Patio Cover / Patio Enclosure Permit
- 1
Footing/Foundation
Before concrete pour, for decks/patio covers with new footings
- 2
Framing
Structural framing and connection to existing structure verified
- 3
Final Inspection
All work complete per approved plans
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel installed before concealment
- 2
Final Inspection
Devices installed, panel labeled, system energized and verified
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing (DWV)
Drain-waste-vent system tested by water or air without evidence of leakage before concealment
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified; graywater system verified against NSF 350/Regulation 86 where applicable
Applies to: Re-Roof Permit
- 1
Mid-Roof Inspection
Required for tile roofs and commercial flat roofs only
- 2
Final Inspection
Completed roof verified against code; secured ladder must be provided by the contractor for the inspector; all debris and gutters must be cleaned out before calling for inspection
Applies to: Rooftop Solar / Photovoltaic Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before cover
- 2
Final Inspection
Racking, roof penetrations, and electrical connections verified; solar-ready labeling checked where applicable
Final inspection only: Demolition Permit, EV Charger / EVSE Installation Permit, Furnace / Water Heater Replacement Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Berthoud building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Berthoud building permits
Get alerts for Berthoud
We'll email you when Berthoud's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.